ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 DRAFT (REV_061 114)

Facility:

McGuire Date of Examination:

8/2014 Exam Level (circle one):

RO (only) / SRO(l) / SRO (U)

Operating Test No.:

N 14-1 Control Room Systems@ (8 for RO; 7 for SRO-l; 2 or 3 for SRO-U, including 1 ESF)

Type Code*

Safety System / JPM Title Function A.

061 Auxiliary/Emergency Feedwater (AFW) System [061 A2.07 (3.4/3.5)]

S,M,A,EN 4S CA Suction Source Realignment B.

APE 032 Loss of Source Range NI [032 AA2.05 (2.9/3.2)]

S,D,L,A 7

Respond to a Source Range Nuclear Instrumentation Failure C.

E02 SI Termination [E02 EA1.1 (4.0/3.9)]

S,P,D,A,EN 3

Isolate the NV S/I Flowpath While Terminating Safety Injection D.

EPE E05 Loss of Secondary Heat Sink [E05 EA1.1 (4.1/4.0)]

S,M,A,EN 4P Establish NC System Feed and Bleed E.

APE 057 Loss of Vital AC Bus [057 AA2.18 (3.1/3.1)]

S,N,A 6

Restore Letdown during a Loss of EVDA/EKVA F.

APE 024 Emergency Boration [024 AA2.04 (3.4/4.2)]

S,M,A 1

Emergency Borate the NCS G.

006 Emergency Core Cooling System [006 A1.13 (3.5/3.7)]

S,M,EN 2

Increase Pressure in Cold Leg Accumulator IA H.

008 Component Cooling Water System [008 Al.01 (2.8/2.9)]

S,D 8

KC Pump Functional Verification In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

I.

003 Reactor Coolant Pump System [003 A2.02 (3.713.9)]

D,R 4P Shift Seal Injection Filters J.

001 Control Rod Drive System [001 A2.l0 (3.4/3.9)]

D,L 1

Start up the Unit 1A Motor Generator Set K.

APE 065 Loss of Instrument Air [065 AAI.04 (3.5/3.4)]

D,E 8

Ensure Proper Response of Diesel VI Compressors on Loss of VI NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 DRAFT (REV_061 114)

All RO and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-l / SRO-U (A)lternate path 4-6 (6) /4-6 (6) I 2-3 (2)

(C)ontrol room (D)irect from bank 9 (6) I 8 (5) /

4 (3)

(E)mergency or abnormal in-plant 1 (1) I 1 (1) /

1 (1)

(EN)gineered Safety Feature I

/

1 (2) (Control Room System(

(L)ow-Power / Shutdown 1 (2) I 1 (2) /

1 (1)

(N)ew or (M)odifled from bank including 1(A) 2 (5) /

2 (5) /

1 (2)

(P)revious 2 exams 3 (1)/

3 (1)1 2 (0) (Randomly Selected(

(R)CA 1 (1 )/ 1 (l)I 1 (1)

(S)imulator JPM Summary JPM A This is a modified Bank JPM. The operator will be told that Unit 1 has just tripped from 100%

power, due to seismic activity and that the crew is now implementing EP/l/A/50001E5-0.l (Reactor Trip Response.

The operator will be directed to monitor the ES-0.1 Foldout Page. The operator will be expected monitor the ES-0.1 Foldout Page, determine that Item #2 is applicable and use Generic Enclosure 20 (CA Suction Source Realignment) to realign the suction of the CA Pumps from the non-safety related to the safety-related source (RN).

During the course of this action, the operator will recognize that RN Supply to the lB MDCA Pump cannot be established (Alternate Path), and stop the pump.

JPM 8 This is a Bank JPM. The operator will be told that Unit 1 is in the process of performing a Unit Start-Up, that Control Bank A has been pulled to 50 steps withdrawn, that Mode 2 has just been declared, that Source Range count rate is approximately 60 CPS, that SR channel N-31 has failed low, but that SR channel N-32 is still OPERABLE.

The operator will also be told that AP/1/A/5500/16 Case I (Source Range Malfunctions) has been entered. The operator will be directed to remove the failed SR channel (N-31) from service by performing AP/1/A/5500/16 (Malfunction of Nuclear Instrumentation), Case I

(Source Range Malfunctions). The operator will be expected to place the Source Range N31 Level Trip Bypass Switch to Bypass, and ensure that Source Range N32 is selected on the NIS Recorder. When the only other channel of SR Nuclear Instrumentation fails high and the reactor does not trip (Alternate Path), the operator will recognize that a reactor trip is required and then manually trip the Reactor.

JPM C This is a Bank JPM. The operator will be told that a plant transient at Unit 1 has resulted in a reactor trip from power and a Safety Injection actuation, that Safety Injection Termination criteria has been met and that the crew is implementing EP/1/A/5000/ES-1.1 (Safety Injection Termination).

The operator will be directed to isolate the NV S/I flowpath in accordance with Step 6

of EP/1/A15000/ES-1.1 (Safety Injection Termination). While performing this task the operator will recognize that one NV Pump Recirculation Valve cannot be opened (Alternate Path). The operator will be expected to attempt to isolate NV S/I flow per EP/1/A500/ES-1.1, recognize that this cannot be accomplished and complete Generic Enclosure 18 (Aligning Normal Charging With NV NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 DRAFT (REV 061 114)

Recirc Path Isolated) to realign the NV system for normal charging, close the SI Injection valves and then maintain a minimum amount of charging flow to avoid overheating the NV Pumps.

JPM D This is a modified Bank JPM. The operator will be told that a Reactor Trip on Lo-Lo SIG Level has occurred due to the loss of both Main Feedwater Pumps, that the CA System will not start, that EP/1/A15000/FR-H.1 (Loss of Secondary Heat Sink) has been implemented, and that Feed and Bleed initiation criteria has been met. The operator will be directed to initiate an NC System Feed and Bleed by performing Steps 22

- 28 of EP/1/A15000/FR-H.1 (Loss of Secondary Heat Sink).

When the operator attempts to verify that a high pressure injection flowpath exists, it will be observed that the Safety Injection signal fails to manually actuate (Alternate Path).

The operator will be expected to manually start equipment as needed to establish an RCS feed and bleed flowpath such that all NCPs are off, High Pressure Injection flow is established through NI-9/10 and two Pzr PORVs are open.

JPM E This is a New JPM.

The operator will be told that with Unit 1 performing a reactor startup, the plant trips due to an electrical malfunction.

The crew is currently in EP/1/A/5000/ES-0.1 (Reactor Trip Response).

The operator will be directed to restore letdown in accordance with API1/A/5500/15 (Loss of Vital or Aux Control Power), while the crew continues with this procedure.

The operator will be expected to use AP/1/A15500/1 5 (Loss of Vital or Aux Control Power) to determine that normal letdown is not available (Alternate Path), and place excess letdown in service in accordance with EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 2 (Establishing Excess Letdown).

JPM F This is a Modified Bank JPM.

The operator will be told that with the plant at power, a Reactor Makeup System failure has resulted automatic Control Rod insertion, that MCB Annunciator 1AD-2, A9, CONTROL ROD BANK LO

LIMIT, has
alarmed, that AP/1/A/5500/38 (Emergency Boration) has been entered, and that the lB BA Transfer Pump is OOS.

The operator will be directed to initiate Emergency Boration by performing Step 12 of AP/1/A/5500/38 (Emergency Boration).

After the operator starts the 1A BA Transfer Pump, Panel 1EXMA will de-energize, also de-energizing the 1A BA Transfer Pump (Alternate Path). The operator will be expected to establish Emergency Boration from the FWST.

JPM G This is a Modified Bank JPM. The operator will be told that the plant is at 100% power, that the 1A Cold Leg Accumulator Abnormal Press Alarm is received. The operator will be directed to respond to the alarm in accordance with the Annunciator Response Procedure. The operator will be expected to address the MCB Annunciator 1 AD-9, E 1, select Enclosure 4.3 of OP/1/A/6200/009 to be performed and align N2 to CLA 1A and raise pressure to greater than 610 psig and less than 639 psig.

JPM H This is a Bank JPM. The operator will be placed in a 100% power steady-state condition on Unit 1 with B Train components in service.

The operator will be told that it has become necessary to perform a Functional Verification of the A Train KC Pumps.

The operator will be asked to conduct a Functional Verification of the A Train KC Pumps in accordance with Enclosure 4.5 (KC Pump Functional Verification (Bump Start)) of OP/1/A16400/005 (Component Cooling Water System) using the 1A1 KC Pump.

The operator will be expected to start and stop the 1A1 K Pump, and adjust system flows both before and after pump operation.

NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 DRAFT (REV_061 114)

JPM I

This is a Bank JPM.

The operator will be told that the plant is operating at power and MCB Annunciator 1AD-7, NC PUMP SEAL INJ LO FLOW, has just alarmed.

The operator will be directed to place lB seal injection filter in service and remove the 1A seal injection filter from service by performing OP/i 1A16200/OO1 C (Chemical And Volume Control System Filters) Enclosure 4.2 (Shifting Seal Water Injection Filters and Assisting Maintenance in Change Out), Section 3.5.

The operator will be expected to shift seal injection filters per OP/i/A16200/001C.

JPM J This is a Bank JPM. The operator will be told that a unit start-up is in progress on Unit 1 and that all requirements for entering Mode 2 are met. The operator will be directed to start the iA M/G Set per OP/l/A16150/008 (Rod Control) Enclosure 4.1 (M/G Startup) for post maintenance inspection. The operator will be expected to start the 1A M/G Set per OP/i/A161 50/008.

JPM K This is a Bank JPM. The operator will be placed in a situation with both Units at 100%

power when a leak develops in the VI system.

The operator will be told that AP/i/A/5500/22, Loss of VI, has been implemented up to step 5.d, and that VI header pressure is 75 PSIG and going down. The operator will be directed to ensure that Diesel VI compressors are running per Enclosure 4 (Diesel VI Compressor Operation) of AP/i/A15500/22.

During the performance of this Enclosure, the G VI Diesel Air Compressor will fail to start the first time that a manual start is attempted. The operator will be expected to take action to in accordance with the Enclosure and re-start the G VI Diesel Air Compressor.

NUREG-1 021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIMJPMA 2014 Systems

- Control Room JPM A (Rev_061114)

NUREG 1021, Revision 9

Appendix C Page 2 of 1 1 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

CA Suction Source Realignment JPM No.:

2014 Systems

- Control Room JPM A (Alternate Path)

K/A

Reference:

061 A2.07 (3.4/3.5)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

Unit 1 has just tripped from 100% power, due to seismic activity.

The crew is now implementing EP/1/A/5000/ES-0.1 (Reactor Trip Response).

Initiating Cue The CRS has directed you to monitor the ES-0.1 Foldout Page Task Standard:

The operator will monitor the ES-0. 1 Foldout Page, determine that Item

  1. 2 is applicable and use Generic Enclosure 20 (CA Suction Source Realignment) to realign the suction of the CA Pumps from the non safety related to the safety-related source (RN). During the course of this action, the operator will recognize that RN Supply to the 1 B MDCA Pump cannot be established, and stop the pump.

Required Materials:

None General

References:

EP/1/A/5000/E-0 (Reactor Trip or Safety Injection), Rev 33 2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet EPI1IAI5000IES-O.1 (Reactor Trip Response), Rev 37 EPI1IAI5000IG-i (Generic Enclosures), Rev 36 OMP 4-3 (Use of Abnormal and Emergency Procedures), Rev 37 Handouts:

Handout 1: EP/1!A15000/ES-O.1 Foldout Page.

Time Critical Task:

NO Validation Time:

8 minutes 2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset simulator to IC-39 (100%).

2.

Place Simulator in RUN.

3.

Ensure that the B Train of RN is in operation.

4.

Insert REM-CAOO18B=0 to ensure that 1CA-18B (lB CA Pump Suction from lB RN Isol) will not OPEN.

5.

Insert (CA) PLP-078 = 1.48 (Simulates Leak in CAST).

6.

Override ON OBE Exceeded Annunciator (1AD-13 E-7). (IAD13 E07 = ON) 7.

Manually trip the reactor and perform the actions of EP/i/A15000!E-0, and transition to EP/i/A15000/ES-0i.

8.

Ensure both MDCA Pumps are running, acknowledge and silence all annunciators, and Freeze the Simulator.

OR 1.

Reset to IC-244 (April, 2014) 2.

Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.

3.

Leave Simulator in FREEZE until operator is ready to begin.

NOTE:

The BoothlFloor Instructor will need to control BOP during the performance of this JPM and ENSURE that SI Actuation is NOT needed.

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMA11ON (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

IF NC subcooling based on core exit T/Cs is less than 0°F OR Pzr level cannot be maintained greater than 4%, THEN initiate S/I and GO TO EP/1IAI5000IE-0 (Reactor Trip Or Safety Injection).

IF S/I actuation occurs, THEN GO TO EP/i /A!5000/E-0 (Reactor Trip Or Safety Injection).

2. CA Suction Sources:

IF CA Storage Tank (water tower) goes below 1.5 ft, THEN perform EP/1/A15000/G-i (Generic Enclosures), Enclosure 20 (CA Suction Source Realignment).

The operator observes NCS Subcooling Monitors and determines that subcooling is > 0°F.

The operator observes Pzr Level and determines that Pzr Level can be maintained > 4%.

The operator observes the SI Actuation Status Lights and determines that SI is NOT actuated.

The operator CAST Level, determines that level is <

1.5 feet, and addresses Generic Enclosure 20.

