ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Oconee Date of Examination: 06/09/14 Exam Level: RO SRO-l SRO-U Operating Test No.: 1 Control Room Systems (8 for RO); (7 for SRO-l); (2 or 3 for SRO-U, including 1 ESF)
System I JPM Title Type Code* Safety Function
- a. CRO-310 Perform Required Actions for a Failed LPI Train M A E L 3 EOP Enclosure 5.1 (ES Actuation) EN
[KA: EPE 011 EA1 .04 (4.4/4.4)] (10 mm)
- b. CRO-407 Establish EFDW Flow Through Startup Valves 4S EOP, End. 5.27 (Alternate Methods for Controlling D, A, S, E, EFDW Flow) L
[KA: APE-054 AA2.04 (4.2/4.3)] (15 mm)
- c. CRO-602 Live Bus Transfer of MFB Power From CT-i To CT-4 (15 mm) OP/0/A11106/019, Enclosure 4.11 (Live D L 6 Bus Transfer Of MFB Power From CT4 To CT1)
[KA: 062 A4.01 (3.3/3.1)] (15 mm)
- d. CR0-ill Withdrawal of Safety Rod Group 1 to 50%
OP/1/A/1105/019 End. 4.3 (Withdrawal of Safety Rod D A S L 1 Group 1 to 50%)
[KA: 001 G2.2.2 (4.6/4.1)] (12 mm)
[KA: 002 A2.01 (4.3/4.4)] (14 mm)
- f. CRO-408a Start fourth Reactor Coolant Pump OP/1/A/1103/006 End. 4.4 (Starting 1B2 RCP) D A L 4P
[KA:003 A4.06 (2.9*/2.9)1 (15 mm)
- g. CRO-508 Pump the Quench Tank OP/1/A11104/017 End. 4.1 (Pumping QT) M L S 5
[KA: 007 A1.01 (2.9/3.1)] (10 mm)
- h. CRO-801b Align Intake Canal for Recirc on Dam M A L 8 Failure (15 mm) AP/1 IA/i 700/13 (Dam Failure)
[KA: 075 A2.0i (3.0*13.2)] (15 mm)
In-Plant Systems© (3 for RO); (3 for SRO-l); (3 or 2 for SRO-U)
- i. AO-710 Place Reactor Building Hydrogen Analyzers in Service D R E 5 EOP End 5.2 (Placing RB Hydrogen Analyzers In Service)
[KA: 028 A4.03 (3.1/3.3)] (12 mm)
- j. CRO-805 OATC Actions for Control Room Evacuation N 8 AP/3/AI1 700/050 End. 5.5 (OATC Actions for Control Room Evacuation)
[KA: BW/A06 AA1 .10 (3 7*/3 9)] (25 mm)
[KA: 061 A2.04 (3.4/3.8)] (8 mm)
@ All RO and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Type Codes Criteria for RO! SRO-l I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irectfrombank 9I8I4 (E)mergency or abnormal in-plant 1 I 1 I 1 (EN)gineered safety feature - I - I 1 (control room system)
(L)ow-Power I Shutdown 1 I 1 I 1 (N)ew or (M)odified from bank including 1 (A) 2I 2I 1 (P)revious 2 exams 3 I 3 I 2 (randomly selected)
(R)CA 1I1I1 (S)imulator
ES-3d Control Room/In-Plant Systems Outline Form ES-3d 1 -2 Facility: Oconee Date of Examination: 06/09/14 Exam Level: RO SRO-l SRO-U Operating Test No.:
Control Room Systems (8 for RO); (7 for SRO-l); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. CRO-310 Perform Required Actions for a Failed LPI Train M A E L 3 EOP Enclosure 5.1 (ES Actuation) EN
[KA: EPE Oil EA1 .04 (4.4/4.4)] (10 mm)
- b. CRO-407 Establish EFDW Flow Through Startup Valves 4S A
EOP, End. 5.27 (Alternate Methods for Controlling )
EFDW Flow) L
[KA: APE-054 AA2.04 (4.2/4.3)] (15 mm)
- c. CRO-602 Live Bus Transfer of MFB Power From CT-i To CT-4 (15 mm) OP/a/Ni 106/019, Enclosure 4.11 (Live D L 6 Bus Transfer Of MFB Power From CT4 To CT1)
[KA: 062 A4.01 (3.3/3.1)] (15 mm)
- d. N/A
- e. N/A
- f. N/A
- g. N/A
- h. N/A
In-Plant Systemsa (3 for RO); (3 for SRO-l); (3 or 2 for SRO-U)
- i. AO-710 Place Reactor Building Hydrogen Analyzers in Service D R E 5 EOP End 52 (Placing RB Hydrogen Analyzers In Service)
[KA: 028 A4.03 (3.1/3.3)] (12 mm)
- j. CRO-805 OATC Actions for Control Room Evacuation AP/3/A/1 700/050 End. 55 (OATC Actions for Control N 8 Room Evacuation)
[KA: BW/A06 AA1 .10 (3*7*/3*9)] (25 mm)
- k. N/A
@ All RD and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Type Codes Criteria for RD / S RD-I / S RD-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irectfrombank 918!4 (E)mergency or abnormal in-plant 1 / 1 I 1 (EN)gineered safety feature - I - I 1 (control room system)
(L)ow-Power I Shutdown 1 I? 1 I 1 (N)ew or (M)odified from bank including 1 (A) 2I 2I 1 (P)revious 2 exams 3 I 3 I 2 (randomly selected)
(R)CA 1I1/1 (S)imulator
CRO-310 a-Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-31 0 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CAN DI DATE EXAMINER
CRO-310 a-Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Required Actions For A Failed LPI Train Alternate Path:
Yes Facility JPM #:
CRO-004 K/A Rating(s):
System: EPE 011 K/A: EA1.04 Rating: 4.4/4.4 Task Standard:
1A and lB LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1 LP-1 7 is closed after 1 A LPI pump fails.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes Time Critical: NO Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner:
NAME SIGNATURE DATE COMMENTS
CRO-310 a-Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 208
- 2. IMPORT files for CRO-31 0
- 3. WHEN directed by Lead Examiner, Go to RUN
CRO-310 a-Page 4 of 8 Tools/Equipment/Procedures Needed:
EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
- Enclosure 5.1(ES Actuation) has been completed up to Step 52 with outstanding IAATs.
- The LOCA CD Tab in progress.
- Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
- RCS pressure is decreasing rapidly.
INITIATING CUES:
The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation).
CRO-310 a-Page 5 of 8 START TIME:
STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier). SAT STANDARD: Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is <2OO psig UNSAT Continue to Step 19.
COMMENTS:
STEP 2: Step 19 IAAT RCS Pressure is < LPI pump shutoff head, SAT THEN perform Steps 20 21 -
STANDARD: Continue to Step 20.
