ML15113A080

From kanterella
Jump to navigation Jump to search
Amends 126,126 & 123 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Tech Specs to Correct Values for Axial Power Shaping Rod Position Limits After 385 EFPD for Unit 3, Cycle 7 Operation
ML15113A080
Person / Time
Site: Oconee  
Issue date: 01/30/1984
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duke Power Co
Shared Package
ML15113A081 List:
References
DPR-38-A-126, DPR-47-A-126, DPR-55-A-123 NUDOCS 8402150452
Download: ML15113A080 (9)


Text

V UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTGN, D. C. ?0555 DUKE POWER COMPANY DOCKET NO.

50- 269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 126 License No.

DPR-38

1.

The Nuclear Regulatory Commission (the Commission) has found that:

The application for amendment by Duke Power Company (the licensee) dated September 14, 1983,complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No.

DPR-38 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 126 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

940215__4 PDR AD 2C 840130

?

AD0CK 05000269 PDR

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION J6hn F. Stolz, Chief perniting Reactors Bi nch #4 Di-vision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 30, 1984

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C.70555 DUkE POWER COMPANY DOCKET NO.

50- 270 OCONEE NUCLEAR STATION, UNIT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.126 License No. DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated September 14, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility Operating License No. DPR-47 is hereby amended to read as follows:

3.8 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 126 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specificatibns.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jon.%tolz Chief Operating Reactors anch #4 D-i'vision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 30, 1984

  • .pR STATES UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.

50- 287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 123 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated September 14, 1983,complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of FAqility Operating License No.

DPR-55 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.123 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION n F. Stolz, Chi Operating Reactors ranch #4

-Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 30, 1934

ATT 9 HMENTS TO LICENSE AMENDMENTS AMENDMENT NO.126 TO. DPR-38 AMENMMENT NO.1267T DPR-47 AMENDMENT No. 123 TO DPR-55 DOCKETS NOS.

50-269, 50-270 AND 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised zages are identified by amendment numbers and contain vertical lines indicating the area of change.

Remove Pazes Insert Pases

3. 5-2 6a 3.5-26a 3.5-26b 3.5-26b

lbo 10.0,102)(9012 (600,92) 80 (0,80).(40,80)

RESTRICTED OPERATION LL a60 (60,60)

C) 0

< 40

-ACCEPTABLE OPERATION

< 4 (100,40) 0 20 0

20 40 60 80 100 APSR POSITION,%WD APSR POSITION LIMITS FOR OPERATION 200 +/- 10 EFPD TO

+ 0 385 10EFPD UNIT 3 (DMIou OCONEE NUCLEAR STATION Figure 3.5.2-4C2 Amendments Nos.- 126

, 126,

123 3.5-26a

(12,102) 1001 (37.3,102)

(40,92) 80-(12,80)

(40,80)

(0,70)

RESTRICTED OPERATION 60-(60,60) 0 4

0U

a.

0

<ACCEPTABLE OPERATION (0,0 20 20 0

0 20 40 60 80 100 APSR POSITION,%WD APSR POSITION LIMITS AFTER 385 +0 EFPD

-10 UNIT 3 OCONEE NUCLEAR STATION Figure 3.5.2-403 Amendments Nos.

126 126

&123 3.5-26b