ML15112B102
| ML15112B102 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/15/1983 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Duke Power Co |
| Shared Package | |
| ML15112B103 | List: |
| References | |
| DPR-38-A-120, DPR-47-A-120, DPR-55-A-117, DPR-55-A-120 NUDOCS 8305090111 | |
| Download: ML15112B102 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50- 269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.120 License No. DPR-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated February 23, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can-be conducted without endangering-the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility Operating License No. DPR-38 is hereby amended to read as follows:
3.B Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 120, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
8305090111 830415 PDR ADOCK 05000269 P
-2
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Joh F. Stolz, Chief Ope ating Reactors Branch #4 Di sion of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: April 15, 1983
,E V.W UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 DUKE POWER COMPANY DOCKET NO.
50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 120 License to. DPR-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated February 23, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangeringthe health and safety of the public, and (ii) that such activities wil1 be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-47 is hereby amended to read as follows:
3.8 Technical Specifications, The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 120, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
0*
0
-2
- 3. This license amendment is effective as of the date of its issuance.
R THE NUCLEAR REGU TORY COMMISSION Jo F. Stolz, Chief 0
rating Reactors Branch #4 ivision of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: April 15, 1983 V
4J, UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.
50-237 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 117 License No. DPR-55
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated February 23, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can -be conducted without endangeringthe health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility Operating License No. DPR-55 is hereby amended to read as follows:
3B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 117, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
-2
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jo -F. Stolz, Chief Op rating Reactors Branch #4 vision of Licensing
Attachment:
Changes to the TechniQal Specifications Date of Issuance:
April 15, 1983
ATTACHMENTS TO LICENSE AMENDMENTS AMENDMENT NO.120 TO DPR-38 AMENDMENT NO.120 TO DPR-47 AMENDMENT NO.117 TO DPR-55 DOCKETS NOS.
50-269, 50-270 AND 50-287 Replace the following page of the Appendix "A" Technical Specifications with the attached page. Thetrevised page is identified by amendment numbers and contains vertical li'nes indicating the area of change.
Remove Page Insert Page 4.2-3 4.2-3
Table 4.2-1 OCONEE NUCLEAR STATION CAPSULE ASSEMBLY ITHDRAWAL SCHEDULE AT CRYSTAL RIVER UNIT NO. 3 Capsule Designation Insertion Withdrawal OCI-A End of 1st Cycle End of 4th Cycle OCI-B End of 4th Cycle End of 16th Cycle OCI-C End of*2nd Cycle End of11th Cycle OCI-D End of 9th Cycle End of 18th Cycle OCII-A End of 1st Cycle End of 2nd Cycle OCII-B End of 4th Cycle End of 9th Cycle.
OCII-D End of 9th Cycle End of 18th Cycle OCII-E End of 1st Cycle End of 9th Cycle OCII-F End of 9th Cycle End of 18th Cycle OCIII-B End of 1st Cycle End of 2nd Cycle OCIII-C End of 4th Cycle End of 10th Cycle OCIII-D End of 1st Cycle End of 9th Cycle OCIII-E End of 5th Cycle End of 18th Cycle OCIII-F End of 11th Cycle End of 20th Cycle NOTE:
OCI Capsules are from Unit No. I OCII Capsules are from Unit No. 2 OCIII Capsules are from Unit No. 3 Amendments flos. 120 120
& 117 4.2-3