  • 1 (EP/i /A/5000/ES-0. I Foldout Page)
1. S/I Actuation Criteria:

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS 2

3 ELEMENTS (Note prior to Step 1) If control room indication of CA storage tank (water tower) has failed, local indication is available in turbine bldg, 760, iB-24.

(Step 1) Align A train RN to CA suction as follows:

(Step i.a) Start iA RN pump.

STANDARD The operator reads the Note and proceeds.

The operator observes the 1A RN Pump Red status light LIT, Green status light OFF; and motor amps at 88 amps, and determines the iA RN Pump is running.

S/U COMMENTS REQUIRED FOR UNSAT

  • 4 (Step 1.b) OPEN 1 RN-69A The operator presses the (iA RN Assured Supply To 1RN-69A OPEN pushbutton Ui CA Isol).

and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

  • 5 (Step i.c) OPEN 1CA-i5A The operator presses the (1A CA Pump Suction From 1CA-15A OPEN pushbutton iA RN Isol) and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on lAD-S.

  • 6 (Step 1.d) OPEN 1 CA-86A The operator presses the (Ui TD CA Pump Suction 1CA-86A OPEN pushbutton From iA RN Isol).

and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 7 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 2) Align B train RN to CA suction as follows:

(Step 2.a) OPEN 1 RN-i 62B The operator presses the (lB RN Assured Supply To 1RN-162B OPEN Ui CA Isol).

pushbutton and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

8 (Step 2.b) OPEN 1CA-18B The operator presses the (lB CA Pump Suction From 1CA-18B OPEN pushbutton 1 B RN Isol).

and observes the Green status light remains LIT, Red status light OFF (Alternate Path).

The operator proceeds to the RNO.

(Step 2.b RNO) IF lB CA The operatorpresses the pump is on, THEN stop lB RESET Pushbuttons and MD CA pump as follows:

observes RESET status lights LIT for both Train A (Step 2.b RNO 1) Reset S/I.

and B SI. (Already RESET) 10 (Step 2.b RNO 2) Reset lB The operator presses the Sequencer.

Sequencer RESET and observes RESET status lights LIT Pushbuttons for both Train A and B.

(Already RESET)

  • i (Step 2.b RNO 3) Stop 1 B The operator presses the CA pump.

STOP pushbutton for the lB MDCA Pump and observes the Green status light LIT, Red status light OFF; and that motor amps drop to 0.

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS 12 13 14 ELEMENTS (Step 2.b RNO 4) IF lB CA pump still on,....

(Step 2.c) OPEN 1CA-116B (Ui TD CA Pump Suction From lB RN Isol).

(Note prior to Step 3) The next step isolates non-safety CA suction sources from 1A CA Pump.

STANDARD The operator observes that the 1 B MDCA Pump is OFF, and proceeds.

The operator presses the 1CA-116B OPEN pushbutton and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

The operator reads the NOTE and proceeds.

S/U COMMENTS REQUIRED FOR UNSAT

  • 15 (Step 3) CLOSE 1 CA-i iA The operator presses the (1A CA Pump Suction Isol).

1CA-11A CLOSE pushbutton and observes the Green status light LIT, Red status light OFF.

16 (Step 4) Isolate non-safety CA suction sources from 1 8 The operator presses the CA pump as follows:

1CA-9B CLOSE pushbutton and observes the Green (Step 4.a) CLOSE 1CA-9B status light LIT, Red status (1 B CA Pump Suction light OFF.

Isol).

17 (Step 4.b) IF 1CA-9B stays The operator recognizes in intermediate position for that 1CA-98 is CLOSED more than 15 seconds, and proceeds.

THEN 2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 9 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 18 (Step 5) Isolate non-safety CA suction sources from TD CA pump as follows:

(Step 5.a) Check the following valves

- OPEN:

1RN-69A (1A RN Assured The operator observes the Supply To Ui CA Isol) 1 RN-69A Red status light LIT, Green status light OFF.

1CA-86A (Ui TD CA Pump The operator observes the Suction From 1A RN Isol).

1CA-86A Red status light LIT, Green status light OFF.

19 (Step Sb) GO TO Step 5.d.

The operator proceeds to Step S.d.

  • 20 (Step 5.d) CLOSE 1CA-The operator presses the 7AC (Ui TD CA Pump 1 CA-7AC CLOSE Suction Isol).

pushbutton and observes the Green status light LIT, Red status light OFF.

21 (Step 6) WHEN time allows, THEN....

Cue:

Another operator will complete the remaining steps.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 10 of 1 1 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM A Examinees Name:

Date Performed:

Facility Evaluator:

Numberof Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM A NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Unit 1 has just tripped from 100% power, due to seismic activity.

The crew is now implementing EPI1IAI5000IES-O.1 (Reactor Trip Response).

INITIATING CUE:

The CRS has directed you to monitor the ES-0.i Foldout Page.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM B 2014 Systems

- Control Room JPM B (Rev_050314)

NUREG 1021, Revision 9

Appendix C Page 2 of 13 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Respond to a Source Range JPM No.:

20i4 Systems

- Control Nuclear Instrumentation Failure Room JPM B (Alternate Path)

K/A

Reference:

APE 032 AA2.05 (2.9/3.2)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout I.

InitiI (nnr1itin I mit i ic fh rnr rf rrfrrminn I mit frf-I Ir SR channel N-32 is still OPERABLE.

AP/1/A5500/16 Case I (Source Range Malfunctions) has been entered.

Initiating Cue.

The CR5 has directed you to remove the failed SR channel (N-3i) from service by performing API1IA/55001i6 (Malfunction of Nuclear Instrumentation), Case I (Source Range Malfunctions).

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 3 of 13 Form ES-C-i Job Performance Measure Worksheet Task Standard:

The operator will place the Source Range N31 Level Trip Bypass Switch to Bypass, and ensure that Source Range N32 is selected on the NIS Recorder. When the only other channel of SR Nuclear Instrumentation fails high and the reactor does not trip, the operator will recognize that a reactor trip is required and then manually trip the Reactor.

Required Materials:

None General

References:

API1IA/5500116 (Malfunction of Nuclear Instrumentation), Rev 14 OP/i/A/6100/O1OA (Annunciator Response For Panel 1FO-1) Rev 14, ARP1FO1/A-6, S/R HI Flux RxTrip EP/1IAIAJ5000IE-O (Reactor Trip or Safety Injection), Rev 33 McGuire Technical Specifications, LCO 3.3.1 (RTS Instrumentation),

Amendment 184/1 66 Handouts:

Handout 1: AP/i/A/5500/16 Malfunction of Nuclear Instrumentation, Case I

Time Critical Task:

NO Validation Time:

7 minutes 2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 4 of 13 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset Simulator to IC-26 (Mode 2, Normal operating temp/press, CBA at 50 steps withdrawn.)

2.

Insert Mal ENB-2A (SR Channel 31 Failure); Select = 0, Activate 3.

Insert Mal IPE0O1A (Failure of Auto Reactor Trip A train) 4.

Insert Mal 1PE001 B (Failure of Auto Reactor Trip B train) 5.

Insert Mal ENB-002B (SR Channel 32 Failure); Set = ie+006, Set to Trigger 1.

6.

Freeze Simulator.

7.

G0t0RUN.

8.

Place Audio Count Rate and Startup Rate selectors to SR N-32 prior to implementing this JPM.

OR 1.

Reset Simulator to Temporary Snap IC-245 (April, 2014).

NOTE:

During the performance of the JPM, the Simulator Driver will be required to activate Trigger #1 when the operator places the operable Source Range Channel to record on the NIS Recorder in API6 Case I, step 14.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 5 of 13 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Caution prior to Step 1)

The operator reads Caution Pulling SIR control power and proceeds.

fuses anytime the S/R is energized will result in a reactor trip unless the affected channel is blocked in SSPS (SIR TRAIN (A/B)

TRIP BLKD HI VOLTAGE OFF status light on 1SI-18 is lit).

2 (Caution prior to Step 1)

The operator reads Caution Pulling S/R instrument and proceeds.

power fuses with the S/R energized will result in a reactor trip unless:

Affected channel LEVEL TRIP switch is in BYPASS OR Affected channel is blocked in SSPS (S/R TRAIN (A/B) TRIP BLKD HI VOLTAGE OFF status light on 1SI-18 is lit).

3 (Note prior to Step 1) Audio The operator reads Note count rate is only supplied and proceeds.

from S/R channels N-31 or N-32.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 6 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUI RED FOR UNSAT 4

(Note prior to Step 1) In The operator reads Note Mode 6, the W!R Neutron and proceeds.

Flux Monitors can be used as S/R neutron flux indication.

5 (Step 1) Check at least one The operator recognizes that of the following S/R SR Channel N32 is Channels

- OPERABLE OPERABLE as identified in the initial conditions.

N-31 OR N-32 6

(Step 2) Announce The operator makes a page occurrence on paging announcement indicating system.

that SR Channel N31 has failed.

Cue:

If asked, the U2 RO makes the page announcement.

7 (Step 3) Check unit status The operator recognizes IN MODE 6.

from initial conditions that the plant is in Mode 2 and proceeds to the RNO.

8 (Step 3 RNO) GO TO Step The operator proceeds to 6.

Step 6.

9 (Step 6) Check S/R The operator determines detector(s)

- HIGH from initial conditions that VOLTAGE the plant is in Mode 2 and INADVERTENTLY proceeds to the RNO.

APPLIED AT POWER (ABOVE P-b).

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 7 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 10 (Step 6 RNO) GO TO Step The operator proceeds to 7.

Step 7.

1 1 (Step 7) Check S/R HI The operator observes MCB FLUX AT SHUTDOWN Annunciator 1AD2/D3 and alarm (1AD-2, D-3)

- DARK determines that the window is DARK.

12 (Step 8) Monitor available The operator observes I/R Channels and W/R Neutron Flux is below the Neutron Flux Monitors I/R Channels scale.

The operator observes that W/R Monitor indications are stable.

13 (Step 9) Check if failure has The operator determines occurred on any of the from initial conditions that N-following S/R Channels:

31 has failed.

N-31 The operator observes SR OR Channel N31 indication at N-32 0.

14 (Step 10) Check at least The operator recognizes that one of the following S/R SR Channel N32 is channels OPERABLE OPERABLE as identified in the initial conditions.

N-31 OR The operator observes SR N-32 Channel N32 is reading 60 CPS.

15 (Step 1 1) Check unit status The operator determines

- IN MODE 3, 4, 5, 6 OR from initial conditions that NO MODE the plant is in Mode 2 and proceeds to the RNO.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 8 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step ii RNO) IF in Mode 2 The operator determines below P-6, THEN suspend unit is in Mode 2 and below operations involving positive P-6 (10 -10 IR amps), and reactivity additions.

observes rod withdrawal has stopped.

rtup has been led 17 (Step 12) Perform the following actions on the failed S/R drawer:

(Step i2.a) Place the The operator places the N31 LEVEL TRIP switch to Level Trip switch to BYPASS BYPASS and observes Level Trip light is LIT.

(Step i2.b) Check LEVEL TRIP BYPASS light

- LIT (Step i2.c) Place the HIGH The operator recognizes that FLUX AT SHUTDOWN the High Flux at Shutdown switch to BLOCK.

Switch is in the BLOCK position.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 9 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 18 (Step 13) Check the following S/R indications:

(Step 1 3.a) Check SIR The operator observes MCB OR I/R TRIP BYPASS Annunciator 1AD2/E2 and alarm (1AD-2, E-2) determines that the window LIT.

is LIT.

(Step 13.b) Check the failed channels status light on 1SI-i9:

The operator observes the iIN-3iB S/R N31 Trip Bypass status light CHANNEL I is LIT.

TRIP BYPASS LIT OR 1IN-32B S/R CHANNEL II TRIP BYPASS LIT.

(Step 13.c) Check unit The operator proceeds to status

- IN MODE 3,,

the Ste 13 c RNO 5, 6, OR NO MODE.

19 (step i3.c RNO) Perform The operator recognizes that the following:

the plant is in Mode 2 below P-6, and proceeds to Step (step 13.c RNO 1) IF unit 13.d.

status in Mode 2 below P-6, THEN GO TO Step 13.d.

20 (Step i3.d) Check S/R HI The operator observes MCB FLUX ALM BLOCKED Annunciator 1AD2/D2 and alarm (1AD-2, D-2)

- LIT.

determines that the window is LIT.

  • 21 (Step 14) Place operable The operator places Source S/R channel to record on Range Instrument N32 on NIS Recorder.

the NIS Recorder.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 10 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT NOTE:

Simulator Driver Operate Trigger #1.

This will cause the SIR HI FLUX RX TRIP alarm on IFO-1lA5 (An automatic Reactor Trip should occur, however, the RPS has failed. The Operator may address the Annunciator Response Procedure, however, it is expected that the reactor will be manually tripped)

Examiner NOTE: (Alternate Path) It is expected that the operator will Trip the Reactor.

  • 22 (Step 2) Check Reactor The operator manually trips Trip the reactor.

All rod bottom lights

LIT NOTE: The remainder of the operator actions will be Reactor trip and bypass performed from memory breakers OPEN The operator observes all Rod Bottom lights are LIT hR amps GOING (green)

DOWN The operator observes Reactor Trip Breaker green status lights are LIT.

The operator observes that both hR SUR indications are trending down 23 (Step 3) Check Turbine Trip All throttle valves The operator observes the CLOSED Four STAT lights for throttle valves are LIT.

24 (Step 4) Check 1 ETA and The operator observes that 1 ETB

- ENERGIZED UV STAT lights for 1 ETA and 1 ETB are DARK.