UNSAT COMMENTS:
- CRITICAL TASK STEP 3: Step 20 Perform the following:
- Open 1LP-17
- *Sta 1A LPI Pump SAT STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1 UB2.
Places 1A LPI Pump switch to START and observes Red light on and UNSAT white light off.
Continue to Step 21.
COMMENTS:
CRO-310 a-Page 6 of 8
- CRITICAL TASK STEP 4: Step 21 Perform the following:
- Open 1LP-18
- *Sta lB LPI Pump SAT STANDARD: Determine that 1LP-18 is open by observing the red open light is lit located on 1 UB2.
Places 1 B LPI pump switch to START and observes Red light on and white light off. UNSAT Go back to Step 52.
COMMENTS:
STEP 5: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 25 now applies SAT Continue to Step 25.
UNSAT Evaluator Note: 1A LPI Pump fails while operating.
COMMENTS:
STEP 6: Step 25 CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1 B LPI pump is operating, THEN close 1LP-17.
SAT STANDARD: Determine thel A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP17.
UNSAT Cue: Another Operator will continue with this procedure.
COMMENTS:
END TASK STOP TIME:
CRO-310 a-Page 7 of 8 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 Student verifies 1LP-17 is open and Starts 1A LPIP 4 Student verifies 1LP-18 is open and Starts lB LPIP 6 Student closes 1 LP-17 when 1A LPIP fails
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
- Enclosure 5.1(ES Actuation) has been completed up to Step 52.
- The LOCA CD Tab in progress.
- Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
- RCS pressure is decreasing rapidly.
INITIATING CUES:
The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation).
CRO-407 b -
Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-407 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER
CRO-407 b -
Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Establish EFDW flow through Startup valves Alternate Path:
Yes Facility JPM #:
CRO-Ol 5 KJA Rating(s):
System: APE-054 K/A: AA2.04 Rating: 4.2/4.3 Task Standard:
EFDW flow is established to the affected header through the startup valve.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
EOP Rule 3, (Loss of Main or Emergency FDW)
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)
Validation Time: 15 minutes Time Critical: NO Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time Examiner: /
NAME SIGNATURE DATE COMMENTS
CRO-407 b-Page 3of 13 SIMULATOR OPERATOR INSTRUCTIONS
- 1. RECALL Snap 209
- 2. IMPORT files for CRO-407
- 3. WHEN directed by Lead Examiner, go to RUN
CRO-407 b -
Page 4 of 13 Tools/Equipment/Procedures Needed
- EOP End 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS
- The reactor has just tripped from 25% power
- Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check
CRO-407 b Page 5 of 13 START TIME:
STEP 1: Performs a Symptom Check STANDARD: Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater SAT EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.
COMMENTS: UNSAT STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
STANDARD: Observes that TB Flooding is NOT occurring by 2SA-1 8/A-i 1 (Turbine BSMT Water Emergency High Level) NOT illuminated. SAT (OP/2/A/61 02/018)
Candidate will perform RNO step and GO TO step 3.
UNSAT COMMENTS:
STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency),
AND any of the following exist:
- Pzr level reaches 375 [340 acc]
THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling). SAT STANDARD: Candidate determines Rule 4 is not required.
Continue to Step 4. UNSAT COMMENTS:
STEP 4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.
STANDARD: Observes MD EFDWP & TD EFDWP running with switch lights on and SAT normal discharge pressure.
Continue to Step 5.
COMMENTS: UNSAT
CRO-407 b -
Page 6 of 13 STEP 5: Rule 3: Step 5 Verify jjy EFDW Pump is operating.
STANDARD: Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have normal discharge pressure. SAT Continue to Step 6.
COMMENTS: UNSAT STEP 6: Rule 3: Step 6 GO TO step 37.
STANDARD: GO TO step 37. SAT COMMENTS:
UNSAT STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 42.-
ALTERNATE PATH SAT STANDARD: Determines that 1FDW-315 is NOT controlling properly(1A SG level is
< 30 and decreasing). Concludes that 1FDW-315 has failed closed.
Continue to Step 38. UNSAT COMMENTS:
STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL.
STANDARD: Place 1 FDW-31 5 in MANUAL by depressing the NM pushbutton on the Moore controller. SAT Continue to Step 39.
COMMENTS: UNSAT
CRO-407 b -
Page 7 of 13 STEP 9: Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL.
STANDARD: Determine that 1 FDW-315 will NOT control in MANAUL.
Perform RNO, GO TO Step 41. SAT Continue to step 41 UNSAT COMMENTS:
STEP 10: Rule 3: Step 41 Notify CR SRO that End 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.
STANDARD: Removes End. 5.27 from EOP and initiates. SAT EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27.
COMMENTS: UNSAT STEP 11: End 5.27: Step 1 Identify the failure:
1 FDW-31 5 has Failed CLOSED [GO TO Step 2]
STANDARD: Candidate determines the next procedural step from table in Step 1. SAT Continue to Step 2.
COMMENTS: UNSAT STEP 12: End 5.27: Step 2 Verify 1A MD EFDWP is operating STANDARD: Candidate verifies 1A MD EFDWP is operating. Verify red light on and green light off and normal discharge pressure. SAT Continue to Step 3.
COMMENTS: UNSAT
CRO-407 b -
Page 8 of 13 STEP 13: End 5.27: Steps 3 *CRITICAL STEP Stop 1A MD EFDWP STANDARD: *Candidate places switch to OFF.
Verify red light off and white light illuminated. SAT Continue to Step 4.
COMMENTS: UNSAT STEP 14: End 5.27: Step 4 Verify 1 B MD EFDWP is operating.
STANDARD: Candidate verifies 1 B MD EFDWP is operating. SAT Verify red light on and green light off and normal discharge pressure.
Continue to Step 5.
UNSAT COMMENTS:
STEP 15: End 5.27: Step 5 *CRITICAL STEP Place 1 TD EFDW Pump in PULL TO LOCK STANDARD: *Candidate places the Ui TD EFDW Pump in PULL to LOCK.
Candidate verifies red light is out and green light is lit. SAT Continue to Step 6.
COMMENTS: UNSAT STEP 16: End 5.27: Step 6 CRITICAL STEP Place 1 FDW-35 in HAND and set demand to 0%
STANDARD: Candidate places 1 FDW-35 in HAND and uses toggle switch to reduce demand to 0%. SAT Continue to Step 7.
COMMENTS: UNSAT
CRO-407 b -
Page 9 of 13 STEP 17: End 5.27: Step 7 *CRITICAL STEP Close 1FDW-33 STANDARD: *Candidate closes SU Control Block Valve (1 FDW-33).
Candidate verifies red light is out and green light is lit. SAT Continue to Step 8.
COMMENTS: UNSAT STEP 18: End 5.27: Step 8 Verify 1A MD EFDWP will be used.
STANDARD: Candidate determines that the 1A MD EFDWP will be used.
Continue to Step 9. SAT EXA MINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP.
UNSAT COMMENTS:
STEP 19: End 5.27: Step 9 *CRITICAL STEP Open 1 FDW-374 STANDARD: *Candidate locates and opens 1 FDW-374.
Candidate observes green closed light off and red open light on.
SAT Continue to Step 10.
COMMENTS:
UNSAT STEP 20: End 5.27: Step 10 Verify the following:
- 1 FDW-36 closed
- 1 FDW-38 open STANDARD: Candidate locates and closes 1 FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication. SAT Candidate locates and opens 1 FDW-38 and observes green closed light off and red open light lit on 1VB3 or uses OAC indication.
UNSAT Continue to Step 11.
COMMENTS:
CRO-407 b -
Page 10 of 13 STEP 21: End 5.27: Step 11 *CRITICAL STEP Start 1A MD EFDWP STANDARD: *Candidate places 1A MD EFDWP switch to RUN.
SAT Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.
Continue to Step 12. UNSAT COMMENTS:
NOTE:
Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge.
Flow from a MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge.
100 gpm could cause overcooling if adequate decay heat levels do NOT exist. SAT STEP 22: End 5.27: Step 12 Verify either of the following exists:
- HPI Forced Cooling is maintaining core cooling UNSAT
- CBP Feed providing SG feed STANDARD: Candidate determines that neither condition is met and goes to the RNO.
Continue to Step 12 RNO.
COMMENTS:
CRO-407 b -
Page 11 of 13 STEP 23: End 5.27: Step 12 RNO *CRITICAL STEP IF any SG is being fed, THEN perform the following:
- *Throffle 1FDW-35 to establish a maximum of 100 gpm.
Notify CR SRO of SG Feed Status STANDARD: Candidate throttles 1 FDW-35 to attain 100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW 35 as necessary to establish 25 S/u level (per Rule 7 table 4) SAT Rule 7 Table 4 specifies the level to establish when using EFDWP is 30 (use MFDW setpoint if feeding via S/U CV5). The MFDW setpoint (i.e.
when using the S/U CV5) is 25 S/U level since RCS temperature is UNSAT
>500°F.
EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1FDW-35 must be open and SG level increasing.
EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS:
ENDTASK STOP TIME:
CRO-407 b -
Page 12 of 13 CRITICAL STEP EXPLANATIONS STEP # Explanation 10 This step is required to ensure the correct procedure is used.
13 This step is required to ensure the valves will operate.
15 This step is required to ensure the valves will operate.
16 This step is required to align the MD EFDWP to the S/U header.
17 This step is required to align the MD EFDWP to the S/U header.
19 This step is required to align the MD EFDWP to the S/U header.
21 This step is required to start the 1A MD EFDWP and provide a SG feed source.
23 This step is required to establish flow to the 1A SG.
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
- The reactor has just tripped from 25% power
- Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check
CRO-602 c -
Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-602 LIVE BUS TRANSFER OF MFB POWER FROM CT1 TOCT4 CAN DI DATE EXAMINER
CRO-602 c -
Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path:
No Facility JPM #:
New K/A Rating(s):
System: 062 KIA: A4.01 Rating: 3.3/3.1 Task Standard:
Perform a live bus transfer from CT 4 to CT 1 by procedure.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
OPIOIA/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
Validation Time: 15 minutes Time Critical: NO Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
NAME SIGNATURE DATE COMMENTS
CRO-602 c -
Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 212
- 2. Goto RUN
- 3. SELECT Chessell to Source Range
CRO-602 c -
Page 4 of 14 Tools/Equipment/Procedures Needed:
- OP/0/AJ1 106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Oconee Unit 1 is in MODE 5.
- KHU-2 has been started by the Keowee operator.
- It is desired to energize the MFB from CT 4
- OP/0/AI1 106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES:
The Control Room SRO directs you to continue with OP/0/A/1 106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4 and energize Unit ones Main Feeder Buses.
CRO-602 C -
Page 5 of 14 START TIME:
CAUTION: DO NOT allow closure of SL1 and SKi OR SL2 and SK2 simultaneously. When CT-4 and CT-5 AUTO/MAN transfer switches are in MAN, this configuration is not prevented by interlock. SAT STEP 1: Step2.4 Energize 4160V Standby Buses:
UNSAT Step 2.4.1 Notify all three Units that the Standby Bus is about to be powered from CT 4.
STANDARD: Use the control room phone and notify all three ONS Units that the Standby Bus is about to be powered from CT 4.
COMMENTS:
STEP 2: Step 2.4.2 CRITICAL STEP Place CT 4 BUS 1 AUTO/MAN switch in MAN.
STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to MAN. SAT COMMENTS:
UNSAT STEP 3: Step 2.4.3 CRITICAL STEP Place STBY BUS 1 SYNCHRONIZING SWITCH to ON.
STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to ON. SAT COMMENTS: UNSAT
CRO-602 c -
Page 6 of 14 STEP 4: Step 2.4.4 CRITICAL STEP Close 5K 1 CT 4 STBY BUS 1 FEEDER breaker.
STANDARD: Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and SAT the red close light illuminates.
UNSAT COMMENTS:
STEP 5: Step 2.4.5 Verify 41 60V on STANDBY BUS 1 STANDBY BUS 1 VOLTS.
STANDARD: Verify 4160V on STANDBY BUS 1 STANDBY BUS 1 VOLTS on SAT gauge located on 2AB3.
U N SAT COMMENTS:
STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to OFF.
STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on SAT 2AB3, to OFF.
UNSAT COMMENTS:
CRO-602 c -
Page 7 of 14 STEP 7: Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in AUTO.
STANDARD: Candidate rotates CT4 BUS 1 AUTO/MAN switch, located on 2AB3, to SAT AUTO.
UN SAT COMMENTS:
STEP 8: Step 2.4.8 CRITICAL STEP Place CT4 BUS 2 AUTO/MAN switch in MAN.
STANDARD: Candidate rotates CT4 BUS 2 AUTO/MAN switch, located on 2AB3, to SAT MAN.
COMMENTS:
UNSAT STEP 9: Step 2.4.9 CRITICAL STEP Place STBY BUS 2 SYNCHRONIZING SWITCH to ON.
STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to ON.
SAT COMMENTS:
UNSAT
CRO-602 c -
Page 8 of 14 STEP 10: Step 2.4.10 CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER.
STANDARD: Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.
SAT UNSAT COMMENTS:
STEP 11: Step 2.4.11 Verify 4160V on STANDBY BUS 2 STANDBY BUS 2 VOLTS.
STANDARD: Verify 4160V on STANDBY BUS 2 STANDBY BUS 2 VOLTS using SAT gauge located on 2AB3 COMMENTS:
UNSAT STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to OFF.
SAT STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to OFF.
COMMENTS: UNSAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in AUTO.
SAT STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to AUTO.
