ML15112B083

From kanterella
Jump to navigation Jump to search
Amends 117,117 & 114 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Incorporating Digital Logic Channels & Emergency Power Switching Logic & Revising Bases to Define Redundant Component Testing
ML15112B083
Person / Time
Site: Oconee  
Issue date: 11/22/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duke Power Co
Shared Package
ML15112B084 List:
References
DPR-38-A-117, DPR-47-A-117, DPR-55-A-114 NUDOCS 8212010418
Download: ML15112B083 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.

50- 269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.117 License No.

DPR-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The applications for amendment by Duke Power Company (the licensee) dated April 30, 1982, and September 27, 1982, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the applications, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:

3.8 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 117are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

8212010418 821122 PDR ADOCK 05000269 PDR

((

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION oh

. Stolz, Chief p ating Reactors Bra ch #4 D-ision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

November 22, 1982,

R REG&

o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 1 ~*November 22, 1982 Dockets Nos. 0-269, 50-270 and 50-287 Mr. Hal B. Tucker Vice President, Nuc ar Production Department Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

The Commission has issued the closed Amendments os. 117, 117, and114for Licenses Nos. DPR-38, PR-47 and DPR 5 for the Oconee Nuclear Station, Units Nos. 1, 2 d 3. These amendments consist of changes to the Station's common echnical pecifications (TSs) in response to your applications dat d Apri 30 and September 27, 1982.

These amendments revise the TSs to inco rate digital logic channels and emergency power switchin log'c, revise the bases to define redundant component testing ad dele the administrative control on emergency drills.

Copies of the Safety Evaluation d the Notice o Issuance are also enclosed.

Sincerely, I.o Philip C. Wagner, ject Manager Operating Reactors anch #4 Division of Licensing

Enclosures:

1. Amendment No.

117 to DPR-38

2. Amendment No.

117to DPR-47

3. Amendment No.

114 to DPR-55

4.

Safety Evaluation

5. Notice cc w/enclosures:

See next page

Duke Power Company cc w/enclosure(s):

Mr. William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308 William T. Orders Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 J. Michael McGarry, III, Esq.

DeBevoi se & Liberman 1200 17th Street, N.W.

Washington, D. C. 20036

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.

50- 270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

117 License No.

DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The applications for amendment by Duke Power Company (the licensee) dated April 30, 1982, and September 27, 1982, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the applications, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the conmmon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of FAcility Operating License No. DPR-47 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 117 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jo F. Stolz, Chief 0 erating Reactors B anch #4 ivision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: November 22, 1982

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 114 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The applications for amendment by Duke Power Company (the licensee) dated April 30, 1982, and September 27, 1982, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the applications, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.114 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

0 0

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REG LATORY COMMISSION oh F. Stolz, Chief Op ating Reactors Br ch #4 Di ision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

November 22, 1982

ATTACHMENTS TO LICENSE AMENDMENTS AMENDMENT NO.117 TO DPR-38 AMENDMENT NO.117 TO DPR-47 AMENDMENT NO.114 TO DPR-55 DOCKETS NOS.

50-269, 50-270 AND 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised pages are identified by amendment numbers and contain vertical lines indicating the area of change.

Remove Payes Insert Pages vi Vi 3.3-6 3.3-6 3.5-2 3.5-2 3.5-5 3.5-5 3.5-5a 3.5-5a 3.5-5b 3.5-5b 3.5-5c 3.7-1 3.7-1 3.7-2 3.7-2 3.7-2T 3.7-3 3.7-3 3.7-4 3.7-4 3.7-5 3.7-5 3.7-6 3.7-6 3.7-7 3.7-7 3.7-8 3.7-8 3.7-9 3.7-9 3.7-10 3.7-11 3.7-12

.3.7-13 6.4-1 6.4-1

LIST OF TABLES Table No.

Page 2.3-1A Reactor Protective System Trip Setting Limits - Unit 1 2.3-11 2.3-1B Reactor Protective System Trip Setting Limits -

Unit 2 2.3-12 2.3-1C Reactor Protective System Trip Setting Limits - Unit 3 2.3-13 3.5-1-1 Instruments Operating Conditions 3.5-4 3.5-1 Quadrant Power Tilt Limits 3.5-14 3.7-1 Operability Requirements for the Emergency Power Switching 3.7-13 Logic Circuits 3.17-1 Fire Protection & Detection Systems 3.17-5 4.1-1 Instrument Surveillance Requirements 4.1-3 4.1-2 Minimum Equipment Test Frequency 4.1-9 4.1-3 Minimum Sampling Frequency 4.1-10 4.2-1 Oconee Nuclear Station Capsule Assembly Withdrawal Schedule 4.2-3 at Crystal Riyer Unit No. 3 4.4-1 List of Penetrations with 10CFR50 Appendix J Test 4.4-6 Requirements 4.11-1 Oconee Environmental Radioactivity Monitoring Program 4.11-3 4.11-2 Offsite Radiological Monitoring Program 4.11-4 4.11-3 Analytical Sensitivities 4.11-5 4.17-1 Steam Generator Tube Inspection 4.17-6 6.1-1 Minimum Operating Shift Requirements with Fuel in Three 6.1-6 Reactor Vessels 6.6-1 Report of Radioactive Effluents 6.6-8 Amendments Nos.

117, 117, & 114 vi