Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-158, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 L-24-157, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-114, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation L-24-115, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 2024-09-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 30, 2015 Mr. Eric A. Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1AND2-CORRECTION TO AMENDMENT NOS. 293 AND 180 REGARDING EXTENSION OF CONTAINMENT LEAKAGE TEST FREQUENCY {TAC NOS. MF3985 AND MF3986)
Dear Mr. Larson:
On April 8, 2015, the U.S. Nuclear Regulatory Commission (NRG) issued Amendment Nos. 293 and 1801 to Renewed Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, in response to your application dated April 16, 2014, as supplemented by letters dated November 4, 2014, and March 23, 2015. The amendments modified the Technical Specification requirements for containment leakage test frequency.
On April 15, 2015, the FirstEnergy Nuclear Operating Company staff notified the NRG staff that one of the safety evaluation pages for BVPS Amendment Nos. 293 and 180 contained typographical errors. Specifically, on page 7 of the safety evaluation, two blocks within Table 4 contain repeated data. The corrected page is enclosed.
Please replace page 7 of the safety evaluation with the enclosed page. The NRG staff regrets any inconvenience this may have caused.
If you have any questions, please contact me at (301) 415-7128.
Sincerely, Taylf;(~oject Plant Licensing Branch 1-2 Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
Safety Evaluation page 7 cc w/encls: Distribution via ListServ
' Agencywide Documents Access and Management System Accession No. ML15078A058.
Table 3: BVPS-1 Historical Type Band Type C Leak Rate Results Refueling As-Found Min Percentage of As-Left Max Percentage of Outage Path 0.6 La Path 0.6 La 1R15 Spring 454.47 SCFD 11.6% 1,409.58 SCFD 35.9%
2003 1R16 Fall 2004 543.81 SCFD 13.8% 1,074.90 SCFD 27.4%
1R17 Spring 1,305. 76 SCFD 33.2% 1,560.95 SCFD 37.7%
2006 1R18 Fall 2007 853.52 SCFD 20.7% 2, 180.47 SCFD 52.8%
1R19 Spring 581.92 SCFD 14.1% 1,330.50 SCFD 32.2%
2009 1R20 Fall 2010 858.60 SCFD 21.0% 1,563.58 SCFD 38.2%
1R21 Spring 818.46 SCFD 20.0% 1,879.23 SCFD 45.9%
2012 1R22 Fall 2013 1,007.97 SCFD 24.6% 1,680.68 SCFD 41.0%
SCFD = Standard Cubic Feet per Day The limit for leakage is 0.6 La for both the as-found minimum pathway leak rate and the as-left maximum pathway leak rate. For BVPS-1, the average as-found minimum pathway leak rate is 19.9 percent of 0.6 La and high of 33.2 percent. Similarly, the average and high as-left maximum pathway leak rate was 38.9 percent and 52.8 percent, respectively.
Table 4: BVPS-2 Historical Type B and Type C Leak Rate Results Refueling As-Found Min Percentage of As-Left Max Percentage of Outage Path 0.6 La Path 0.6 La 2R10 Fall 2003 689.08 SCFD 16.6% 1,318.30 SCFD 31.7%
2R11 Spring 2,706.1 SCFD 65.0% 1,374.06 SCFD 33.0%
2005 2R12 Fall 2006 966.01 SCFD 23.2% 1,742.53 SCFD 41.0%
2R13 Spring 664.99 SCFD 15.8% 1,308.06 SCFD 31.0%
2008 2R14 Fall 2009 814.81 SCFD 19.3% 1,173.47 SCFD 27.8%
2R15 Spring 522.17 SCFD 12.4% 1,046.45 SCFD 24.8%
2011 2R16 Fall 2012 620.00 SCFD 14.7% 1,264.61 SCFD 30.0%
SCFD = Standard Cubic Feet per Day The limit for leakage is 0.6 La for both the as-found minimum pathway leak rate and the as-left maximum pathway leak rate. For BVPS-2 the average as-found minimum pathway leak rate is 23.9 percent of 0.6 La and high of 65.0 percent. Similarly, the average and high as-left maximum pathway leak rate was 31.3 percent and 41.0 percent, respectively.
ML15112B087 *via e-mail OFFICE LPL 1-2/PM LPL 1-2/LA LPL 1-2BC LPL 1-2/PM NAME TLamb ABaxter* DBroaddus TLamb DATE 4/29/15 04/29/15 4/30/15 4/30/15