Forwards RAI Re Request for Relief from Testing Requirements for Pressure Retaining Bolting.Response Requested within 15 Days
ML15112A634
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 05/29/1998
From: Rinaldi F
NRC (Affiliation Not Assigned)
To: Tuckman M
DUKE POWER CO.
References
TAC-MA1504, TAC-MA1505, TAC-MA1509, TAC-MA1510, TAC-MA1513, TAC-MA1514, TAC-MA1515, NUDOCS 9806020390
Download: ML15112A634 (4)


Text

May 29, 19 Mr. M. S Tuckman Executive Vice President Nuclear Generation Department Duke Energy Corporation P. 0. Box 1006 Charlotte, NC 28201

SUBJECT:

CATAWBA, MCGUIRE, AND OCONEE NUCLEAR STATIONS - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR RELIEF FROM TEST REQUIREMENTS FOR PRESSURE RETAINING BOLTING (TACs MA1504, MA1505, MA1509, MA1510, MA1513, MA1514, AND MA1515)

Dear Mr. Tuckman:

By letter dated April 6, 1998, you submitted a request for relief from the bolt torque or tension test requirements for pressure retaining bolting of Class MC pressure retaining components and metallic liners of Class CC components, as specified in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI.

The staff's review of your request indicates that additional information is needed. Specifically, please explain how the tension and torque pre-loads and the physical conditions (e.g.,

indications of rusting, corrosion, or flaking of bolt heads) of the bolts used for pressure unseating containment penetrations are monitored and maintained. As applicable, also provide the procedures used to monitor and maintain the functionality of these bolts for the pressure unseating containment penetrations and a list of all penetrations for each of the containments requesting the relief.

Please provide your response within 15 days of receipt of this letter. This schedule is needed to support your requested NRC response date of July 1, 1998.

Sincerely, Original sigrby P. Tam for Frank Rinaldi, Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, DISTRIBUTION 50-370, 50-269, 50-270, Docket File OGC and 50-287 PUBLIC LPlisco, RII cc: See next page PDII-2 RF ACRS FRinaldi COgle,RII PTam

uck, 13H15 DLaBarge JZwolinski DOCUMENT NAME
G:\\MCGUIRE\\MCGA1509.RAI To receive a copy of this document, indicate in the box:

8 R C

N "C" = Copy w/o encl "E" = Copy w/encl "N" = No copy OFFICE PDII-2\\PM PDII-2\\LA PDII-2/D NAME FRinaldi:c J.Berry sf7-,

HBerkow

(

DATE 2 /98 7

la2fl98

/1 /98

/98 V

OFFICIAL RECORD COPY 806020390 980529 PDR ADOCK 05000269 P

PDR L

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555001 May 29, 1998 Mr. M. S. Tuckman Executive Vice President Nuclear Generation Department Duke Energy Corporation P. 0. Box 1006 Charlotte, NC 28201

SUBJECT:

CATAWBA, MCGUIRE, AND OCONEE NUCLEAR STATIONS - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR RELIEF FROM TEST REQUIREMENTS FOR PRESSURE RETAINING BOLTING (TACs MA1504, MA1505, MA1509, MA1510, MA1513, MA1514, AND MAi515)

Dear Mr. Tuckman:

By letter dated April 6, 1998, you submitted a request for relief from the bolt torque or tension test requirements for pressure retaining bolting of Class MC pressure retaining components and metallic liners of Class CC components, as specified in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI.

The staffs review of your request indicates that additional information is needed. Specifically, please explain how the tension and torque pre-loads and the physical conditions (e.g.,

indications of rusting, corrosion, or flaking of bolt heads) of the bolts used for pressure unseating containment penetrations are monitored and maintained. As applicable, also provide the procedures used to monitor and maintain the functionality of these bolts for the pressure unseating containment penetrations and a list of all penetrations for each of the containments requesting the relief.

Please provide your response within 15 days of receipt of this letter. This schedule is needed to support your requested NRC response date of July 1, 1998.