U N SAT COMMENTS:
CRO-602 c -
Page 9 of 14 CAUTION: El (1,2,3) E2 (1,2,3) will NOT open automatically when the Si (1,2,3) OR S2 CRITICAL STEP (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT4 from the time the first S breaker is closed until the last E breaker is opened.
STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus:
SAT Step 2.5.1A Unit 1 Place STANDBY 1 AUTO/MAN switch in MAN.
U N SAT STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to MAN.
COMMENTS:
STEP 15: Step 2.5.1 B CRITICAL STEP Place STANDBY 2 AUTO/MAN switch in MAN.
STANDARD: Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to MAN. SAT COMMENTS: UNSAT STEP 16: Step 2.5.1C Place MFB 1 AUTO/MAN switch in MAN.
SAT STANDARD: Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in MAN.
UNSAT COMMENTS:
CRO-602 c-Page lOaf 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in MAN.
STANDARD: Candidate determines that the MFB 2 AUTO/MAN switch, located on SAT 1AB1, is in MAN.
UNSAT COMMENTS:
STEP 18: Step 2.5.1E CRITICAL STEP Open El 1 (MFB1 STARTUP FDR).
STANDARD: Candidate rotates El 1 (MFB1 STARTUP FDA) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white SAT open light illuminates.
UNSAT COMMENTS:
STEP 19: Step 2.5.1F CRITICAL STEP Close Si1 (STBY BUS1 TO MFB1).
STANDARD: Candidate rotates Sl (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light SAT illuminates.
UNSAT COMMENTS:
CRO-602 c -
Page 11 of 14 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR).
STANDARD: Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white SAT open light illuminates.
UNSAT COMMENTS:
STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2).
STANDARD: Candidate rotates S21 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light SAT ilium mates.
UN SAT COMMENTS:
STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in AUTO.
STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to SAT AUTO.
UNSAT COMMENTS:
CRO-602 c-Page 12 of 14 STEP 23: Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in AUTO.
STANDARD: Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to SAT AUTO.
UNSAT COMMENTS: Examiner Cue: Another operator will continue with this procedure.
END TASK STOP TIME:
CRO-602 c -
Page 13 of 14 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 2 Step is required to energize the STBY Bus.
3 Step is required to energize the STBY Bus.
4 Step is required to energize the STBY Bus.
8 Step is required to energize the STBY Bus.
9 Step is required to energize the STBY Bus.
10 Step is required to energize the STBY Bus.
14 Step is required to energize the MFB from the STBY Bus.
15 Step is required to energize the MFB from the STBY Bus.
18 Step is required to energize the MFB from the STBY Bus.
19 Step is required to energize the MFB from the STBY Bus.
20 Step is required to energize the MFB from the STBY Bus.
21 Step is required to energize the MFB from the STBY Bus.
C CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Oconee Unit 1 is in MODE 5.
- KHU-2 has been started by the Keowee operator.
- It is desired to energize the MFB from CT 4
- OP/O/A!1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES:
The Control Room SRO directs you to continue with OPIOIA!1 106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4 and energize Unit ones Main Feeder Buses.
CR0-ill -d Page 1 of 10 REGION N INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-ill Withdrawal of Safety Rod Group 1 to 50%
CAN DI DATE EXAMINER
CR0-ill -d Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Withdrawal of Safety Rod Group 1 to 50%
Alternate Path:
Yes Facility JPM #:
CR0-ill K/A Rating(s):
System: 001 K/A: G2.2.2 Rating: 4.6/4.1 Task Standard:
Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
OP/1/N1105/019 (Rev 023) (Control Rod Drive System) End. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 12 mm. Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: I NAME SIGNATURE DATE Comments
CR0-ill -d Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS
- 1. RECALL Snap 206
- 2. IMPORT CR0-i ii Simulator files
- 3. GoTo RUN
- 4. Select SRJWR on NI recorder
CR0-ill -d Page 4 of 10 Tools/Equipment/Procedures Needed OP/i/A11105/019 (Control Rod Drive System) End. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/i/Ni 102/001 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
o Perform an Automatic Latch of Group 1 Control Rods
- Withdraw CRD Group ito 50% per OP/i/Ni 105/019 (Control Rod Drive System)
Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
CR0-ill -d Page 5 of 10 START TIME:
STEP 1: Step3.l Perform the following: (R.M.)
- Ensure RUN is ON.
- Ensure SINGLE SELECT SWITCH to ALL.
STANDARD: Determine control rod speed switch is selected to RUN by observing light SAT indication on the Diamond.
Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond.
COMMENTS: UNSAT STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:
- Appropriate ranged NIs
- Startup Rate STANDARD: As CRDs are withdrawn monitor the above indications.
U NSAT COMMENTS:
CR0-ill -d Page 6 of 10 STEP 3: Step 3.3 *CRITICAL STEP Perform Latch and P1 alignment of Group 1, as follows: (R.M.)
3.3.1 Ensure GROUP SELECT SWITCH to 1.
3.3.2 Verify only Group 1 CONTROL ON lights are ON. (P1 panel) {9}
3.3.3 If Manual Latch and P1 Alignment is desired, perform the following:
(Per initiating cue, Manual is NOT desired)
NOTE: When LATCH AUTO is selected, the following automatically occurs:
- Group/Rod inserts to latch rods (CRD TRAVEL In light ON)
- Group/Rod withdraws to test for latching (CRD TRAVEL Out light ON)
- Group/Rod inserts (CRD TRAVEL In light ON)
- RPI resets.
- Group In Limit light on Diamond will momentarily extinguish then illuminate.
3.3.4 If Auto Latch and P1 Alignment desired, perform the following:
SAT A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:
Verify LATCH AUTO is OFF.
Verify Group 1 0% lights are ON. (P1 Panel)
Verify Group 1 API/RPI indications agree. (P1 Panel)
- Rotate GROUP SELECT SWITCH to 1. UNSAT STANDARD:
Determine that only Group 1 CONTROL ON lights are ON on the P1 panel.
- Depress the LATCH AUTO pushbutton.
WHEN Auto Latch is complete:
- Verify LATCH AUTO is OFF.
a Verify Group 1 0% lights are ON. (P1 Panel)
- Verify Group 1 API/RPI indications agree using the position switch on the P1 Panel.
COMMENTS:
STEP 4: Step 3.4 Select FAULT RESET SAT STANDARD: Depress FAULT RESET pushbutton on the diamond panel.
COMMENTS:
UNSAT
CR0-ill -d Page 7 of 10 STEP 5: Step 3.5 *CRITICAL STEP Select Group 1, as follows: (R.M.)
> Ensure GROUP SELECT SWITCH to 1.
> Ensure only Group 1 CONTROL ON lights are ON. (P1 panel)
> Ensure Group 1 at 50%. (R.M.) SAT Place GROUP SELECT SWITCH to OFF.
STANDARD: Ensure GROUP SELECT SWITCH to 1.