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page ii of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 25 (Step 5) Check if S/I is actuated:

(Step 5.a) SAFETY INJECTION ACTUATED The operator observes that status light (1SI-18)

- LIT.

S/I actuate light is DARK.

26 (Step 5.a RNO) Perform the following:

(Step 5.a RNO 1)

Check if S/I is required:

Operator observes that Pzr pressure is greater than Pzr pressure less than 2200 and stable and that 1845 Containment pressure is.15 OR PSIG and stable; and Containment pressure reports that Safety Injection greater than 1 PSIG is NOT required.

Cue:

The CRS acknowledges the report.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 12 of 13 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM B Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM B NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Unit 1 is in the process of performing a Unit Start-Up.

Mode 2 has just been declared.

Control Bank A has been pulled to 50 steps withdrawn.

Source Range count rate is approximately 60 CPS.

SR channel N-3i has failed low.

SR channel N-32 is still OPERABLE.

API1IAI5500I16 Case I (Source Range Malfunctions) has been entered.

INITIATING CUE:

The CRS has directed you to remove the failed SR channel (N-3i) from service by performing AP/i/A15500/i6 (Malfunction of Nuclear Instrumentation), Case I (Source Range Malfunctions).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM C 2014 Systems

- Control Room JPM C (Rev_061314)

NUREG 1021, Revision 9

Facility:

Task

Title:

McGu ire Isolate the NV S/I Flowpath While Terminating Safety Injection Task No.:

JPM No.:

2014 Systems

- Control Room JPM C (Alternate Path)

K/A

Reference:

E02 EA1.l (4.0/3.9)

Examinee:

NRC Examiner:

Facility Evaluator:

Method of testing:

Date:

Simulated Performance:

Classroom READ TO THE EXAMINEE Simulator Actual Performance:

X Plant x

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Ensure Handout I is placed on CRS Desk.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM).

Initiating Cue:

The URS has directed you to isolate the NV S/I tlowpath in accordance

,A,ifh fcr

,,f PI1/AItflflflI..1 I (fhi inicrfirn Thrminfinr Task Standard:

The operator will attempt to isolate NV S/I flow per EP/1/A1500/ES-1.1, recognize that this cannot be accomplished and complete Generic 8 to realign the NV system for normal charging, close the SI Injection valves and then maintain a minimum amount of charging flow to avoid overheating the NV Pumps.

Required Materials:

None Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet 2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet General

References:

EPI1IAI5000IES-1.1 (Safety frnjection Termination), Rev 26 EPI1IAI5000/G-1 (Generic Enclosures), Rev 36 Handouts:

Handout 1: EPI1IAI5000IES-1.i (Safety Injection Termination) marked up through Step 5, open on the CRS Desk.

Handout 2: Blank Copy of EPI1IAI5000IG-1 (Generic Enclosures),

Generic Enclosure 18 (Aligning Normal Charging With NV Recirc Path Isolated).

Time Critical Task:

NO Validation Time:

12 minutes 2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES i.

Reset the Simulator to IC-39 (100%)

2.

Insert MAL-ISEOO6A = BLK_BOTH (Failure of MSI Signal Train A)

Insert MAL-ISEOO6B = BLK_BOTH (Failure of MSI Signal Train B)

Insert MAL-SMOO9 (Main Steam Header Break)

(Event requiring SI initially, but as transient progresses will lead to implementation of SI Termination).

3.

Manually close MSIVs when NC pressure decreases to less than 2000 psig.

4.

Ensure that 1NV-150B and 1NV-i5iA are CLOSED (Simulating closure of valves on E-0 Foldout Page requirement to close. NOT re-opened per Foldout Page as of yet) 5.

Insert REM-NVO151A = 0 (1NV-151A (Ui NV Pump Recirc Isol) is stuck CLOSED).

6.

Perform all EP actions up to through step 5 of EP/1/A15000/ES-1.i, and markup CRS Desk copy of procedure.

7.

Ensure that NC System pressure is 2000 psig and rising.

8.

Stabilize plant conditions and Freeze the Simulator OR 1.

Reset Simulator to Temporary Snap IC-227 (April, 2014) 2.

Momentarily place Simulator in Run to acknowledge alarms.

3.

Leave Simulator in FREEZE until operator is ready to begin.

NOTE:

During the performance of this JPM, the Simulator Instructor will need to monitor unrelated alarms and silence as needed.

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Ensure Handout I is placed on CRS Desk.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 6) Isolate NV S/I The operator observes the flowpath as follows:

1 NV-221A Red status light is LIT, and Green status (Step 6.a) Check the light is OFF.

following valves

- OPEN:

1 NV-221A (Ui NV Pump The operator observes the Suct From FWST Isol) 1NV-222B Red status light is LIT, and Green status 1NV-222B (Ui NV Pump light is OFF.

Suct From FWST Isol).

2 (Step 6.b) Check the The operator observes the following valves

- OPEN:

1NV-1 508 Green status 1NV-i 508 (Ui NV Pump light is LIT, and Red status Recirc Isol) light is OFF.

1NV-i5iA(Ui NV Pump The operator observes the Recirc Isol).

1NV-i5iA Green status light is LIT, and Red status light is OFF.

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 6.b RNO b) Perform The operator presses the the following.

1 NV-I 508 OPEN (Step 6.b RNO b.1) OPEN pushbutton and observes vaves.

the Red status light is LIT, and Green status light is OFF.

The operator presses the 1NV-151A OPEN pushbutton and observes the Green status light remains LIT, and Red status light remains OFF.

(Alternate Path) 4 (Step 6.b RNO b.2) IF both The operator recognizes valves open, THEN that both valves are NOT open and continues.

(Step 6.b RNO b.3)

The operator contacts an Dispatch operator to OPEN AO and directs that they affected valve(s),

open 1NV-151A locally.

1NV-1 508 (aux bldg, 71 6+8, HH-55, room 627, NV pump room iA, west of pump motor)

The AO acknowledges.

1NV-151A (aux bldg, 716+9, HH-55, room 627, NV pump room iA, west of pump motor).

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6

(Step 6.b RNO b.4) Realign The operator proceeds to charging PER Generic Enclosure 18.

EP/1 /AI5000IG-1 (Generic Enclosures), Enclosure 18 Examiner Note:

(Aligning Normal Charging With NV Recirc Path When the operator Isolated).

locates the G-1 Notebook, provide the operator with Handout 2.

7 (Enclosure 18, Step 1)

The operator observes Check VI header pressure

OVIP-5090 and determines GREATER THAN 60 PSIG.

that VI header pressure is 108 psig.

8 (Step 2) Check NC pump The operator observes seal injection flow -

1 NVP-5300, 5310, 5320 GREATER THAN OR and 5330 and determines EQUAL TO 6 GPM TO that Seal Injection flow to EACH NC PUMP.

each NCP is greater than 6 gpm.

9 (Step 3) GO TO Step 8.

The operator proceeds to Step 8.

  • 10 (Step 8) CLOSE 1 NV-241 The operator adjusts the (Ui Seal Water Inj Flow 1NV-241 Manual Loader Control).

counter-clockwise until the Manual Loader output equals 0%.

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

(Step 9) Check one of the following valves

- OPEN:

1 NV-i 3B (Ui NV Supply To 1A NC Loop Isol)

OR 1 NV-i 6A (U 1 NV Supply To 1 D NC Loop Isol).

The operator observes the INV-i3B Red status light is LIT, and the Green status light is OFF.

12 (Step 10) Check 1NV-2iA The operator observes the (Ui NV Supply to Ui Aux 1 NV-21A Green status light PZR Spray Isol)

- CLOSED.

is LIT, and the Red status light is OFF.

  • i3 (Step 1 i) OPEN the The operator presses the following valves:

1 NV-244A OPEN 1NV-244A (Ui Charging pushbutton and observes Hdr Cont Outside Iso) the Red status light is LIT, Green status light OFF.

1NV-245B (Ui Charging The operator presses the Hdr Cont Outside Isol).

1 NV-245B OPEN pushbutton and observes the Red status light is LIT, Green status light OFF.

  • 14 (Step 12) Establish The operator presses the charging pump minimum Blue M pushbutton on the flow as follows:

i NV-238 SLIMS.

(Step 12.a) Place 1NV-238 (Ui Charging Hdr Control) controller in manual.

15 (Step 12.b) Check NC The operator observes NC pressure

- LESS THAN System pressure is greater 1800 PSIG.

than 1800 psig.

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT ii Examiner NOTE:

INV-16A is CLOSED.

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 12.b RNO b) Perform The operator presses the the following:

1 NV-238 SLIMS OUTPUT (Step 12.b RNO b.1) Fully Raise pushbutton until OPEN 1NV-238 (Ui SLIMS output is at 100%.

Charging Hdr Control).

17 (Step 12.b RNO b.2) IF The operator recognizes 1 NV-238 cannot be that this step is NOT operated from the Control applicable and continues.

Room 18 (Step 12.b RNO b.3) IF NC The operator observes NC pressure less than 2000 System pressure is greater 2000 psig.

  • 19 (Step 12.b RNO b.4)

The operator adjusts the THROTTLE 1NV-241 (UI 1NV-241 Manual Loader Seal Water Inj Flow Control) clockwise until the Manual to 50% OPEN.

Loader output equals 50%.

20 (Step 12.b RNO b.5) IF The operator recognizes 1 NV-241 cannot be that this step is NOT operated from the Control applicable and continues.

Room 21 (Step 12.b RNO b.6) GO The operator proceeds to TO Step 13.

Step 13.

  • 22 (Step 13) CLOSE the The operator presses the following valves:

1 Nl-9A CLOSE pushbutton and observes the Green 1NI-9A (NC Cold Leg Inj From NV) status light is LIT, Red status light is OFF.

1NI-1OB (NC Cold Leg Inj The operator presses the From NV).

iNllOB CLOSE pushbutton and observes the Green status light is LIT, Red status light is OFF.

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Caution prior to Step 14)

The operator reads the Failure to maintain charging Caution and proceeds.

flow above 80 GPM will result in inadequate NV pump miniflow protection.

This limit applies to all subsequent EPs.

  • 24 (Step 14) THROTTLE The operator observes charging and seal injection Charging flow (1 NVP5630) to maintain the following:

to be between 80-200 gpm.

Charging flow between 80 GPM and 200 GPM The operator observes Seal injection flow 6-10 1NVP-5300, 5310, 5320 GPM per NC pump.

and 5330 and determines that Seal Injection flow to each NCP is between 6-10 gpm.

Examiner Note:

The operator may make the necessary adjustments.

25 (Step 15) RETURN TO The operator reports that procedure and step in NV S/I Flow has been effect.

isolated per Generic 8.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM C NUREG 1021, Revision 9

Appendix C Page ii of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM C Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems - Control Room JPM C NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

A plant transient at Unit i has resulted in a reactor trip from power and a Safety Injection actuation.

Safety Injection Termination criteria has been met and the crew is implementing EPI1IAI5000/ES-1.1 (Safety Injection Termination).

INITIATING CUE:

The CRS has directed you to isolate the NV S/I flowpath in accordance with Step 6 of EP/i/A/5000/ES-i.i (Safety Injection Termination).

NUREG 102i, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM D 2014 Systems

- Control Room JPM D (Rev_061214)

NUREG 1021, Revision 9

Appendix C Page 2 of 14 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Establish NC System Feed and JPM No.:

20i4 Systems

- Control Bleed Room JPM D (Alternate Path)

K/A

Reference:

EPE E05 EA1.i (4.1/4.0)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout 1.

Initiil (nnditionq A Pctnr Trin nn I n-I n I(

I cucI h nrri irrcH li i tn th Incc nf Task Standard:

The operator establishes an RCS feed and bleed flowpath such that all NCPs off, High Pressure Injection flow is established through NI-91i0 and two Pzr PORVs are open.

Required Materials:

None 2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 3 of 14 Form ES-C-i Job Performance Measure Worksheet General

References:

EP/1!A/5000!FR-H.1 (Loss of Secondary Heat Sink), Rev. 17 AD-OP-ALL-i 000 (Conduct of Operations), Rev 1 Handouts:

Handout 1: EP!1/A/5000/FR-H.1 (Loss of Secondary Heat Sink) marked up for place-keeping through Step 5.

Time Critical Task:

NO Validation Time:

5 minutes 2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 4 of 14 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset to IC-39, 100%, MOL.

2.

Insert the following malfunctions:

IPEOO1A, Reactor fails to trip in AUTO, Train A IPEOO1 B, Reactor fails to trip in AUTO, Train B DEHOO3A, Turbine fails to trip in AUTO CAOO4A, MDCA Pump A fails to start CAOO4B, MDCA Pump B fails to start CAOO5, TDCA Pump fails to start ISEOO2A, Failure of SI to Actuate in AUTO and MANUAL, Train A ISEOO2B, Failure of SI to Actuate in AUTO and MANUAL, Train B 3.

Place Simulator in Run and acknowledge Annunciator Alarms.

4.

Manually Trip both Feed Pumps.

5.

Allow at least 3 S!Gs to decrease below 24% WR level.

6.

Manually trip the reactor and turbine 7.

Ensure that EP!1/A/5000!FR-H.1 is completed through Step 5. (E-0 to FR-S.1 to FR H.1) 8.

Freeze the Simulator.

OR 1.

Reset Simulator to Temporary Snap lC-247 (April, 2014) 2.

Momentarily place Simulator in Run to acknowledge alarms.

3.

Leave Simulator in FREEZE until operator is ready to begin.

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 22) Perform Steps 23 The operator reads the step through 27 quickly to and proceeds.

establish NC heat removal by NC feed and bleed.

  • 2 (Step 23) Ensure all NC The operator presses the Pumps OFF.

STOP pushbutton for the 1A NCP Pump and observes the Green status light is LIT, and Red status light is OFF.

The operator presses the STOP pushbutton for the 1 B NCP Pump and observes the Green status light is LIT, and Red status light is OFF.

The operator presses the STOP pushbutton for the 1C NCP Pump and observes the Green status light is LIT, and Red status light is OFF.

The operator presses the STOP pushbutton for the iD NCP Pump and observes the Green status light is LIT, and Red status light is OFF.

2014 Systems - Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS

  • 3 ELEMENTS (Step 24) Initiate S/I.

STANDARD The operator presses the S/I INITIATE pushbuttons for Train A and Train B, and observes that the SI Actuation status light remains DARK.

S/U COMMENTS REQUIRED FOR UNSAT 4

(Step 25) Check NV PMPS The operator observes NI-TO COLD LEG FLOW

1NVP-6080 at 0 gpm, and INDICATING FLOW.

determines that there is NO flow from the NV Pumps, and proceeds to the Step 25 RNO. (Alternate Path) 5 (Step 25 RNO) Perform the The operator observes the following:

1A NV Pump Green status light is LIT, and determines (Step 25 RNO a) Start NV that the pump is OFF.

Pumps.

The operator presses the 1A NV Pump START pushbutton and observes the Red status light is LIT, Green status light is OFF, and amperage indicated, and determines that the 1A NV Pump is running.

The operator observes the lB NV Pump Red status light is LIT, Green status light is OFF, and amperage indicated, and determines that the 1 B NV Pump is running.

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 7 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 6 (Step 25 RNO b) Start NI The operator observes the Pumps.

1A NI Pump Green status light is LIT, and determines that the pump is OFF.

The operator presses the 1A NI Pump START pushbutton and observes the Red status light is LIT, Green status light is OFF, and amperage indicated, and determines that the 1A NI Pump is running.

The operator observes the lB NI Pump Green status light is LIT, and determines that the pump is OFF.

The operator presses the lB NI Pump START pushbutton and observes the Red status light is LIT, Green status light is OFF, and amperage indicated, and determines that the 1 B NI Pump is running.

NOTE:

Starting one of these pumps satisfies the critical nature of this Step.

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

(Step 25 RNO c) OPEN the following valves:

1NV-221A(U1NV Pump Suct From FWST 1NV222B(U1 NV Pump Suct From FWST Isol)

The operator observes the 1 NV-221A Green status light is LIT, and determines that the valve is CLOSED.

The operator presses the 1NV-221A OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF, and determines that 1 NV 221A is OPEN.

The operator observes the 1 NV-222B Green status light is LIT, and determines that the valve is CLOSED.

The operator presses the 1 NV-222B OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF, and determines that 1 NV 222B is OPEN.

NOTE:

Opening one of these valves satisfies the critical nature of this Step.

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 7 Isol) 2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

(Step 25 RNO d) CLOSE the following valves:

1NV-141A(U1VCT Outlet lsol).

1NV-142B(U1VCT Outlet Isol).

The operator observes the 1NV-141A Red status light is LIT, and determines that the valve is OPEN.

The operator presses the 1NV-141A CLOSE pushbutton and observes the Green status light is LIT, Red status light is OFF, and determines that 1NV-141A is CLOSED.

The operator observes the 1NV-142B Red status light is LIT, and determines that the valve is OPEN.

The operator presses the 1NV-142B CLOSE pushbutton and observes the 1NV-142B Green status light is LIT, Red status light is OFF, and determines that 1NV-142B is CLOSED.

NOTE:

Opening one of these valves satisfies the critical nature of this Step.

Appendix C Page 9 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 8 2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

(Step 25 RNO e) OPEN the following valves:

1 NI-9A (NC Cold Leg Inj.).

The operator observes the 1 NI-9A Green status light is LIT, and determines that 1 NV-9A is CLOSED.

The operator presses the 1 NI-9A OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF.

The operator observes the 1NI-1OB Green status light is LIT, and determines that INV-1OB is CLOSED.

The operator presses the 1NI-10B OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF.

NOTE:

Opening one of these valves satisfies the critical nature of this Step.

10 (Step 25 RNO f) IF NV S/I The operator observes flowpath is established, 1 NVP-6080 at 300 gpm, AND NV Pump is on THEN and determines that there is GO TO Step 26.

flow from the NV Pumps, and proceeds to Step 26.

Appendix C Page 10 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 1 1 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1 1 (Step 26) Establish NC System bleed path as follows:

(Step 26.a) Check all Pzr The operator observes the PORV isolation valves

1 NC-3i B Red status light is OPEN.

LIT, and determines that 1NC-3iB is OPEN.

The operator observes the 1NC-33A Red status light is LIT, and determines that 1NC-33A is OPEN.

The operator observes the 1NC-35B Red status light is LIT, and determines that 1NC-35B is OPEN.

  • 12 (Step 26.b) Select OPEN The operator rotates the on two Pzr PORVs that 1 NC-32B, 34A or 36B have an open Pzr PORV control switch clockwise, isolation valve, and observes the Red status light LIT.

The operator rotates the 1NC-32B, 34Aor36B control switch clockwise, and observes the Red status light LIT.

13 (Step 26.c) Align N2 to Pzr PORVs by OPENING the following valves:

The operator presses the 1 NI-430A (Emerg N2 1 Nl-430A OPEN From CLA To 1 NC-pushbutton and observes 34A).

the Red status light is LIT, Green status light is OFF.

1 NI-431 B (Emerg N2 The operator presses the From CLATo 1NC-32B iNI-43iB OPEN

& 36B).

pushbutton and observes the Red status light is LIT, Green status light is OFF.

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 12 of 14 Form ES-C-i PERFORMANCE INFORMATION 14 (Step 26.d) Check power to The operator observes the all Pzr PORV isolation RED status light LIT for all valves AVAILABLE, three PORV Isolation Valves, and determines that power is available to each.

15 (Step 27) Check two Pzr The operator observes the PORVs and associated I NC-32B, 34A or 36B RED isolation valves OPEN.

status light LIT for two of the three PORVs, and determines that two valves are OPEN.

  • 16 (Step 28) Isolate NV Recirc flowpath as follows:

(Step 28.a) CLOSE the following valves:

The operator presses the 1NV-150B (Ui NV 1NV-150B CLOSE Pump Recirc Isol).

pushbutton and observes the Green status light is LIT, Red status light is OFF.

1NV-151A (Ui NV The operator presses the Pump Recirc Isol).

1NV-151A CLOSE pushbutton and observes the Green status light is LIT, Red status light is OFF.

17 (Step 28.b) Maintain NV The operator reports to the recirc valves closed unless CRS that Steps 22-28 of directed to open by EPI1IAI500IFR-H.1 have subsequent steps.

been performed.

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Terminating Cue:

STOP TIME:

Evaluation on this JPM is complete.

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 13 of 14 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM D Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM D NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

A Reactor Trip on Lo-Lo S!G Level has occurred due to the loss of both Main Feedwater Pumps.

The CA System will not start.

EP/iIAI5000IFR-H.1 (Loss of Secondary Heat Sink) has been implemented.

Feed and Bleed initiation criteria has been met.

INITIATING CUE:

The CRS has directed you to initiate an NC System Feed and Bleed by performing Steps 22

- 28 of EP!iIAI5000/FR-H.i (Loss of Secondary Heat Sink).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM E 2014 Systems

- Control Room JPM E (Rev_061214)

NUREG 1021, Revision 9

Appendix C Page 2 of 14 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Restore Letdown during a Loss of JPM No.:

2014 Systems

- Control EVDAIEKVA Room JPM E (Alternate Path)

K/A

Reference:

APE 057 AA2.18 (3.1/3.1)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM).

Initial Conditions With (mit I rirfrminn rrtrr ctirtiiri thin nIntfrio dii to n inmarina c;LIe i he CRS has nirectei you to restore ietaown in ccomance witn P/1/A/5500/1 dr-

---o e --e ontinues with r Task Standard:

The operator will use AP/i/A/5500/15 (Loss of Vital orAux Control Power) to determine that normal letdown is not available, and place excess letdown in service in accordance with EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 2 (Establishing Excess Letdown).

Required Materials:

None General

References:

AP/i/A15500/i 5 (Loss of Vital or Aux Control Power), Rev 26 2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 3 of 14 Form ES-C-i Job Performance Measure Worksheet EP/i 1A15000/G-i (Generic Enclosures), Rev 36 EPI1IAI5000IES-O.i (Reactor Trip Response), Rev 36 OMP 4-3 (Use of Abnormal and Emergency Procedures), Rev 37 SOMP 01-07 (Control Room Oversight), Rev 1 Handouts:

None Time Critical Task:

NO Validation Time:

10 minutes 2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 4 of 14 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset simulator to IC-i 2 (Reactor Startup in progress Reactor Subcritical).

2.

Place in RUN 3.

Insert MAL-EPLOO2A (Loss of EVDAJLoss of EVKA).

4.

Acknowledge alarms.

5.

Freeze the Simulator.

OR 1.

Reset to lC-248 (April, 2014) 2.

Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.

3.

Leave Simulator in FREEZE until operator is ready to begin.

NOTE:

The Simulator Instructor will need to silence non-pertinent alarms as the JPM is performed.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

(Step 4 RNO) Reduce charging to minimum while maintaining the following:

  • At least 6 GPM to each NC pump seal
  • Pzr level at programmed level.

(Step 5) Check position of all MSIVs (using control board indications or status lights)

- OPEN.

The operator adjusts 1 NV-238 and 1NV-241 as needed to establish at least 6 GPM to each NC pump seal, and to maintain Pzr level at program.

The operator observes that the MSIV Red status lights are LIT, and proceeds.

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

1 (Step 1) Check ND

- IN The operator observes a RHR MODE.

plant startup was in progress and recognizes that RHR is NOT in service.

2 (Step 1 RNO) GO TO Step The operator proceeds to 4.

Step 4.

(Step 4) Check letdown

- IN The operator observes SERVICE.

Letdown flow to be 0, and determines that Letdown is not in service.

(Step 6) Check Vital AC The operator observes the panelboard 1 EKVA top row of channel status energized as follows:

lights and recognizes that they are LIT, and proceeds Top row of channel status to the Step 6 RNO.

lights NORMAL.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

(Step 6 RNO) Perform the following:

(Step 6 RNO a) IF letdown isolated, THEN have available operator restore letdown PER one of the following while continuing with this procedure:

IF letdown orifice valves have power, THEN establish normal letdown PER EPI1/AI5000IG-i (Generic Enclosures), (Establishing Normal Letdown).

OR IF unable to restore normal letdown, THEN establish excess letdown PER EPI1IN5000/G-1 (Generic Enclosures), Enclosure 2 (Establishing Excess Letdown)

The operator observes the 1 NV-457A and 1 NV-458A Green and Red status lights are OFF, and determines that Excess Letdown must be placed in service (Alternate Path).

The operator proceeds to EP/1IAI5000IG-l, (Establishing Excess Letdown).

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCE INFORMATION

  • 7 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Cue:

If the operator informs the CRS of the selected path chosen to restore Letdown, as the CRS, acknowledge the choice.

(Step 1) Check KC System The operator observes alignment:

Containment Pressure on OAC (or equivalent), and (Step 1.a) Containment determines that pressure HAS Containment Pressure has REMAINED BELOW 3 remained less than 3 psig.

PSIG.

(Step 1.b) All KC pumps The operator observes the ON.

both 1B1 and 1B2 KC Pump Green status lights are LIT, Red status lights are OFF, and recognizes that only the A Train KC Pumps are ON.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

(Step 1.b RNO 1) IF either train KC pumps off, THEN perform the following:

CLOSE from control room or dispatch operator to CLOSE the following valves on idle train:

ATrain:

1 KC-230A (Tm A Rx Bldg Non Ess Sup Isol) (aux bldg, 750+12, JJ-55, above north end of KC HX 1A).

1 KC-3A (Tm A Rx Bldg Non Ess Ret Isol) (aux bldg, 733+8, HH-55, north of column HH-55).

OR B Train:

1 KC-228B (Tm B Rx Bldg Non Ess Sup Isol) (aux bldg, 750+18, JJ-55, above middle of KC HX 1 B).

1KC-18B (Tm B Rx Bldg Non Ess Ret Isol) (aux bldg, 739+9, HH-56, north of KC Pump 1B1).

The operator observes that the B Train is the Idle Train.

The operator observes the 1 KC-228B Green status light is LIT, Red status light is OFF.

The operator observes the 1KC-18B Green status light is LIT, Red status light is OFF.

Appendix C Page 7 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT iO 2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT ii (Step 1.b RNO 2) WHEN idle train isolated from Reactor Bldg header per step above, THEN OPEN the following valves on operating train:

A Train:

1 KC-3A (Tm A Rx Bldg Non The operator observes the Ess Ret Isol).

1 KC-3A Red status light is LIT, Green status light is 1 KC-230A (Tm A Rx Bldg OFF.

Non Ess Sup Isol).

The operator observes the OR 1 KC-230A Red status light is LIT, Green status light is B Train:

OFF.

1 KC-1 88 (Tm B Rx Bldg Non Ess Ret Isol).

1 KC-228B (Tm B Rx Bldg Non Ess Sup Isol).

12 (Step 1.b RNO 3) Do not The operator reads the step continue until KC aligned to and continues.

