NRR E-mail Capture - NRC Staff'S LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request Nos. 15 (TAC Nos. MF5794 and MF5795), 16 (TAC No. MF5796), and 17
ML15100A370
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/08/2015
From: Audrey Klett
Plant Licensing Branch II
To: Guth J, Hanek O
Florida Power & Light Co
References
TAC MF5794, TAC MF5795, TAC MF5796, TAC MF5797
Download: ML15100A370 (2)


Text

NRR-PMDAPEm Resource From: Klett, Audrey Sent: Wednesday, April 08, 2015 1:09 PM To: Mitch.Guth@fpl.com; 'Hanek, Olga' (Olga.Hanek@fpl.com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request Nos.

15 (TAC Nos. MF5794 and MF5795), 16 (TAC No. MF5796), and 17 (TAC No. MF5797)

Mitch, Olga, Stavy, By letter dated February 13, 2015 (Agencywide Documents Access and Management System Accession No. ML15062A279), Florida Power & Light Company (the licensee) submitted Relief Request Nos. 15, 16, and 17 for the fourth 10-year inservice inspection (ISI) intervals of Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point 3 and 4). The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.

If you have any questions, please call me at (301) 415-0489.

Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489 1

Hearing Identifier: NRR_PMDA Email Number: 1985 Mail Envelope Properties (Audrey.Klett@nrc.gov20150408130800)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request Nos. 15 (TAC Nos. MF5794 and MF5795), 16 (TAC No. MF5796), and 17 (TAC No. MF5797)

Sent Date: 4/8/2015 1:08:45 PM Received Date: 4/8/2015 1:08:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:

"Mitch.Guth@fpl.com" <Mitch.Guth@fpl.com>

Tracking Status: None

"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>

Tracking Status: None

"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1692 4/8/2015 1:08:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: