ML15112B088

From kanterella
Jump to navigation Jump to search
Amends 118,118 & 115 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Requiring Yearly Review of Station Emergency & Security Plans by Nuclear Safety Review Board
ML15112B088
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/04/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duke Power Co
Shared Package
ML15112B089 List:
References
DPR-38-A-118, DPR-47-A-118, DPR-55-A-115 NUDOCS 8303160125
Download: ML15112B088 (8)


Text

0 UNITED STATES

. RLEAR REGULATORY COMMISSIO WASHINGTpN, D. C.,20555 DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 118 License No. DPR-30

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the.licensee) dated December 21, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Com mission's rules and regulations set forth in 10 CFR Chapter I; B..The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the.attachment to this license amendment and paragraph 3.B of Facillty Operating License No. DPR-38 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.118 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

.8303160125 830304 PDR ADOCK 05000269 p

PDR

  • 2
3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jo n'. Stolz, Chief Op rating Reactors Br h #4

\\ ision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: MAR 04 13

OAs UNITED STATES All

  • NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.118 License No. DPR-47
1. The Nuclear Regulatory Commi'ssion (the Commission) has found that:

A. The application for amendment by Duke Power Company (the.licensee) dated December 21, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Com mission's rules and regulations set forth in 10 CFR Chopter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility Operating License No. DPR-47 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No.118 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jo F. Stolz, Chie Op rating Reactors Branch #4 1vision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: MR 04 1983

o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C.20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT NO.3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.115 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the.licensee) dated December 21, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Com mission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of-this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.115 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

'-2

3. This license amendment is effeztive as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jo F. Stolz, Chief 1 trating Reactors Branch #4.

Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: MAR 04

ATTACHMENTS TO LICENSE AMENDMENTS AMENDMENT NO.118 TO DPR-38 AMENDMENT NO.118 TO DPR-47 AMENDMENT NO.115 TO DPR-55 DOCKETS NOS.

50-269, 50-270 AND 50-287 Replace the following page of the Appendix "A" Technical Specifications with the attached page.

The revised page is identified by amendment numbers and contains a vertical line indicating the area of change.

Remove Page Insert Page 6.1-5 6.1-5

6.1.3.4 Audits Audits of station activities shall be performed under the cognizance of the NSRB.

These audits shall encompass:

a.

The conformance of station operation to provisions contained within the Technical Specifications and applicable facility operating license conditions at least once per year.

b.

The performance, training and qualifications of the station staff at least once per year.

C. The results of actions taken to correct deficiencies occurring in equip ment, structures, systems or methods of operation that affect nuclear safety at least once per six months.

d. The performance of activities required by the quality assurance program to meet the criteria of Appendix B to 10 CFR 50 at least once per two years.
a. The station emergency plan and implementing procedures at least once per year.
f. The station security plan and implementing procedures at least once per year.
g. Any other area of station operation considered appropriate by the NSRB or the Vice President, Nuclear Production Department.
h. The station fire protection program and implementing procedures at least once per 24 months.

6.1.3.5 Responsibilities and Authorities

a. The NSRB shall report to and advise the Vice President, Nuclear Production Department on those areas of responsibility specified in Specifications 6.1.3.3 and 6.1.3.4.
b. Minutes shall be prepared and forwarded to the Vice President, Nuclear Production Department, and to the Executive Vice President, Power Operations, within 14 days following each formal meeting of the NSRB.
c. Records of activities performed in accordance with Specifications 6.1.3.3 and 6.1.3.4 shall be maintained.
d. Audit reports encompassed by Sectim 6.1.3.4 shall be forwarded to the Vice President, Nuclear Production Department and to the Executive Vice President, Power Operations, and to the management position responsible for the areas audited within 30 days of completion of each audit.

/

Amendments Nos. 118, 11

, & 115 6.1-5