Reactor Bldg header.

  • 13 (Step 1.c) OPEN 1 KC-305B The operator presses the (Ui KC To Excess L/D Hx OPEN pushbutton for 1 KC Cont Outside Isol).

305A, and observes the Red status light is LIT, Green status light is OFF.

The operator observes 1KCP 5630 and 5640 and determines that the KC Surge Tank levels are stable, and proceeds.

  • 15 (Step 1.e) OPEN 1 KC-31 58 The operator presses the (Ui Excess L/D Hx KC Ret OPEN pushbutton for 1 KC Hdr Cont Otsd Isol).

3i5A, and observes the Red status light is LIT, Green status light is OFF.

14 (Step 1.d) Check KC Surge Tank levels

- STABLE.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 9 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step I.f) Check The operator observes containment pressure

Containment Pressure on HAS REMAINED BELOW 3 OAC (or equivalent), and PSIG.

determines that Containment Pressure has remained less than 3 psig.

17 (Step 2) Pressurize excess letdown line as follows:

The operator observes the (Step 2.a) Place 1 NV-27B 1 NV-27B White VCT status (Ui Excess L/D Hx Outlet light is LIT.

3-Way Cntrl) to VCT position.

18 (Note prior to Step 2.b)

The operator reads the Opening and then closing Note and proceeds.

1NV-26B (Ui Excess L/D Hx Outlet Cntrl) in the next steps will reduce the possibility of water hammer by ensuring that the excess letdown line is filled with water.

19 (Step 2.b) OPEN 1 NV-26B The operator rotates the (Ui Excess L/D Hx Outlet adjust knob clockwise on Cntrl).

1NV-26B Manual Loader, and observes the controller output at 100%.

20 (Step 2.c) Wait 2 minutes.

The operator waits 2 minutes before continuing.

Cue:

Two minutes have elapsed.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 10 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 21 (Step 2.d) CLOSE 1 NV-26B The operator rotates the (Ui Excess L/D Hx Outlet adjust knob counter Cntrl).

clockwise on 1 NV-26B Manual Loader, and observes the controller output at 0%.

22 (Step 3) Check the following The operator observes the valves

- CLOSED:

1NV-94AC Red status light LIT, Green status light is 1NV-94AC (Ui NC Pumps OFF.

Seal Water Return Cont Inside Isol)

The operator observes the 1 NV-95B Red status light 1NV-95B (Ui NC Pumps LIT, Green status light is Seal Water Return Cont OFF.

Outside Isol).

The operator proceeds to Step 3 RNO.

23 (Step 3 RNO) IF both The operator proceeds to valves open, THEN GO TO Step 10.

Step 10.

24 (Step 10) Check reactor -

The operator observes that SUBCRITICAL.

the Shutdown Rods are fully withdrawn and the Control Rods are fully inserted; and determines that the reactor is subcritical.

  • 25 (Step 1 1) OPEN the The operator presses the following valves:

OPEN pushbutton for 1 NV 24B, and observes the Red 1NV-24B (10 NC Loop To status light is LIT, Green Excess L/D Hx Isol) status light is OFF.

1 NV-25B (1 C NC Loop To The operator presses the Excess L/D Hx Isol).

OPEN pushbutton for 1 NV 25B, and observes the Red status light is LIT, Green status light is OFF.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 1 1 of 14 Form ES-C-i PERFORMANCE INFORMATION ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 12) Slowly OPEN The operator rotates the 1 NV-26B (Ui Excess L/D adjust knob clockwise on Hx Outlet Cntrl) while 1 NV-26B Manual Loader, maintaining Excess letdown and observes the controller Hx temperature less than output at 100%.

200°F.

21 (Step 13) Check the following valves

- CLOSED:

The operator observes the lNl-185A (1A ND Pump 1NI-185A Green status light Suction From Cont Sump LIT, Red status light is OFF.

Isol)

The operator observes the 1 NI-i 84B (1 B ND Pump 1 NI-i 85A Green status light Suction From Cont Sump LIT, Red status light is OFF.

Isol).

28 (Step 14) Notify Chemistry The operator contacts that excess letdown is in Chemistry and notifies them seRice.

that Excess letdown is in service.

Cue:

Chemistry acknowledges.

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 12 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 29 (Step 15) WHEN time The operator contacts allows, THEN notify Engineering and notifies engineering to document them that Excess letdown is transients on letdown and in service.

charging.

I..I I4 I I II II I4 d..FU fl)VV IeJye.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 13 of 14 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No:

2014 Systems

- Control Room JPM E Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM E NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

With Unit 1 performing a reactor startup, the plant trips due to an electrical malfunction.

The crew is currently in EPI1IAI5000IES-O.1 (Reactor Trip Response).

INITIATING CUE:

The CRS has directed you to restore letdown in accordance with API1 1A15500115 (Loss of Vital or Aux Control Power), while the crew continues with ES-O.i.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM F 2014 Systems

- Control Room JPM F (Rev_050414)

NUREG 1021, Revision 9

Appendix C Page 2 of ii Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Emergency Borate the NCS JPM No.:

2014 Systems

- Control Room JPM F (Alternate Path)

K/A

Reference:

APE 024 AA2.04 (3.4/4.2)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout AP111A15500138 marked up through Step 11.

tb -hP plan-at we R-ha completed the procedure through Step 11.

The i B BA Transfer Pump is OCS.

Initiating Cue:

The CRS has directed you to initiate Emergency Boration starting with Step 12 of AP!1/A/5500/38 (Emergency Boration).

Task Standard:

The operator establishes Emergency Boration flow from the FWST.

Required Materials:

None 2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet General

References:

OP/1!A/6100/O1O C (Annunciator Response for Panel 1AD-2), Rev.

63 API1IA/5500138 (Emergency Boration), Rev. 11 OP/1!A/6100/O1O L (Annunciator Response for Panel 1AD-2), Rev.

76 Handouts:

AP111A15500138 (Emergency Boration), marked up through Step 11.

Time Critical Task:

NO Validation Time:

5 minutes 2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset to IC-39 (100% Steady-state) 2.

Place Simulator in Run and acknowledge Annunciator Alarms.

3.

Enter MALF-NCOO1

= 1010, ramped at 180 seconds, and allow Controls Rods to auto insert until MCB Annunciator 1AD-2, A9, has alarmed.

4.

Stabilize plant at < 100% power (NOTE; AFD is NOT within Spec).

5.

Insert the following:

LOA-NV044, BORIC ACID XFR PUMP lB RACKOUT (Control Switch in STOP) 6.

Place the 1A BA Transfer Pump Control Switch in AUTO with Pump OFF.

7.

Perform Steps 1-11 of AP/1/A/5500/38.

8. Acknowledge alarms and Freeze the Simulator.

OR 1.

Reset Simulator to Temporary Snap lC-249 (April, 2014) 2.

Place Red Tag Sticker on 1 B Boric Acid Transfer Pump.

3.

Momentarily place Simulator in Run for at LEAST 30 seconds to acknowledge alarms.

4.

Leave Simulator in FREEZE until operator is ready to begin.

NOTE: The Simulator Instructor will be required to insert a Malfunction immediately after JPM Step 5.

2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout AP111A15500138 marked up through Step 11.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQU IRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 12) Initiate The operator observes Red emergency boration as status light LIT, Green follows:

status light OFF for the 18 NV Pump.

(Step 12.a) Check iA or lB NV pump-AVAILABLE 2

(Step 12.b) Check any NV The operator observes Red pump-ON.

status light LIT, Green status light OFF for the 1 B NV Pump, and that amperage is at normal running amps.

3 (Step 12.c) Check the following boric acid system component AVAILABLE.

The operator observes Boric Acid Storage Tank 1 NVP-5740 and determines that 1 BAT level is 64%. (Or equivalent, i.e. observes the OAC)

Boric Acid Transfer pump.

The operator observes 1 NVP-6070 and determines that 2 BAT level is 62%.

(Or equivalent, i.e. observes the OAC)

The operator observes Green status light LIT, Red status light OFF for the 1A BA Transfer Pump.

2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION 4

(Step 12.d) OPEN 1NV-The operator presses the 265B (Boric Acid to NV OPEN pushbutton for 1 NV Pumps).

265B, and observes Red status light LIT, Green status light OFF.

5 (Step 12.e) Ensure a boric The operator rotates the acid transfer pump is Control Switch to START running.

forthe lABATransfer Pump, and observes Red status light LIT, Green status light OFF.

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor:

2 Seconds after the operator starts the IA BA Transfer Pump, Insert MAL-ELXA (IELXA De energizes causing a loss of the IA BA Transfer Pump [Via I EMXA])

NOTE: lAD-Il, A2 and A3 will alarm on the loss of IELXA. The operator will address these ARPS and dispatch an AO to locally investigate.

Cue:

If the operator announces these alarms to the CRS, as the CRS, state that another operator will address the ARPs 6

(Step 12.f) Check boration flow using one of the following methods:

The operator observes IF 1NV-265B is open, 1NVP-5440 (Or equivalent, THEN check i.e. OAC) observes 5 gpm, EMERGENCY BORATION and determines that FLOW ESTABLISHED.

Emergency Boration Flow is NOT established, and proceeds to RNO.

(ALTERNATE PATH) 2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 7 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7

(Step 12.f RNO) Perform The operator recognizes the following:

that the 18 BA Transfer Pump is OOS, and (Step i2J RNO 1) Start proceeds.

second boric acid transfer pump.

  • 8 (Step 12.f RNO 2) IF boration flow cannot be established, THEN align NV pump suction to FWST as follows:

(Step i2.f RNO 2.a) OPEN the following valves:

The operator observes that the 1 NV-221A status lights 1NV-221A (NV Pumps Suct are both OFF.

From FVVST)

The operator presses the OPEN pushbutton for 1 NV 222B, and observes Red 1NV-222B (NV Pumps Suct status light LIT, Green From FWST).

status light OFF.

E i ne opening OT 1Nv-Lb will satisfy the Critical nature of the steo 2014 Systems - Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 9 (Step i2.f RNO 2b) CLOSE The operator observes that the following valves:

the 1NV-i4iA status lights are both OFF.

1NV-141A (VCT Outlet Isol)

The operator presses the CLOSE pushbutton for 1NV-142B (VCT Outlet 1NV-i42B, and observes Isol).

Green status light LIT, Red status light OFF.

The opening of INV-142B will satisfy the Critical nfurn nf fh stan.

10 (Step i2.f RNO 2.c) GO TO The operator proceeds to Step 15 Step 15.

1 1 (Step 15) Align Normal Charging flowpath as follows:

(Step 1 5.a) Ensure one of the following NC loop isolation valves is OPEN:

1 NV-i 3B (NV Supply to A The operator observes the NC Loop lsol) 1NV-i3B Red status light LIT, Green status light OFF.

OR 1NV-16A (NV Supply to D NC Loop Isol).

2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 9 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 15.b) Check both of the following valves-OPEN:

1 NV-244A (Charging Line The operator observes the Cont Outside Isol)

NV Graphic on the OAC and determines that 1 NV 244A status lights are OFF.

1 NV-245B (Charging Line Cont Outside Isol).

The operator observes the 1 NV-245B Red status light LIT, Green status light OFF.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 10 of 11 Form ES-C1 VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM F Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM F NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

With the plant at power, a Reactor Makeup System failure has resulted automatic Control Rod insertion.

MCB Annunciator 1AD-2, A9, CONTROL ROD BANK LO LIMIT, has alarmed.

The crew has entered API1IAI5500I38 (Emergency Boration) and completed the procedure through Step ii.

The i B BA Transfer Pump is OOS.

INITIATING CUE:

The CRS has directed you to initiate Emergency Boration starting with Step 12 of AP/1/A!5500/38 (Emergency Boration).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM G 2014 Systems

- Control Room JPM G (Rev_061214)

NUREG 1021, Revision 9

Facility:

Task

Title:

McGuire Increase Pressure in Cold Leg Accumulator 1A Task No.:

JPM No.:

2014 Systems - Control Room JPM G K/A

Reference:

006 A1.13 (3.5/3.7)

Examinee:

Facility Evaluator:

Method of testing:

NRC Examiner:

Date:

Simulated Performance:

Classroom READ TO THE EXAMINEE Simulator Actual Performance:

X Plant x

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with nitiaI ConditionslCue (Last Page of this JPM).

Task Standard:

The operator will address the MCB Annunciator 1 AD-9, E-1, select.3 of OP/1/A!6200!009 to be performed, align N2 to CLA 1A and raise CLA 1A pressure to greater than 610 psig and less than 639 psig.

Required Materials:

None General

References:

OP/1/A16100/010 J (Annunciator Response Foe Panel 1AD-9), Rev 56 OP/1!A!6200/009 (Accumulator Operation), Rev 106 Appendix C Page 2 of 15 Form ES-C-i Job Performance Measure Worksheet 2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 3 of 15 Form ES-C-i Job Performance Measure Worksheet SOMP 01-07 (Control Room Oversight), Rev 1 AD-OP-ALL-i 000 (Conduct of Operations), Rev 1 McGuire Technical Specification LCO 3.5.1 (Accumulators), Amendment 218 Handouts:

None Time Critical Task:

NO Validation Time:

12 minutes 2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 4 of 15 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset the Simulator to IC-39 100% Power, MOL 2.

Open 1 Nl-50 and throttle open the manual loader for 1 Nl83 to bring CLA A down to the low pressure alarm setpoint (approximately 590 psig) 3.

Close 1 NI-50 and 1 Nl-83 4.