Determine that only Group 1 CONTROL ON lights are ON on the P1 panel.
UNSAT
- Begin withdrawing Group 1 Control Rods to 50%
Manually Trip the Rx when two or more CRDM stator temperatures are 180°F lAW OMP 1-18 Attachment A (Licensed Operator Memory Items)
ALTERNATE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.
COMMENTS:
CR0-ill -d Page 8 of 10 ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to CRITICAL STEP increase.
STEP 6: Manually Trip the Rx when two or more CRDM stator temperatures are 1 80F lAW OMP 1-18 Attachment A (Licensed Operator Memory Items)
STANDARD: Candidate Manually Trip the Rx when two or more CRDM stator temperatures are 180F lAW OMP 1-18 Attachment A (Licensed SAT Operator Memory Items)
EXAMINER NOTE: At 10% withdrawn, CRD stator temperatures will begin to increase. At 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 180f, Trip the Rx. The UNSAT Critical Task is satisfied if the Reactor is manually tripped before Group 1 Control Rods reach 50% withdrawn and the candidate decides the task is completed.
COMMENTS:
ENDOFTASK TIME STOP:
CR0-ill -d Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 This step is required to withdraw group 1 control rods.
5 This step is required to withdraw group 1 control rods.
6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/O01 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
- Perform an Automatic Latch of Group 1 Control Rods
- Withdraw CAD Group 1 to 50% per OP/i/Ni 105/019 (Control Rod Drive System)
Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
CRO-225 e -
Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE C RO225 Align letdown with 1HP-14 failed in Bleed CAN DI DATE EXAMINER
CRO-225 e Page2of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Align letdown with 1HP-14 failed in Bleed Alternate Path:
No Facility JPM #:
CRO-225 K/A Rating(s):
System: 002 K/A: A2.01 Rating: 4.3/4.4 Task Standard:
Students align letdown with 1HP-14 failed in the Bleed position lAW AP/2 Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
AP/1/A11700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A11800/001 (Rev 039) Enclosure 5.5, PZR and LDST Level Control.
Validation Time: 14 mm. Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner:
NAME SIGNATURE DATE Comments
CRO225 e -
Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS
- 1. RECALL Snap 207
- 2. IMPORT CRO-225 Simulator files
- 3. WHEN directed by Lead Examiner, Go To RUN
CRO-225 e Page4of 11 Tools/Equipment/Procedures Needed
- EP/1/A11800/OO1 Enclosure 5.5 (PZR and LDST Level Control)
- AP/1/A11700/002 (Excessive RCS Leakage)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be perlormed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS
- Reactor Power is 100%
- AP/11A11700/002 is in progress due to 1 HP-14 failing in the BLEED position.
INITIATING CUE The CRSRO directs you to continue with AP/1 IA/i 700/002 (Excessive RCS Leakage) beginning at step 4.155.
CRO-225 e Page5of 11 START TIME:
STEP 1: Step 4.155 Verify 1A LD Filter in service.
STANDARD: Student observes lB Letdown (LD) Filter is in service and the 1A LD SAT Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO.
COMMENTS:
U NSAT STEP 2: Step 4.155 RNO CRITICAL STEP
- 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/A)
- 2. Open 1HP-17 STANDARD: Student recognizes that 1A LD Filter is Available.
- Student opens 1HP-17.
SAT COMMENTS:
UNSAT STEP 3: Step 4.156 Close 1HP-6 STANDARD: Student closes 1HP-6 SAT COMMENTS:
UNSAT
CRO-225 e -
Page 6 of 11 NOTE TS 3.4.9 applies when indicated PZR Level > 260 (corrected value for 285)
STEP 4: Step 4.157 Adjust 1HP-7, as needed, to control: SAT
- BLEED flow out of failed 1HP-14
- Pzr level STANDARD: Student adjusts 1 HP-7 as necessary to control PZR level.
UNSAT COMMENTS:
STEP 5: Step 4.158 CRITICAL STEP Dispatch an operator to open 1 HP-i 96 STANDARD: Student dispatches an AO to open 1HP-i96 SAT BOOTH CUE: Open 1HP-196 with Manual Valves COMMENTS:
UNSAT
CRO-225 e -
Page 7 of 11 STEP 6: Step 4.159 Verify CC System in Operation.
SAT STANDARD: Student observes:
- At least one CC pump in operation
- CC return flow is > 575 gpm COMMENTS: UNSAT STEP 7: Step 4.160 Position the standby HPI pump switch to OFF.
SAT STANDARD: Student places the standby (1B) HPIP switch to OFF COMMENTS:
UNSAT STEP 8: Step 4.161 Initiate monitoring RCP parameters.
SAT STANDARD: Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.
Booth Cue: Notify the student that 1HP-196 is open.
UNSAT COMMENTS:
CRO-225 e-Page8of 11 STEP 9: Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW. SAT STANDARD: Student throttles 1HP-31 to establish 12-15 gpm.
COMMENTS:
U NSAT STEP 10: Step 4.163 CRITICAL STEP When 1HP-196 is open, THEN close 1CS-26.
SAT STANDARD: Student closes 1CS-26.
COMMENTS:
UNSAT STEP11: Step4.164 Close the following;
U NSAT COMMENTS:
STEP 12: Step 4.165 CRITICAL STEP Open 1 HP-6 SAT STANDARD: Student opens 1HP-6.
COMMENTS:
UNSAT
CRO-225 e -
Page 9 of 11 STEP 13: Step 4.166 Throttle 1 HP-31 to establish 32 gpm SEAL INLET HDR FLOW.
SAT STANDARD: Student throttles open 1 HP-31 to establish 32 gpm SEAL INLET HDR FLOW.
COMMENTS:
UNSAT STEP 14: Step 4.167 Adjust 1HP-7 to establish desired letdown flow. SAT STANDARD: Student throttles open 1 HP-7 to establish 75 gpm letdown flow.
COMMENTS:
U NSAT STEP 15: Step 4.168 CRITICAL TASK Position the standby HPI pump switch to AUTO SAT STANDARD: Student places the standby (1 B) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.
COMM ENTS: UNSAT END TASK TIME STOP:
CRO-225 e -
Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 1 HP-i 7 must be opened to align the alternate letdown flow path.
5 1 HP-i 96 must be open for the alternate letdown flow path.
10 1CS-26 is closed to isolate the flow path going to the BHUTs.
12 Required for letdown flow to be returned to normal 15 The standby HPIP (iB) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
- Reactor Power is 100%
- AP/1 IA/i 700/002 is in progress due to 1 HP-14 failing in the BLEED position.
INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
CRO-408a f-Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-408a START FOURTH REACTOR COOLANT PUMP CAN DI DATE:
EXAMINER:
CRO-408a f -
Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Start the fourth RCP Alternate Path:
Yes Facility JPM #:
CRO-038a K/A Rating(s):
System: 003 K/A: A4.06 Rating: 2.9*/2.9 Task Standard:
1 B2 RCP is started in accordance with OP/i/A/l 103/006 End. 4.4 (Starting 1 B2 RCP) and then secured per AP/i 6 due to high vibration Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
OP/i/Ni 102/001 (Controlling Procedure for Unit Startup)
OP/i/Ni 103/006 End. 4.4 (Starting 1 B2 RCP)
AP/i/A/i700/0i6 (Abnormal Reactor Coolant Pump Operation)
ARG 1 SA-2 / E-2 (RC Pump Vibrations Emergency High)
Validation Time: 15 minutes Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
NAME SIGNATURE DATE COMMENTS
CRO-408a f-Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS
- 1. Recall Snap2lO
- 2. Import files for CRO-408a
- 3. Ensure all breaker flags are set to current plant conditions
- 4. When directed by lead examiner, Go to Run.
CRO-408a -
Page 4 of 11 Tools/Equipment/Procedures Needed:
OP/i/Ni 102/001 (Controlling Procedure for Unit Startup)
OP/11A11103/006 End. 4.4 (Starting 1B2 RCP)
ARG 1 SA-2 I D-2 (RC Pump Vibration High)
ARG 1 SA-2 I E-2 (RC Pump Vibration Emergency High)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS OPI1/A111021001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature = 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 1 B2 RCP per OP/i/Ni 103/006 End. 4.4 beginning with step 2.1.
CRO-408a f-Page 5 of 11 START TIME:
NOTE:
No more than two RCP(s) may be operated when RCS is < 250 °F.
SAT AC and DC Oil Lift Pumps will automatically trip after 3 minutes. Oil Lift Pump may NOT start unless switch has been placed to OFF after last start.
UNSAT STEP1: Step2.1.1 Announce Starting 1 B2 RCP via plant page.
STANDARD: Announces Starting 1 B2 RCP using the plant page system.
COMMENTS:
STEP 2: Step 2.1 .2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6 SAT STANDARD: Reads IAAT step and determines it does not currently apply COMMENTS: UNSAT
CRO-408a f Page6of 11 EiTE: AC Oil Lift Pump may take > 2 minutes to develop adequate discharge pressure. *CRITICAL STEP STEP 3: Step 2.1 .3 IF available, start AC Oil Lift Pump on 1 B2 RCP.
STANDARD: Determines AC Oil Lift Pump is available and:
- *Rotates AC Oil Lift Pump switch to start
- Observes red light on and green light off SAT
- Monitors discharge pressure status on OAC
- Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6 UNSAT COMMENTS:
STEP 4: Step 2.1.6 *CRITICAL STEP WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1 B2 RCP.
STANDARD: Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1 B2 RCP as follows:
- *Rotate 1B2 RCP switch to START
- Verify red lights on and green light off SAT
- Verify starting current
- Verify OAC indications support pump start UN SAT COMMENTS:
CRO-408a f Page7of 11 STEP 5: Step 2.1.7 After RCP is at full speed, perform the following:
A. Ensure the following stopped
- AC Oil Lift Pump
- DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to OFF C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to SAT OFF UNSAT STANDARD: Once 1B2 RCP is at rated speed,
- Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1SA-9/D-2 (RC Pump Vibration High) and 1SA-2/
E-2 (RC Pump Vibration Emergency High) will alarm 3O sec after starting 1B2 RCP.
COMMENTS:
STEP 6: 1SA-91 D-2 (RC Pump Vibration High) 1 SA-9 I E-2 (RC Pump Vibration Emergency High)
Step 3.1 Use one of the following means to verify RCP vibration conditions:
- IF the OAC is unavailable, verify the alarm by referring to RCP SAT Vibration Monitoring Chart Recorder.
STANDARD: Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. UNSAT EXAMINER NOTE: The Candidate may refer to either 1SA-9/D-2 (High Vibration) or 1SA-9/E-2 (Emergency High Vibration). ARG guidance is similar in either case.
COMMENTS:
CRO-408a -
Page8of 11 STEP 7: 1SA-9 / D-2 (RC Pump Vibration High)
Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies:
SAT STANDARD: Candidate determines that 1 B1 RCP vibrations are not increasing and Step 3.2 does not apply.
Candidate continues to Step 3.3. UNSAT EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm. (1SA-9/E-2)
COMMENTS:
STEP 8: 1SA-9 / D-2 (RC Pump Vibration High)
Step 3.3 1 SA-9 I E-2 (RC Pump Vibration Emergency High)
Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
SAT STANDARD: Candidate initiates AP/1/A11700/016 for High Vibration on 1 B2 RCP.
EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating UNSAT AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16.
COMMENTS:
CRO-408a -
Page 9 of 11 STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of End 5.1 (RCP Immediate Trip Criteria),
THEN perform Steps 4.2 4.11.
SAT STANDARD: Candidate refers to AP/16 Enclosure 5.1 and determines that 1B2 RCP meets Immediate Trip Criteria due to High Vibrations.
COMMENTS: UNSAT STEP 10: Step4.2 Verify MODE 1 p12 STANDARD: Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. SAT COMMENTS:
UNSAT STEP 11: Step 4.2 RNO CRITICAL STEP Stop the affected RCP.
STANDARD: Candidate stops the 1B2 RCP.
SAT EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS: UNSAT END TASK STOP TIME:
CRO-408a -
Page lOof 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Required to start the 1 B2 RCP 4 Required to start the 1 B2 RCP 11 Required to stop 1B2 RCP
f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS OP/1/A11102/OO1 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature = 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 1 B2 RCP per OP/i/A/l 103/006 End. 4.4 beginning with step 2.1.
CRO-508 g-Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 PUMP THE QUENCH TANK CANDIDATE EXAMINER
CRO-508 g-Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Pump the Quench Tank Alternate Path:
No Facility JPM #:
CRO-508 K/A Rating(s):
System: 007 K/A: Ai.0i Rating: 2.9/3.1 Task Standard:
Utilize OP/i/A/i 104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
Validation Time: 10 minutes Time Critical: NO Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner:
NAME SIGNATURE DATE COMMENTS
CRO-508 g -
Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS
- 1. RECALL Snap 211
- 2. Place TIC sheet tags on QT Drain Pump and Component Drain Pump.
- 3. Update Boron Status board to show last 1A BHUT boron sample as being > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old.
- 4. Provide a copy of OPI1/A11 1041017 End 4.1 with the following:
- Limits & Precautions
- Steps 1 .1 through 1 .4 signed off.
- 5. Goto RUN
CRO-508 g-Page 4 of 9 Tools/Equipment/Procedures Needed:
- OP/i /A/1104/017 Limits & Precautions
- OP/l/A!1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS
- Unit 1 is Shutdown
- Unit 1 Quench Tank level is 86
- Quench Tank is aligned to 1A BHUT
. Enclosure 4.1 of OP/i/All 104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of .1 of OP/i fAll 104/017.
