UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-)001 February 12, 1999 Mr. W. R. McCollum, Jr.
Vice President, Oconee Site Duke Energy Corporation P. 0. Box 1439 Seneca, SC 29679
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
Dear Mr. McCollum:
By your application dated January 11, 1999, and affidavit dated January 6, 1999, executed by Joseph J. Kelly, Framatome Technologies, Inc. (FTI), you submitted the following documents:
FTI Document 86-1266231-01, "ONS [Oconee Nuclear Station]-1 PT Fluence Analysis Report Cycles 11-16," dated February 1998, FTI Document 86-1258198-01, "ONS-2 PT Fluence Analysis Report - Cycles 9-14," dated December 1997, and FTI Document 86-1266235-01, "ONS-3 PT Fluence Analysis Report -Cycles 12-15," dated February 1998. You requested that these documents be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was submitted for placement in the NRC's public document room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- b.
The information reveals data or material concerning FTI research or development plans or programs of present or potential competitive advantage to FTI.
- c.
The use of the information by a competitor would decrease his expenditures, in time or resources, in designing, producing or marketing a similar product.
- d.
The information consists of test data or other similar data concerning a process, method or component, the application of which results in a competitive advantage to FTI.
- e.
The information reveals special aspects of a process, method, component or the like, the exclusive use of which results in a competitive advantage to FTI.
We have reviewed your application and the material in accordance with the requirements of a
10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the documents listed herein marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
02190309 990212.
PDR ADOCK 05000269 P
PDR t~j~c3
- v7
W. R. McCollum, Jr.
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1472.
Sincerely, original signed by:
David E. LaBarge, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - III Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page Distribution:
H. Berkow Docket File L. Berry PUBLIC D. LaBarge PD 11-2 Rdg.
M. P. Siemien, OGC J. Zwolinski L. Plisco, RII C. Ogle, RII To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE PM:
LA:PDII-2.
BC:Tech Br.-
OGC C D:P NAME D. La e:cn L. Berry T. Collin M.P.
iemien H. er DATE L2/J9 I,99 99
()99
/LIl
/ /97 DOCUMENT NAME: G:\\OCONEEWITFTI.WPD
'OFFICIAL RECORD COPY
W. R. McCollum, Jr.
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1472.
Sincerely, original signed by:
David E. LaBarge, Senior Project Manager Rroject Directorate 11-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page Distribution:
H. Berkow Docket File L. Berry PUBLIC D. LaBarge PD 11-2 Rdg.
M. P. Siemien, OGC J. Zwolinski L. Plisco, RII C. Ogle, RII To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure E" = Copy with attachment/enclosure "N" = No copy
/,
OFFICE PM LA:PDII-2, BC:Tech Br OGCW D:PL NAME D.La e:cn L. Berry T. Collin M.P.
iemien H. er DATE 1/I 2J9/
99 99 / =
( 99
'L ill
/ /97 DOCUMENT NAME: G:\\OCONEEWITFTI.WPD
'OFFICIAL RECORD COPY
W. R. McCollum, Jr.
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1472.
- Sincerel, David E. LaBarge, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/Il Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page
Oconee Nuclear Station cc:
Ms. Lisa F. Vaughn Mr. J. E. Burchfield Legal Department (PBO5E)
Compliance Manager Duke Energy Corporation Duke Energy Corporation 422 South Church Street Oconee Nuclear Site Charlotte, North Carolina 28201-1006 P. 0. Box 1439 Seneca, South Carolina 29679 J. Michael McGarry, III, Esquire Winston and Strawn Ms. Karen E. Long 1400 L Street, NW.
Assistant Attorney General Washington, DC 20005 North Carolina Department of Justice Mr. Rick N. Edwards P. 0. Box 629 Framatome Technologies Raleigh, North Carolina 27602 Suite 525 1700 Rockville Pike L. A. Keller Rockville, Maryland 20852-1631 Manager - Nuclear Regulatory Licensing Manager, LIS Duke Energy Corporation NUS Corporation 526 South Church Street 2650 McCormick Drive, 3rd Floor Charlotte, North Carolina 28201-1006 Clearwater, Florida 34619-1035 Mr. Richard M. Fry, Director Senior Resident Inspector Division of Radiation Protection U. S. Nuclear Regulatory North Carolina Department of Commission Environment, Health, and 7812B Rochester Highway Natural Resources Seneca, South Carolina 29672 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Mr. Steven P. Shaver Atlanta Federal Center Senior Sales Engineer 61 Forsyth Street, S.W., Suite 23T85 Westinghouse Electric Company Atlanta, Georgia 30303 5929 Carnegie Blvd.
Suite 500 Virgil R. Autry, Director Charlotte, North Carolina 28209 Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 County Supervisor of Oconee County Walhalla, South Carolina 29621