Freeze the Simulator OR 1.

Reset Simulator to Temporary Snap IC-250 (April, 2014) 2.

Momentarily place Simulator in Run to acknowledge alarms.

3.

Leave Simulator in FREEZE until operator is ready to begin.

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 5 of 15 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial ConditionslCue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQU IRED FOR UNSAT (ARP

- Immediate Actions)

The operator observes the Monitor for accumulator 1A CLA pressure on OAC pressure and level changes.

M1A0634, or 1NIP-5040/5050, to be 580 psig.

The operator observes the iA CLA level on the OAC or 1 NIL-5040/5050, to be normal.

2 (ARP Supplementary The operator informs the Actions 1) Investigate all CRS that the crew must leakage paths.

investigate all leak paths.

Cue:

As the CRS, indicate that the Work Control Center will h dirnw4Drl ft* rDrform 2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 6 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3

(ARP Supplementary The operator informs the Actions 2) Refer to Tech CRS that the Technical Specs.

Specifications must be evaluated.

Ac the CRS inrIirtp that I

I rqflIrI

  • .*E aaaresses i ecririicai Specifications, As the CRS, indicate that they will evaluate the Technical Specifications, and direct them to continue.

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

(ARP Supplementary Actions 3) Refer to OP/i /A16200/009 (Accumulator Operation) for adjusting accumulator pressure.

The operator informs the CRS that the crew must refer to OP/i 1A162001009.

failed when the operator first manipulates the MCB in an Enclosure other than 4.3 (i.e. if the operator corrects the incorrect selection of EnclosLirns nrior to u

I necessariiv taiieci.

(ARP Supplementary Actions 4) Check DCS Workstation alarms.

The operator observes the DCS Workstation alarms and report any recent alarm activity.

Appendix C Page 7 of i5 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 4 within UP!1IPJb2UUIUU9 is selected, the JPM will be 20i4 Systems

- Control Room JPM G NUREG iO2i, Revision 9

Appendix C Page 8 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6

(Step 2.1) GN System The operator calls the Work aligned per Control Center and asks if OPIO/B/6450/008 (Nitrogen the GN System aligned per System).

OPIO!B164501008.

Cue:

As the WCC Supervisor, state that the GN System is aligned per the procedure.

7 (Step 2.2) CLA Level within The operator informs the proper Tech Spec range.

CRS that the 1 CLA level must be within the Technical Specification Limit.

Cue:

As the CRS, state that the IA CLA must be between 6870 and 7342 gallons.

The operator observes the 1A CLA level on the OAC or 1 NIL-5040/5050, to be within this range.

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 9 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8

(Step 3.1) Evaluate all The operator calls the Work outstanding R&Rs that may Control Center and asks if impact the performance of the all outstanding R&Rs this procedure.

have been evaluated for the 1A CLA.

  • 9 (Step 3.2) Perform the The operator proceeds to Section 3.3.

following sections as applicable:

L..AaIIIIIIUI IIJL.

Section 3.3, Increasing If another Section within Accumulator Pressure.3 is selected, the JPM will be failed Section 3.4, Decreasing when the operator first Accumulator Pressure manipulates the MCB in a Section other than 3.3 (i.e.

Section 3.5, Adjusting if the operator corrects Accumulator Pressure via the incorrect selection of Equalization the appropriate Section prior to manipulation of the MCB, the JPM is NOT nppqcriIv fiIprfl 10 (NOTE prior to Step 3.3) IF The operator reads the CLAs have been completely NOTE, recognizes that it depressurized, CLA does NOT apply, and Nitrogen Heater is required.

proceeds.

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 10 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1 1 (Step 3.3) Increasing CLA pressure (Step 3.3.1) Ensure 1NI-83 The operator observes the (CL Accum N2 Hdr Atmos 1 N 1-83 controller output at Vent Isol) closed.

0%.

12 (Step 3.3.2) IF required, The operator recognizes start Unit 1 & 2 NI that the heaters are NOT Accumulator N2 HTR...

required (Per the Note prior to Step 3.3), and proceeds.

Cue:

If the operator addresses the issue to the CRS, as the CRS, state that the heater is NOT required.

  • 13 (Step 3.3.3) Open 1 NI-47A The operator presses the (Rx Bldg N2 Supply Isol) 1NI-47A OPEN pushbutton and observes the Red status light LIT, Green status light OFF.

The operator acknowledges Annunciator B-3 on the ESF Monitor Light Panel as an expected alarm.

14 (NOTEs prior to Step 3.3.4)

The operator reads the To maintain Tech Spec NOTEs and proceeds.

operability, only one CLA at a time can have associated liquid fill valve, gas fill valve, or sample valve open.

If LTOP in service, only A or B CLA can have associated liquid fill valve, gas fill valve, or sample valve open at a time.

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

(Step 3.3.4) IF increasing pressure in A CLA, perform the following:

(Step 3.3.4.1) Adjust 650 psig Nitrogen regulator at Bulk Nitrogen House to a Pressure adequate for makeup to A CLA:

1GN-38 (650 psig Nitrogen Hdr Press Reg)

OR 1GN-41 (650 psig Nitrogen Hdr Press Backup Reg)

(Step 3.3.4.2) Open 1NI-50 (A CL Accum N2 Supply Isol).

The operator contacts an AO, and directs that Nitrogen pressure be adjusted to 650 psig.

Cue:

The AO reports that IGN 38 has been adjusted so that Nitrogen pressure is 650 psig The operator presses the 1NI-50 OPEN pushbutton and observes the Red status light LIT, Green status light OFF.

Appendix C Page 11 of 15 Form ES-C-i PERFORMANCE INFORMATION

  • 15 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 12 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD 17 (Step 3.3.4.3) After CLA at The operator observes the desired pressure, back out 1A CLA pressure on OAC 650 psig Nitrogen Regulator M1A0634, or 1NIP-at Bulk Nitrogen House.

5040/5050, to be greater than 610 psig and lower 1 GN-38 (650 psig than 620 psig.

Nitrogen Hdr Press Reg)

The operator contacts the OR AC, and directs that 1GN-38 be backed out.

1GN-41 (650 psi 9

Nitrogen Hdr Press Backup Reg)

Cue:

Simulator Instructor:

REM-GNOO4O = 0 REM-GN0037 = 0 The AO reports that IGN 38 has been backed out.

  • 18 (Step 3.3.4.4) Close lNl-50 The operator presses the (A CL Accum N2 Supply 1 NI-SO CLOSE pushbutton Isol).

and observes the Green status light LIT, Red status light OFF.

19 (Step 3.3.5) If increasing The operator recognizes pressure in B CLA that the B CLA pressure is NOT being raised, and proceeds.

20 (Step 3.3.6) If increasing The operator recognizes pressure in C CLA that the C CLA pressure is NOT being raised, and proceeds.

S/U COMMENTS REQUIRED FOR UNSAT 2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 13 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2i (Step 3.3.7) If increasing The operator recognizes pressure in D CLA that the D CLA pressure is NOT being raised, and proceeds.

22 (Step 3.3.8) Close 1 Nl-47A The operator presses the (Rx Bldg N2 Supply Isol) 1NI-47A CLOSE pushbutton and observes the Green status light LIT, Red status light OFF.

The operator observes that Annunciator B-3 on the ESF Monitor Light Panel is DARK.

23 (Step 3.3.9) If required, turn The operator recognizes off Unit 1 & 2 NI Accum N2 that the step does NOT HTR apply, and proceeds.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 14 of 15 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems

- Control Room JPM G Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM G NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

The plant is at 100% power.

MCB Annunciator 1AD-9, E-1, A COLD LEG ACCUMULATOR ABNORMAL PRESS, has just alarmed.

INITATNG CUE:

Respond to MCB Annunciator 1AD-9, E-1, A COLD LEG ACCUMULATOR ABNORMAL PRESS, in accordance with the Annunciator Response Procedure.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM H 2014 Systems

- Control Room JPM H (Rev_050314)

NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

KC Pump Functional Verification JPM No.:

2014 Systems

- Control Room JPM H K/A

Reference:

008 Al.01 (2.8/2.9)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout 1.

Initial Conditions:

Unit 1 is at 100% power.

The 1A1 KC Pump was tagged out for an Oil Change.

The R&R has been cleared and the Breaker Racked In.

AC (Mike) is at the lAi KC Pump ready for pump testing, with a copy of the procedure in hand.

Initiating Cue:

The CRS has directed you to conduct a Functional Verification of the lAi KC Pump in accordance with Enclosure 4.5 (KC Pump Functional Verification (Bump Start)) of OP/1/A16400/005 (Component Cooling Water System)

Task Standard:

The operator will conduct a Functional Verification of the A Train KC Pumps in accordance with Enclosure 4.5, KC Pump Functional Verification (Bump Start), of OP/i /A/6400/005, Component Cooling Water System, using the iAi KC Pump.

Required Materials:

None 2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet General

References:

0P111A16400/005 (Component Cooling Water System), Rev 102 Handouts:.5 (KC Pump Functional Verification (Bump Start)) of 0P111A16400/005 (Component Cooling Water System) marked up as follows:

Step 2.1 initialed.

Step 3.1 Checkbox checked.

Step 3.2 Section 3.3 Checkbox checked.

Time Critical Task:

NO Validation Time:

8 minutes 2014 Systems - Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES 1.

Reset simulator to IC-39, 100% Power 2.

Place in RUN and allow time to stabilize 3.

Ensure B Train of equipment is in service.

4.

Freeze the Simulator OR 1.

Reset Simulator to Temporary Snap IC-251 (April, 2014).

2.

Momentarily place Simulator in Run to acknowledge alarms/Reset SLIMS.

3.

Leave Simulator in FREEZE until operator is ready to begin.

2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 3.3) A Train KC Pump Functional Verification (Step 3.3.i) IF RN NOT The operator observes RN available to supply 1A KC System and determines that Pump Motor Coolers AND sufficient RN System flow 1A KC HX exists to supply iA KC Pump Motors and HX.

2 (Note prior to Step 3.3.2)

The operator reads the Operation of 1 KC-1 49 (A Note and roceeds KF HX Outlet Flow) or 1 KC 156 (B KF HX Outlet Flow) to maintain KC to KF HX flow less than 500 gpm will result in erratic flow control.

  • 3 (Step 3.3.2) Adjust B Train The operator observes KC flow to 6000-7000 gpm 1 KCP-5540 at 5200 gpm.

by throttling one or more of the following:

The operator throttles one 1 KC-i 49 (A KF HX Outlet or more valves as Flow) necessary to achieve 6000-7000 gpm of B Train KC 1KC-156 (B KF HX Outlet flow.

Flow) 1 KC-56A (KC to A ND HX) 1 KC-81 B (KC to B ND HX) 2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 3.3.3) IF desired to operate 1A1 KC Pump for functional, perform the following:

(Step 3.3.3.1) Vent 1A1 KC Pump using 1KC-21 (1A1 KC Pump Overflow Isol).

FUIIIJ IId UII VIILU.

I I

(Step 3.3.3.2) Select Auto The operator rotates on 1KC-51A (Train A Recirc Control Switch clockwise to Isol).

AUTO on 1KC-51A.

(Step 3.3.3.3) Check 1 KC-The operator observes the 51A (Train A Recirc lsol) 1KC-51A Red status light LIT, and Green status light open.

OFF.

(Note prior to Step 3.3.3.4)

The operator reads the KC Pumps should operate Note, and proceeds.

at least 10 seconds.

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION 4

The operator directs AO to vent lAi KC Pump using 1 KC-21.

Ac?

ike) reports IAIKC 2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION The operator makes announcement concerning pump start.

The operator presses the 1A1 KC Pump START pushbutton.

The operator observes:

Red status light LIT for 1A1 KC Pump.

Motor amps increase.

1 KCP-5530 increases to 2500 gpm.

MOB Annunciator lAD-b, B-i, NCDT HX OUTLET HI FLOW, may momentarily alarm as an expected alarm on pumps start.

(Step 3.3.3.4) Start 1A1 KC Pump.

2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 9 (Step 3.3.3.5) AFTER 10 After 10 seconds of pump seconds elapsed AND run time, the operator running current has rotates 1 KC-51A Control stabilized, select CLOSE on Switch counter-clockwise to 1 KC-51A (Train A Recirc CLOSE position.

lsol).

  • 10 (Step 3.3.3.6) Stop 1A1 KC The operator depresses the Pump 1A1 KC Pump STOP pushbutton.

The operator observes:

Green status light LIT for 1A1 KC Pump.

Motor amps decrease to 0.

1 KCP-5530 decreases to 0 gpm.

(Step 3.3.3.7) Check NO The operator directs AO to reverse rotation of 1 Al KC check for reverse rotation of Pump.

pump.

AO (Mike) Reports that there is no reverse rotation on the IAI KC 12 (Step 3.3.4) IF desired to The operator recognizes operate 1A2 KC Pump for that it is NOT desired to functional operate 1A2 KC Pump, and proceeds.

2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 13 (Note prior to Step 3.3.5)

The operator reads the Operation of 1KC-149 (A Note, and proceeds.

KF HX Outlet Flow) or I KC 156 (B KF HX Outlet Flow) to maintain KCto KFHX flow less than 500 gpm will result in erratic flow control.

  • 14 (Step 3.3.5) Adjust B Train The operator throttles the KC flow as desired by valve previously throttled throttling one or more of the open in Step 3.3.2 as following:

necessary to achieve 5200 gpm of B Train KC 1 KC-1 49 (A KF HX Outlet flow (original flowrate) on Flow) 1 KCP5540.