Secure pumping the Quench Tank at 75
CRO-508 g-Page 5 of 9 START TIME:
STEP 1: Step 2.1 CRITICAL STEP Ensure open:
1CS-5 (COMPONENT DRN PUMP SUCTION) 1CS-6 (COMPONENT DRN PUMP SUCTION)
SAT STANDARD: Candidate ensures 1 CS-5 and 1 CS-6 are open by taking the control switches located on 1 AB1 to the open position and verifying red open light illuminated and green closed light OFF.
UNSAT Candidate continues to Step 2.2.
COMMENTS:
STEP 2: Step 2.2 IF QT level will be maintained in normal operating band:
2.2.1 IF desired, start COMPONENT DRAIN PUMP.
2.2.2 IF desired, start QUENCH TANK DRAIN PUMP.
STANDARD: Candidate recognizes from the Initial Conditions that this step is N/A and SAT moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is 80-1 00 when RCS UNSAT pressure > 45 psig per L&P 2.4 of OP/1/A11104/017.
COMMENTS:
STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:
_2.3.1 Ensure RCS pressure < 45 psig.
SAT STANDARD: Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig.
Candidate continues to Step 2.3.2.
UNSAT COMMENTS:
CRO-508 g-Page 6 of 9 CRITICAL STEP STEP 4: Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD: *Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.
EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the SAT pump at 80 EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to UNSAT complete the task The candidates instructions were to use both.
COMMENTS:
CRITICAL STEP STEP 5: Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD: *Candidate places the QUENCH TANK DRAIN PUMP switch in the SAT BYPASS position.
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The UNSAT candidates instructions were to use both.
EXAMINER NOTE: Expect 1SA-6/A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank.
COMMENTS:
STEP 6: Step 2.3.4 CRITICAL STEP At desired level (75), perform the following:
- Ensure stopped COMPONENT DRAIN PUMP
- Ensure stopped QUENCH TANK DRAIN PUMP SAT STANDARD: Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP.
COMMENTS: UNSAT
CRO-508 g-Page 7 of 9 STEP 7: *CRITICAL STEP Step 2.4.
Perform the following:
- Close 1CS-5 (COMPONENT DAN PUMP SUCTION)
- Close 1CS-6 (COMPONENT DAN PUMP SUCTION)
SAT STANDARD: Candidate closes 1CS-5 and 1CS-6 by placing each control switch in the closed position. The green closed light illuminates and the red open light extinguishes.
UNSAT
STEP 8: Step 2.5.
IF 1A BHUT boron sample > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old AND QT pumped to 1A BHUT, perform the following:
- 2.5.1 Verify closed 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE).
_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084) 2.5.3 Start 1A BLEED TRANSFER PUMP.
BOOTH CUE: When called report as NEO: I am standing by to read 1A Bleed Transfer Pump discharge pressure at (1CS-PG-0084).
SAT STANDARD: Candidate verifies 1CS-46 (1A AC BLEED XFEA PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off.
Candidate dispatches NEO to observe 1A Bleed Transfer Pump UNSAT discharge pressure.(1 CS-PG-0084)
Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off.
EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.
COMMENTS:
END OF TASK STOP TIME:
CRO-508 g-Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Step required to align the flow path from the QT to 1A BHUT 4 This step is required to begin the level decrease in the Quench Tank.
5 This step is required to begin the level decrease in the Quench Tank.
6 This step stops the QT Drain Pump and the Component Drain Pump when the QT is 75 inches 7 This step isolates the flow path from the QT to 1A BHUT
g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is 86 Quench Tank is aligned to 1A BHUT .1 of OP/i/All 104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of Enclosure 4.1 of OP/i/All 104/01 7.
Secure pumping the Quench Tank at 75
CRO-801 b h-Page 1 of 17 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-801 b ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CAN DI DATE EXAMINER
CRO-801 b h-Page 2 of 17 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path:
Yes Facility JPM #:
CRO-801 K/A Rating(s):
System: 075 K/A: A2.01 Rating: 30*/3.2 Task Standard:
CCW Intake Canal is aligned for recirc Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X In-Plant Perform X Simulate
References:
API1IA/1700/13 (CCW Dam Failure)
Validation Time: 15 mm. Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: I NAME SIGNATURE DATE Comments
CRO-801b h -
Page 3 of 17 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. Recallsnap2l4
- 2. Import simulator files for CRO-801
- 3. Ensure all breaker flags (especially COW pumps) are set to current plant conditions.
- 4. Go to RUN as directed by examiner
- 5. When asked to dispatch an operator to close the breaker for 1 COW-i 2 (at step 17)
Fire Timer #1 and inform student that using time compression the breaker is closed.
CRO-801b h -
Page 4 of 17 Tools/Equipment/Procedures Needed:
AP/1 IA/i 700/013 (Dam Failure)
READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Security reports that a failure of the Newry Dam has occurred.
- The CCW Intake Canal is intact
- Subsequent Actions of AP/1IA/17001013 (Dam Failure) have been completed up to step 4.4.
INITIATING CUE:
The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1 700/013.
CRO-801 b h-Page 5 of 17 START TIME:
STEP 1: Step 4.4 CRITICAL STEP Depress the CCW DAM FAILURE pushbutton.
STANDARD: The CCW DAM FAILURE pushbutton is located by the student SAT on 1AB3 and depressed.
COMMENTS:
UNSAT STEP 2: Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms.
SAT STANDARD: An individual is dispatched to report damage to the Control Rooms.
Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam UNSAT COMMENTS:
STEP 3: Step 4.6 GO TO step 4.49 SAT STANDARD: Student goes to step 4.49 COMMENTS: UNSAT
CRO-801b h -
Page 6 of 17
STEP 4: Step 4.49
- Stop an RCPs SAT Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored UNSAT STANDARD: *The control switches for RCPs 1 Al, 1 A2, 1 Bl and 1 B2 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.
CR SRO notified of RCP status COMMENTS:
STEP 5: Step 4.50 Stop all CCW pumps.
STANDARD: 1 A, 1 B, 1 C, and 1 D CCW Pump switches are located by the SAT student on 1 AB3.
Student ensures all CCW pump Red ON lights are extinguished and White OFF lights are illuminated.
COMMENTS: UNSAT
CRO-801b h -
Page 7 of 17 STEP 6: Step 4.51 Open 100W-1-6 (WATERBOX EMER DISCH VALVES).
STANDARD: Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control SAT and indication on 1AB3 and ensures red OPEN indication is illuminated and green CLOSED indication is extinguished.
COMMENTS:
UNSAT
CRO-801b h -
Page 8 of 17 NOTE Switches for waterbox discharge valves are located at T-3/D1 8, D20, D22 on catwalk on east side of the condenser.
