Amends 141,141 & 138 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Tech Spec to Allow one-time Extension of Allowable Period of Inoperability from 24 H to 10 Days Per Battery to Install Batteries & Battery Racks
ML15113A172
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/17/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duke Power Co
Shared Package
ML15113A173 List:
References
DPR-38-A-141, DPR-47-A-141, DPR-55-A-138 NUDOCS 8507310230
Download: ML15113A172 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 141 License No. DPR-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated March 19, 1985, as supplemented on May 1, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safetyof the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-38 is hereby amended to read as follows:

3.8 Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No.141 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-8507310230 850717 PDR ADOCK 05000269 P

PDR

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULA ORY COMMISSION o

.Stolz, Chief rating Reactors Branch #4 ivision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: July 17, 1985

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 141 License No. DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated March 19, 1985, as supplemented on May 1, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-47 is hereby amended to read as follows:

3.8 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.141 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION oh F. Stolz, Chief Op rating Reactors Branch W4 vision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: July 17, 1985

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 138 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated March 19, 1985, as supplemented on May 1, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-55 is hereby amended to read as follows:

3.8 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.138 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATPRY COMMISSION J

n. Stolz, Chief 0

ating Reactors Branch #4 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 17, 1985

ATTACHMENTS TO LICENSE AMENDMENTS AMENDMENT NO. 141 TO DPR-38 AMENDMENT NO. 141 TO DPR-47 AMENDMENT NO. 138 TO DPR-55 DOCKETS NOS. 50-269, 50-270 AND 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment numbers and contain vertical lines indicating the area of change.

Remove Pages Insert Pages 3.7-3 3.7-3 3.7-4 3.7-4

The circuits or channels of more than one functional unit of the EPSL may be inoperable only if:

1.

The inoperability results from a loss of power due to the in operability of a 125 VDC instrumentation and control panelboard (see 3.7.2(e) below); and

2.

The conditions of Table 3.7-1 for degraded operation are satisifed for the affected functional units.

If any event, if the reactor is subcritical, the inoperable circuit(s) or channel(s) shall be restored to operability and the conditions of Table 3.7-1 for normal operation shall be satisifed for all functional units before the reactor is returned to criticality.

(c) One 4160 volt main feeder bus may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(d) One complete single string (i.e., 4160 volt switchgear (TC. TD, or TE),

600 volt load center, (X8, X9, or X10), 600-208 volt tICC (XS1, XS2, or XS3),

and their loads) of each unit's 4160 volt Engineered Safety Features Power System may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(e) One or more of the following DC distribution components may be in operable for periods not exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (except as noted in 3.7.2(f) below):

1.

One complete single string or single component (i.e., 125VDC battery, charger, distribution center, and panelboards) of the 125VDC 230KV Switching Station Power System.

  • 2.

One complete single string or single component (i.e., 125VDC battery, charger, and distribution center) of the Keowee 125VDC Power System may be inoperable provided the remaining string of Keowee is operable and electrically connected to an operable Keowee hydro unit.

3.

One complete single string or single component (i.e., 125VDC battery, charger, distribution center, and associated isolating and transfer diodes) of any units 125VDC Instrumentation and Control Power System. Only one battery more than the number allowed to be inoperable per 3.7.1 (f) for the Station may be removed from service under this paragraph.

4.

One 125 VDC instrumentation and control panelboard and its associated loads, per unit, provided that no additional AC buses are made inoperable beyond the provisions of 3.7.2(a), (c), and (d), and provided that the conditions of Table 3.7-1 for normal operation are satisfied for all functional units of the EPSL before the 125 VDC instrumentation and control panelboard becomes inoperable. Additionally, the provisions of 3.7.2.(h) must be observed for the 120 VAC vital instrumentation power panelboard which is powered by the affected 125 VDC panelboard.

(f) For periods not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each unit's 125 VDC system may be separated from its backup unit via the isolating and transfer diodes.

  • A one-time extension of inoperability for a period of 10 days per battery is

.granted to allow for installation of new Keowee batteries and battery racks.

-3.7-3

(g) One battery each, from one or more of the following 125VDC systems may be simultaneously inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in order to perform an equalizer charge after the surveillance requirements of Specification 4.6.10.

1.

230 KV Switching Station 125VDC Power System

2.

Keowee Hydro Station 125VDC Power System

3.

Each unit's 125VDC Instrumentation and Control Power System, provided that the unit's remaining battery is operable. However, for operation of I or 2 units, no more batteries than those allowed to be inoperable per 3.7.1 (f) may be removed from service. For operation of 3 units, at least 4 or the 6 station IAC.batteries shall be operable.

(h) One 120 VAC vital instrumentation power panelboard per unit and/or its associated static inverter may be inoperable for periods as specified below:

Maximum Allowed Period Panelboard of Inoperability KVIA 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> KVIB 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> KVIC 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> KVID 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A single vital bus static inverter per unit may continue to be inoperable beyond the specified period, but no longer than 7 days total, provided that its associated 120 VAC vital instrumentation power panelboard is connected to the 240/120 VAC Regulated Power System and verified to be operable once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(i) 1.

A startup transformer may be inoperable for periods not exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for test or maintenance, provided the underground feeder path, through transformer CT4; and to one 4160V standby bus is verified operable within one hour of loss and every eight hours thereafter. The remaining operable startup transformers can be shared between units within the same 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the above startup transformer being determined inoperable. Prior to exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, they shall be aligned and connected such that each one is providing a path for power to one and only one unit.

2.

In the event that a startup transformer becomes inoperable for unplanned reasons, then one unit shall be in cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with its loads powered from the standby buses. The remaining operable startup transformers can be shared between units within the same 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the above startup transformer being determined inoperable. Prior to exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, they shall be aligned and connected such that each one is providing a path for power to one and only one unit.

3.7-4