1 KC-1 56 (B KF HX Outlet Flow) 1 KC-56A (KC to A ND HX) 1KC-81B(KCto B ND HX) 15 (Step 3.3.6) Check the following open:

1 KC-394A (1A NC Pump The operator observes Thermal Barrier Outlet Isol) valves and notes that Red 1KC-345A (lB NC Pump status light is LIT, and the Thermal Barrier Outlet Isol)

Green status light is OFF for each valve.

1KC-364B (1C NC Pump Thermal Barrier Outlet Isol) 1KC-413B (1D NC Pump Thermal Barrier Outlet Isol) 2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT i6 (Step 3.3.7) If it is desired to The operator places an NA stop 1A RN Pump in this step.

Terminating Cue:

Evaluation on this JPM is complete.

STOP TIME:

2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 1 1 of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No:

2014 Systems

- Control Room JPM H Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems

- Control Room JPM H NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Unit i is at 100% power.

The iAi KC Pump was tagged out for an Oil Change.

The R&R has been cleared and the Breaker Racked In.

AO (Mike) is at the iAi KC Pump ready for pump testing, with a copy of the procedure in hand.

INITIATING CUE:

The CRS has directed you to conduct a Functional Verification of the lAi KC Pump in accordance with Enclosure 4.5 (KC Pump Functional Verification (Bump Start)) of OP/i/A16400/005 (Component Cooling Water System).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM I 2014 Systems In-Plant JPM I (Rev_050714)

NUREG 1021, Revision 9

Appendix C Page 2 of 14 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Shift Seal Injection Filters JPM No.:

2014 Systems In-Plant JPM I

K/A

Reference:

003 A2.02 (3.7/3.9)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testinc:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout 1.

I._:4_.I I Ir+ I rrrfnti + lflflO/,. r,r11A,r

I SI I II_4%J IJL,1/4.,I I

II IISJI I

I I..#SA LI ILAL tAI I I IJLISJI I

I IlLSI I I..?

VV III IJS.,

JIt.4.L#.A II I

service.

All initial conditions have been verified and R & Rs have been evaluated.

Initiating Cue:

The CR5 directs you to place lB seal injection filter in service and remove the 1A seal injection filter from service by performing OP/iIAJ6200/OOiC (Chemical And Volume Control System Filters).2 (Shifting Seal Water Injection Filters and Assisting Maintenance in Change Out), Section 3.6.

Task Standard:

The operator will shift Seal Injection Filters from 1A to 1 B in accordance with Section 3.6 of Enclosure 4.2 of OP/1/A16200/OO1 C.

20i4 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 3 of 14 Form ES-C-i Job Performance Measure Worksheet Required Materials:

PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

OPIiIAJ6iOOIOlO H (Annunciator Response for Panel 1AD-7), Rev 64 OP/i/AJ6200/OOi C (Chemical and Volume Control System Filters), Rev 32 Handouts:

Handout 1: Enclosure 4.2 (Shifting Seal Injection Filters and Assisting in Maintenance Change out) of OP/i/A/6200/001 C (Chemical and Volume Control System Filters); marked up through Step 3.5 to select the performance of Section 3.6.

Time Critical Task:

NO Validation Time:

16 minutes 2014 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 4 of 14 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1

(Caution prior to Step 3.6.1)

The operator reads the Placing Seal Water Injection Caution and proceeds.

Filter in service could result in a Boron dilution of the NC System. R.M.

2 (Step 3.6.1) Notify The operator recognizes that Radwaste Chemistry of Radwaste has been notified input to WEFT and to (Initial Conditions), and monitor tank levels while proceeds.

draining.

3 (Step 3.6.2) Notify Shift RP The operator recognizes that that 1 B Seal Water Injection RP has been notified (Initial Filter will be placed in Conditions), and proceeds.

service and to monitor for changing dose rates in affected areas. {SOER 01 01 Recommendation}.

4 (Step 3.6.3) Ensure closed The operator attempts to 1 NV-307 (1 B Seal Water rotate the 1 NV-307 Injection Filter Drn lsol).

Handwheel in the clockwise direction, and recognizes that the Handwheel will not rotate.

Cue When Handwheel is rotated rlockwise, Handwheel will NOT move 2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS FOR UNSAT

  • 5 (Step 3.6.4) Open:

For each of the following:

1NV-306 (lB Seal 1NV-306 Water Injection Filter NV.309 Overflow & Vent Isol)

NV.304 1 NV-309 (Unit 1 Seal Water Injection Filter The operator rotates the Drain To WEFT Isol)

Handwheel in the counter clockwise direction until the 1 NV-304 (1 B Seal Handwheel stops rotating.

Water Injection Filter Flush Supply Isol)

Cue:

When Handwheel is rotated counter-clockwise, Handwheel rotates, and then stops (After full travel).

  • 6 (Step 3.6.5) Throttle open The operator rotates the 1 NV-303 (Unit 1 Seal Water 1 NV-303 Handwheel in the Injection Filter Flush Supply counter-clockwise direction.

Isol) until one of the following met:

Cue:

Water observed in overflow When Handwheel is rotated sight glass (1NVFG611O) counter-clockwise, water is (733+6, JJ53 Wall) observed in sight glass.

OR The operator stops valve manipulation.

WEFT level trend (M2A0574) increasing 2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 7 (Step 3.6.6) HOLD until For each of the following:

water observed in overflow sight glass OR WEFT level 1 NV309 trend increasing, THEN 1NV306 close 1 NV303 1NV-304 1 NV-309 (Unit 1 Seal The operator rotates the Water Injection Filter Handwheel in the clockwise Drain To WEFT Isol) direction until the Handwheel 1 NV-306 (1 B Seal stops rotating.

Water Injection Filter Overflow & Vent Isol)

Cue:

1 NV-303 (Unit 1 Seal Water Injection Filter When Handwheel is rotated Flush Supply Isol) clockwise, Handwheel 1 NV-304 (1 B Seal rotates, and then stops Water Injection Filter (After full travel).

Flush Supply Isol) 8 (Step 3.6.7) Establish and The operator establishes maintain constant communication with the Unit communication between 1 BOP.

Control Room and operators in the field while Cue:

operating Seal Water Injection Filter isolation Acknowledge as the BOP.

valves.

2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 7 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS 9

ELEMENTS (Step 3.6.8) Notify Control Room of the following:

Monitor VCT level while shifting/draining Seal Water Injection filters Continuously monitor NCP seal flows Place WEFT level (M2A0574) on trend and monitor to verify proper filter isolation (potential leakby to WEFT). {PIP M-1 1 -6538}

STANDARD The operator contacts the Control room and makes the notifications.

Cue:

Acknowledge as the BOP.

S/U COMMENTS REQUIRED FOR UNSAT 10 (Note prior to Step 3.6.9)

The operator reads the Note Due to the potential for and proceeds.

moving foreign material to NC Pumps, the following steps will slowly and alternately throttle the inlet valves until both fully opened. {PIP M-09-0950}

  • 1 1 (Step 3.6.9) Perform the The operator rotates the following:

1NV-491 Handwheel in the counter-clockwise direction (Step 3.6.9.1) Slowly 900.

throttle 1 NV-491 (1 B Seal Water Injection Filter Inlet Isol) 1/4 of a turn open OR ue:

enough to initially break andwheel is rotated valve off seat.

unter-clockwise 900.

2014 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 12 (Step 3.69.2) Slowly The operator rotates the throttle 1NV-246 (lB Seal 1NV-246 Handwheel in the Water Injection Filter Inlet counter-clockwise direction lsol) 1/8 of a turn open.

45°.

Cue:

Handwheel is rotated counter-clockwise 45°.

13 (Step 3.6.9.3) WHEN either The operator reads the step, valve in Step 3.6.9.1 or and proceeds.

3.6.9.2 reaches full open, slowly open other valve until full open.

2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 9 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 14 (Step 3.6.9.4) Repeat Steps The operator rotates the 3.6.9.1 and 3.6.9.2 until 1NV-491 Handwheel in the both valves full open.

counter-clockwise direction, and/or rotates the 1 NV-246 Handwheel in the counter clockwise direction.

Cue:

When Handwheel is rotated counter-clockwise, Handwheel rotates, and then stops (After full travel).

The operator rotates the 1 NV-49i Handwheel in the counter-clockwise direction, and/or rotates the 1 NV-246 Handwheel in the counter clockwise direction.

Cue:

When Handwheel is rotated counter-clockwise, Handwheel rotates, and then stops (After full travel).

15 (Step 3.6.10) IF directed to The operator recognizes that this step after 1 B Seal this Step does NOT apply, Water Injection Filter has and proceeds.

been filled, vented, and checked for leaks by Maintenance (Step 3.9.13.11) 2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 10 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 16 (Step 3.6.1 1) Slowly open The operator rotates the 1NV-492 (lB Seal Water 1NV-492 Handwheel in the Injection Filter Outlet Isol).

counter-clockwise direction.

Cue:

When Handwheel is rotated counter-clockwise, Handwheel rotates, and then stops (After full travel).

  • 17 (Step 3.6.12) Establish flow The operator reads the Note through Seal Water and proceeds.

Injection Filter lB as follows:

(Note prior to Step 3.6.12.1) IF all NC Pump seal cooling is lost, seal injection should remain isolated if NC Pump Lower Bearing or Seal Outlet temperatures have exceeded their operating limits. {ERG DW 94-1 1}

18 (Step 3.6.12.1) IF all NC The operator recognizes that Pump cooling has been lost this Step does NOT apply, (thermal barrier and seal and proceeds.

injection) 2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page ii of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 19 (Step 3.6.12.2) IF NC Pump The operator contacts the Ui Seal Injection is less than 6 BOP and requests Seal gpm per pump Injection flow rate to each NCP.

Cue:

As the UI BOP report that the Seal Injection flow to each NCP is 8 gpm.

20 (Note prior to Step 3.6.12.3)

If operator observes D/P As 1 B Seal Water Injection gauges.

Filter flowpath is established, a noted drop in DP should occur on iA Seal Cue:

Water Injection Filter IA Filter DP is 41 PSID.

lB Filter DP is I PSID.

{PIP M-13-i0088}

21 (Step 3.6.12.3) IF NC Pump The operator slowly rotates seal injection flow is greater the 1 NV-247 Handwheel in than 6 gpm per pump, the counter-clockwise slowly open 1NV247 (lB direction.

Seal Water Injection Filter Outlet Isol).

I Handwheel rotates, and I then stops (After full I travel).

22 (Note prior to Step 3.6.12.4)

The operator reads the Note Seal Injection filter may and proceeds.

NOT indicate zXP when both Seal Injection filters are in service.

2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 12 of 14 Form ES-C-i PERFORMANCE INFORMATION 23 (Step 3.6.12.4) Check flow The operator observes indicated through 1 B Seal 1 NVPG564O.

Water Injection Filter via presence of DP on Cue:

1 NVPG564O.

OR Filter DP is 5 PSID.

(Step 3.6.12.4) Monitor lB The operator reads the Step Seal Injection FilterP as and proceeds.

1A Seal Injection Filter is removed from service.

Cue:

Another operator will continue with this procedure.

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Terminating Cue:

STOP TIME:

Evaluation on this JPM is complete.

2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Page 13 of 14 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems In-Plant JPM I

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems In-Plant JPM I

NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Unit 1 is operating at 100% power.

MCB Annunciator 1AD-7, NC PUMP SEAL INJ LO FLOW, has just alarmed.

It is planned to shift Seal Injection Filters.

Radwaste has already been informed they will receive waste input.

RP has been informed that Seal Injection Filter 1 B will be placed in service.

All initial conditions have been verified and R & Rs have been evaluated.

INITIATING CUE:

The CRS directs you to place 1 B seal injection filter in service and remove the 1A seal injection filter from service by performing OP/1/A16200!OO1C (Chemical And Volume Control System Filters).2 (Shifting Seal Water Injection Filters and Assisting Maintenance in Change Out), Section 3.6.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-PIant JPM J 2014 Systems In-Plant JPM J (Rev_061214)

NUREG 1021, Revision 9

Appendix C Page 2 of 15 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Start up the Unit 1A Motor JPM No.:

2014 Systems In-Generator Set Plant JPM J K/A

Reference:

001 A2.i0(3.413.9)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout 1.

Initial Conditions.

A Unit 1 startup is in progress with the plant in Mode 3.

AB requirements for entering Mode 2 have been met The lB Rod Control M/G Set is running Required Materials:

General

References:

The operator will start the 1A M/G Set per Section 3.3 of Enclosure 4.1 of OP/i/A16150/008.

PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

0P111A16150/008 (Rod Control), Rev 80 Task Standard:

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 3 of 15 Form ES-C-i Job Performance Measure Worksheet Handouts:

Handout 1: Enclosure 4.1 (MIG Startup) of OP!1/A161 50/008 (Rod Control), marked up so that steps 3.1 and 3.2 are complete.

Time Critical Task:

NO Validation Time:

15 minutes 2014 Systems In-Plant JPM J NUREG 1021, Revision 9

(Note prior to Step 3.3.2) 0P111A162501003 A (Restoring Slave Relays to Normal) requires closing and opening RTBs. MG sets may be running as long as Generator Circuit Breaker Control remains open and will NOT be closed during restoration of Slave Relays.

(Step 3.3.2) IF in Mode 5

The operator reads the Note and proceeds.

The operator recognizes that the plant is in Mode 3 (Initial Conditions), and that this Step does NOT apply.