Sincerely, Frank Rinaldi, Project Manager Project Directorate 11-2 Division of Reactor Projects - I/Il Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, 50-370, 50-269, 50-270, and 50-287 cc: See next page

Catawba, McGuire, Oconee Nuclear Stations cc:

Dr. John M. Barry Mr. Robert B. Borsum Mecklenburg County Framatome Technologies Department of Environmental Suite 525 Protection 1700 Rockville Pike 700 N Tryon Street Rockville, Maryland 20852 Charlotte, North Carolina 29202 Manager, LIS County Manager of Mecklenburg County NUS Corporation 720 East Fourth Street 2650 McCormick Drive, 3rd Floor Charlotte, North Carolina 28202 Clearwater, Florida 34619-1035 Mr. Michael T. Cash Senior Resident Inspector Regulatory Compliance Manager U.S. Nuclear Regulatory Commission Duke Energy Corporation 7812B Rochester Highway McGuire Nuclear Site Seneca, South Carolina 29672 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. G. R. Peterson Site Vice President Senior Resident Inspector Catawba Nuclear Station clo U.S. Nuclear Regulatory Duke Energy Corporation Commission 4800 Concord Road 12700 Hagers Ferry Road York, South Carolina 29745 Huntersville, North Carolina 28078 Mr. H. B. Barron Mr. Richard M. Fry, Director Vice President, McGuire Site Division of Radiation Protection Duke Energy Corporation North Carolina Department of 12700 Hagers Ferry Road Environment, Health, and Natural Huntersville, North Carolina 28078 Resources 3825 Barrett Drive Mr. William R. McCollum Raleigh, North Carolina 27609-7721 Vice President, Oconee Site Duke Energy Corporation County Supervisor of Oconee County P. 0. Box 1439 Walhalla, South Carolina 27621 Seneca, South Carolina 29679 Elaine Wathen, Lead REP Planner North Carolina Electric Membership Division of Emergency Management Corporation 116 West Jones Street P. 0. Box 27306 Raleigh, North Carolina 27603-1335 Raleigh, North Carolina 27611 Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745

Catawba, McGuire, Oconee Nuclear Stations cc:

Mr. M. S. Kitlan Saluda River Electric Cooperative, Regulatory Compliance Manager Inc.

Duke Energy Corporation P. 0. Box 929 4800 Concord Road Laurens, South Carolina 29360 York, South Carolina 29745 Senior Resident Inspector Mr. Paul R. Newton U.S. Nuclear Regulatory Commission Legal Department (PBO5E) 4830 Concord Road Duke Energy Corporation York, South Carolina 29745 422 South Church Street Charlotte, North Carolina 28242 Regional Administrator, Region II U.S. Nuclear Regulatory Commission J. Michael McGarry, III, Esquire Atlanta Federal Center Winston and Strawn 61 Forsyth Street, S.W., Suite 23T85 1400 L Street, NW.

Atlanta, Georgia 30303 Washington, DC 20005 Max Batavia, Chief North Carolina Municipal Power Bureau of Radiological Health Agency Number 1 South Carolina Department of Health 1427 Meadowwood Boulevard and Environmental Control P. 0. Box 29513 2600 Bull Street Raleigh, North Carolina 27626 Columbia, South Carolina 29201 Mr. Peter R. Harden, IV Ms. Karen E. Long Account Sales Manager Assistant Attorney General Westinghouse Electric Corporation North Carolina Department of Justice Power Systems Field Sales P. 0. Box 629 P. O. Box 7288 Raleigh, North Carolina 27602 Charlotte, North Carolina 28241 L. A. Keller County Manager of York County Manager - Nuclear Regulatory York County Courthouse Licensing York, South Carolina 29745 Duke Energy Corporation 526 South Church Street Piedmont Municipal Power Agency Charlotte, North Carolina 28242-0001 121 Village Drive Greer, South Carolina 29651 Mr. Ed Burchfield Compliance Duke Energy Corporation Oconee Nuclear Site P. 0. Box 1439 Seneca, South Carolina 29679