Appendix C Page 4 of 15 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk9 Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1

(Note prior to Step 3.3.1)

The operator reads the Note Steps 3.3.1

- 3.3.5 may be and proceeds.

performed concurrently.

2 (Step 3.3.1) IF lB MG Set The operator recognizes that is NOT running the lB M/G set is operating (Initial Conditions), and that this Step does NOT apply.

3 2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 5 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 5

(Step 3.3.3) Perform the The operator observes the following:

1A MIG Set Generator (Step 3.3.3.1) Ensure tag Breaker Control Switch.

removed from Circuit Breaker Control on Cue:

Generator for Generator No. i.

There are no tags present.

6 (Step 3.3.3.2) Ensure the The operator observes the following open:

IA M/G Set Motor Breaker Control Switch.

Circuit Breaker Control on Motor for Generator No. 1 Cue:

Circuit Breaker Control Green status light is LIT.

on Generator for Generator No. 1 The operator observes the 1A M/G Set Generator Breaker Control Switch.

Cue:

Green status light is LIT.

7 (Step 3.3.3.3) Ensure 1 LXF-The operator recognizes that O1A (Control Rod Drive MG another operator has verified Set No. 1A) racked to that Breaker 1LXF-O1A is CONNECT per racked in to the CONNECT OP/01A16350/008 position (Initial Cue) and (Operation of Station proceeds.

Breakers).

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 6 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8

(Step 3.3.4) IF 1A MG Set The operator contacts to be started for maintenance maintenance, notify Maintenance that 1A MG Cue:

Set will be started.

Bobby Smith of Maintenance has been notified at current time and date.

(Step 3.3.5) IF startingiA The operator recognizes that MG Set with 1 B MG set the i B M/G set is operating NOT running (Initial Conditions), and that this Step does NOT apply.

Examiner Note: DO NOT allow operator to open I KS panel. A picture of the panel internals is provided on Page 14 of this JPM. Have the operator proceed to the panel, and then provide the picture as a reference. The picture shows the switch in the OPEN position.

10 (Note prior to Step 3.3.6)

The operator reads the Note 1KS is located inside and proceeds.

Generator No. 2 panel, 4 ft from floor (access from top front panel).

i i (Step 3.3.6) Check open The operator observes the 1KS (3 pole grounding 1KS Switch (Picture).

switch).

Cue:

The I KS Switch is in the position as shown in the picture.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 7 of 15 Form ES-C-i PERFORMANCE INFORMA11ON STEPS ELEMENTS STANDARD S/U COMMENTS REQU IRED FOR UNSAT 12 (Step 3.3.7) Push in to The operator pushes the iA release from Pull Out MIG Set Generator Control position Circuit Breaker Switch inward.

Control on Generator for Generator No. 1.

Cue:

The Control Switch is released from the PULL OUT position.

13 (Step 3.3.8) Push in to The operator pushes the 1A release from Pull Lamp Cut M/G Set Motor Control Switch Out position Circuit inward.

Breaker Control on Motor for Generator No. 1.

Cue:

The Control Switch is released from the PULL LAMP CUT OUT position.

14 (Step 3.3.9) Place The operator observes the Generator No. 1 Voltage iA M/G Set Voltage Adjust Adjust potentiometer in 12 Potentiometer.

oclock position.

ue:

he potentiometer is set at e 12 oclock position.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 8 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 15 (Step 3.3.10) Ensure The operator observes the Synchronize switch OFF.

Synchronize Switch position.

Cue:

The Synchronize Switch in the OFF position.

  • 16 (Step 3.3.11)Close Motor The operator places the iA Circuit Breaker Control on M1G Set Motor Control Switch Generator No. 1.

to the ON position.

Cue:

The Switch is rotated to the closed position, the red light is lit and the sound of the motor increasing in speed is heard.

17 (Step 3.3.12) Allow 15 The operator waits 15 seconds to obtain full rated seconds.

speed.

Cue:

The sound of the motor speed is steady.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 9 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 18 (Step 3.3.13) Depress and The operator depresses and HOLD Gen Field Flash 1

holds the GEN FIELD FLASH pushbutton.

pushbutton.

Cue:

Generator Line Volts indication starts to rise.

  • 19 (Step 3.3.14) AFTER The operator observes Generator Line Volts Generator Line Volts meter.

stops rising (230

- 260 volts), release Gen Field Cue:

Flash pushbutton.

Generator Line Volts is stable at 245 volts.

The operator releases the GEN FIELD FLASH pushbutton.

20 (Note prior to Step 3.3.15)

The operator reads the Note The intent of the following and proceeds.

step is to check for dead spots on the voltage adjust potentiometer. An erratic voltage output (voltage jump high or low) is an unexpected response.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 10 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 21 (Step 3.3.15) Cycle The operator rotates the Voltage Adjust Voltage Adjust Potentiometer potentiometer from 250 clockwise.

VAC to 270 VAC (to verify no erratic voltage Cue:

response).

Generator Line Volts is stable at 270 volts and stable.

22 (Step 3.3.16) IF erratic The operator recognizes that voltage output observed the Generator Line Voltage is NOT erratic, and that this Step does NOT apply.

  • 23 (Step 3.3.17) Obtain 260 The operator rotates the volts on Generator Line Voltage Adjust Potentiometer Volts by rotating the M/G counter-clockwise.

Set Voltage Adjust potentiometer.

Cue:

Generator Line Volts is stable at 260 volts and stable.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page ii of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Examiner Note: DO NOT allow operator to open RTB Breaker Cubicle Doors during this JPM.

24 (Step 3.3.18) IF desired to The operator performs one of close Generator No. 1 the following:

Generator Circuit Breaker Control for equipment Opens (Simulates) the RTB check out, perform the Breaker Doors and observes following:

status flags.

(Step 3.3.18.1) Check OR Reactor Trip Breakers Calls the Control Room and open.

requests the status of the Reactor Trip Breakers.

Cue:

If the RTB status flags are observed locally, state Cabinet doors are opened, status flags for both breakers are Green.

If the operator calls the Control Room, report that the Unit I OATC indicates that both Unit I RTBs are OPEN.

25 (Step 3.3.18.2) Ensure The operator recognizes that MG1A (iA Control Rod another operator has verified Drive MG Set Bkr) racked to that Breaker 1 LXF-O1A is CONNECT per racked in to the CONNECT OP/O/A16350/008 position (Initial Cue) and (Operation of Station proceeds.

Breakers).

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

(Step 3.3.18.3) Close Generator No. 1 Generator Circuit Breaker Control.

The operator places the 1A M/G Set Generator Control Switch to the ON position.

Switch is rotated to the ed position, Red status is LIT.

(Step 3.3.18.4) HOLD until equipment checkout complete, THEN trip Generator No. 1 Generator Circuit Breaker Control.

The operator reports that the 1 A M/G Set is ready for Maintenance.

Terminating Cue:

STOP TIME:

Evaluation on this JPM is complete.

Appendix C Page 12 of 15 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 26 27

)ther Operator will work 1 Maintenance to iplete the Enclosure.

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 13 of 15 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems In-Plant JPM J Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 14 of 15 Form ES-C-i VERIFICATION OF COMPLETION 2014 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

A Unit 1 startup is in progress with the plant in Mode 3.

All requirements for entering Mode 2 have been met.

The 1 B Rod Control M!G Set is running.

INITIATING CUE:

The CRS directs you to start the iA MIG Set per OPIiIAI6i5OIOO8 (Rod Control) Enclosure 4.1 (M/G Startup) for post maintenance inspection.

Another operator has verified that Breaker 1LXF-OiA, Control Rod Drive Set No.iA, is racked in to the CONNECT position.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM K 2014 Systems n-PIant JPM K (Rev_061 314)

NUREG 1021, Revision 9

Appendix C Page 2 of 1 1 Form ES-C-i Job Performance Measure Worksheet Facility:

McGuire Task No.:

Task

Title:

Ensure Proper Response of Diesel JPM No.:

2014 Systems In-VI Compressors on Loss of VI Plant JPM K K/A

Reference:

APE 065 AA1.04 (3.5/3.4)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionslCue (Last Page of this JPM), and when candidate locates procedure located on column 2B32, Unit 2 TB, near exit door leading to Diesel VI compressors, provide a copy of Handout 1.

a. C..

S

.-..d

.e.. a C..e e

,j

VI (.ompressor Uperatlon) ot AI1INbbUU/22 Use the copy of the procedure located on column 2B32, Unit 2 TB, near exit door leading to Diesel VI compressors.

Task Standard:

The operator will start the G VI compressor per Enclosure 4 (Diesel VI Compressor Operation) of AP/i /A15500/22.

Required Materials:

PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Page 3 of 1 Job Performance Measure Worksheet AP/1/A15500/22 (Loss of VI), Rev 33 Handout 1: Enclosure 4 (Diesel VI Compressor Operation) of AP/1/A15500/22 (Loss of VI)

Appendix C 1

Form ES-C-i General

References:

Handouts:

Time Critical Task:

Validation Time:

NO 7 minutes 2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and when candidate locates procedure located on column 2B32, Unit 2 TB, near exit door leading to Diesel VI compressors, provide a copy of Handout 1.

START TIME:

Cue:

Upon arriving at the scene, the following conditions exist:

H VI Compressor is running.

G VI Compressor is fiQI running.

Cue:

As operator checks each switch:

AutolOff-Reset selector switch is in AUTO HIGHILOW selector switch is in HIGH.

STARTIWARM UPIRUN switch is in RUN.

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 1) On running compressors, ensure associated compressor switches are in the following positions:

The operator observes Auto/Off-Reset the switches for H VI selector switch in AUTO.

Compressor.

HIGH/LOW selector switch, in HIGH.

START/WARM UP/RUN selector switch in RUN.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Cue:

AutolOff-Reset rotary switch moved to OFF-RESET.

Appendix C Page 5 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2

(Note prior to Step 2)

The operator reads the Several G and H VI Note and proceeds.

Compressor gauges will not function until the associated ENGINE SWITCH is placed in the ON position in the following steps.

  • 3 (Step 2) IF G VI The operator places the Compressor is off, THEN Auto/Off-Reset selector perform the following:

switch in OFF-RESET.

(AS FOUND = AUTO)

(Step 2.a) Place the Auto/Off-Reset selector switch in OFF-RESET.

(Step 2.b) Ensure the The operator ensures the H IGH/LOW selector HI GH/LOW selector switch, is in HIGH.

switch, is in HIGH.

(AS FOUND = HIGH)

(Step 2.c) Ensure the The operator ensures the START/WARM-U P/RUN START/WARM-UP/RUN selector switch is in RUN.

selector switch is in RUN.

(AS FOUND = RUN)

Cue:

HIGHILOW selector switch is in HIGH.

Cue:

STARTIWARM-UPIRUN switch is in RUN.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Cue:

ENGINE SWITCH rotated clockwise to ON 15 seconds have elapsed and the engine is NOT running.

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6

(Note prior to Step 2.d)

The operator reads the Engine will start after a 5 to Note and proceeds.

10 second time delay in next step.

(Step 2.d) Place ENGINE The operator places the SWITCH in ON.

ENGINE SWITCH in ON.

  • 8 (Step 2.e) IF Diesel The operator places the compressor fails to start EGLNE SWITCH in within approximately 15 OFF.

seconds, THEN perform the following:

(Step 2.e.1)) Place Engine switch in OFF.

Cue:

Engine switch rotated counterclockwise to OFF.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Examiner Note: Allow the next two steps to be read before giving the 2 minutes have elapsed cue.

Cue:

Two minutes have elapsed.

Appendix C Page 7 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 2.e.2)) Do not attempt The operator waits 2 to start G VI compressor minutes.

until 2 minutes have elapsed.

io (Step 2.e.3)) IF H VI The operator proceeds to compressor is off, THEN Step 3.

start H VI compressor PER step 3 while waiting to start G VI compressor.

The operator returns to Step 2.e.4.

i i (Step 2.e.4)) WHEN 2 The operator will proceed to minutes have elapsed, step 2.d.

THEN observe note prior to Step 2.d and RETURN TO Step 2.d.

Cue:

H VI Compressor is running.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 12 (Step 2.d) Place ENGINE The operator reads the SWITCH in ON.

Note prior to Step 12.d and proceeds.

The operator places the ENGINE SWITCH in ON.

13 (Step 3) IF H VI compressor The operator checks the is off, THEN perform the status of the H VI following...

Compressor.

The operator determines that the H VI Compressor is running and proceeds to step 4.

Appendix C Page 8 of 11 Form ES-C-i PERFORMANCE INFORMATION Cue:

The H VI Compressor is running.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 9 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 14 (Step 4) WHEN time allows, The operator proceeds to THEN check running.12.

parameters PER OPIO/A164501005 (Instrument Air system),.i2 (Response to Auto/Emergency Start of G and/or H VI Compressor).

Cue:

Another operator will check the running parameters when time allows.

Terminating Cue:

STOP TIME:

Evaluation on this JPM is complete.

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 10 of 1 1 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.:

2014 Systems In-Plant JPM K Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result:

SAT UNSAT Examiners Signature:

Date:

2014 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Units 1 and 2 are at 100% power when a leak develops in the VI system.

APIiIAI5500I22, Loss of VI, has been implemented up to step 4.c.

VI header pressure is 75 PSIG and going down.

INITIATING CUE:

Ensure Diesel VI compressors are running per Enclosure 4 (Diesel VI Compressor Operation) of AP111A15500122.

Use the copy of the procedure located on column 2B32, Unit 2 TB, near exit door leading to Diesel VI compressors.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9