STEP 7: Step 4.52 Verify aH condenser outlet valves indicate closed using the OAC (GD AP13):
1 CCW-20 (Condenser 1A1 Outlet) (01D0273) 1 CCW-21 (Condenser 1A2 Outlet) (O1D0275) SAT 1 CCW-22 (Condenser 1 B1 Outlet) (01 D0277) 1 CCW-23 (Condenser 1 B2 Outlet) (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) (O1D0281) 1 CCW-25 (Condenser 1C2 Outlet) (O1D0283) UNSAT STANDARD: The student monitors the Operator Aid Computer to verify the following:
1 CCW-20 (Condenser 1A1 Outlet) closed (01D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 1 B1 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 1 B2 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1 C2 Outlet) closed (01 D0283)
COMMENTS:
CRO-801b h -
Page 9 of 17 STEP 8: Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.
- 1CCW-25 STANDARD: An operator is dispatched to place the condenser outlet valves in UNSAT HAND.
Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND.
COMMENTS:
NOTE CCW-8 should open after the CCW DAM FAILURE pushbutton is pressed and the first Waterbox Emergency Discharge valve (1 COW-i 6) opens. If CCW-8 SAT does not open, it should be left closed in preparation for CCW recirculation. I ALTERNATE PATH STEP 9: Step 4.54 Verify CCW-8 is open.
UNSAT STANDARD: CCW-8 switch and indication is located by the student on 2AB3 and the valve is determined to be CLOSED. Candidate proceeds to Step 4.54 RNO COMMENTS:
CRO-801b h -
Page 10 of 17 STEP 10: Step 4.54 RNO IF emergency COW siphon flow has NOT been established on Unit 1, THEN notify Unit 2 that emergency CCW siphon flow has NOT SAT been established on Unit 1..
STANDARD: Unit 2 Control Room is notified that siphon flow has NOT been established on Unit 1.
UNSAT Examiner/Booth Cue: When candidate contacts Unit 2 acknowledge the notification that CCW siphon flow has NOT been established on Unit 1.
COMMENTS:
STEP 11: Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).
SAT STANDARD: Operator(s) are dispatched to perform Enclosure 5.2.
Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2 UNSAT COMMENTS:
CRO-801 b h-Page 11 of 17 NOTE Unit 2 CR will decide which unit will establish CCW recirculation. Unit 1 will only supply CCW recirculation when directed by Unit 2.
STEP 12: Step 4.57 SAT IAAT Unit 2 CR has directed Unit 1 to supply COW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.
UNSAT STANDARD: Student continues to step 4.58.
Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.
COMMENTS:
NOTE At least one CCW Pump discharge valve is required to remain open prior to establishing forced flow. SAT The adjacent COW Pumps discharge valve must be closed to prevent excessive torque on the starting pumps discharge valve. The 1 A and 1 B COW Pumps are adjacent, and the 1 C and 1 D COW Pumps are adjacent.
UNSAT STEP 13: Step 4.58 Determine which CCW Pump will be started.
STANDARD: The student determines from the turnover that the 10 CCWP will be started COMMENTS:
CRO-801b h -
Page 12 of 17 STEP 14: Step 4.59 Place a COW Pump switches in the trip position.
SAT STANDARD: Student places all Unit 1 COW Pump switches in the tripped position.
COMMENTS:
UNSAT STEP 15: Step 4.60 Verify the 1A or 1 B CCW Pump is to be started.
SAT STANDARD: Student determines from initiating cue that the 10 CCW pump wilt be started and goes to the RNO column and therefore goes to step 4.63.
COMMENTS: UNSAT STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed.
1CCW-12 SAT 100W-13 STANDARD: The student notes that the discharge valve for the 10 COW pump (100W-12) is not closed and proceeds to the RNO.
UNSAT COMMENTS:
CRO-801b h -
Page 13 of 17 STEP 17: Step 4.63 RNO CRITICAL STEP Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed)
STANDARD: The student dispatches an operator to locally close 1CCW-12 from the breaker switch (1 XS3-2E). SAT BOOTH CUE: When an operator is dispatched, fire TIMER #1, then in form candidate that 1CCW-12 is closed COMMENTS: UNSAT CRITICAL STEP NOTE COW pump amps and temperatures will read higher than normal when started with this plant configuration. CCWP motor stator temperature limit is 284°F.
STEP 18: Step 4.64 SAT Start the selected CCW Pump.
STANDARD: *The student starts 1 C CCW pump by rotating the control switch to the CLOSE position. UNSAT 1 C CCW Pump will start only after its discharge valve has begun to travel open.
COMMENTS:
STEP 19: Step 4.65 Verify the started COW Pump Discharge valve opened.
SAT STANDARD: The discharge valve(1CCW-12) is verified OPEN COMMENTS:
UNSAT
CRO-801b h -
Page 14 of 17 STEP 20: Step 4.66 CRITICAL STEP Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP.
SAT STANDARD: The student positions the CCWP LOAD SHED DEFEAT switch in the IC COW Pump position COMMENTS: UNSAT STEP 21: Step 4.67 Verify CCW-9 opens.
STANDARD: The student locates CCW-9 switch and indication on 2AB3 SAT verifying red OPEN indication illuminated and green CLOSED indication extinguished.
COMMENTS:
UNSAT STEP 22: Step 4.68 Verify CCW-8 is closed.
STANDARD: CCW-8 switch and indication are located by the student on 2AB3 SAT verifying green CLOSED indication illuminated and red OPEN indication extinguished.
COMMENTS:
UNSAT
CRO-801 b h-Page 15 of 17 STEP 23: Step 4.69 Verify an operator has been dispatched to open 1 DP-F5C (CCW-8 BKR (EM ERG COW DISCH TO TAILRACE)).
SAT STANDARD: An operator has not yet been dispatched so the student proceeds to the RNO.
COMMENTS:
UNSAT STEP 24: Step 4.69 RNO Dispatch an operator to open 1 DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).
SAT STANDARD: Operator dispatched.
Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8 UNSAT Examiner Cue: Another operator will continue with this procedure COMMENTS:
END TASK TIME STOP:
CRO-801b h -
Page 16 of 17 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is critical because depressing this pushbutton trips all operating COW Pumps and sets up system logic for CCW recirculation flow.
4 This step is critical because RCPs must be stopped to reduce primary heat load.
17 This step is critical because it is necessary to establish recirculation flow.
18 This step is critical because it is necessary to establish recirculation flow.
20 This step is critical to protect the plant during a subsequent loop.
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Security reports that a failure of the Newry Dam has occurred.
The CCW Intake Canal is intact Subsequent Actions of AP/1/A11700/013 (Dam Failure) have been completed up to step 4.4.
INITIATING CUE:
The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A11700/013.
AO-710 i Page 1 of 12 REGION N INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE AO-710 Place the Reactor Building Hydrogen Analyzer In Service CAN DI DATE EXAMINER
AO-710 i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Place the 1A Reactor Building Hydrogen Analyzer In Service Alternate Path:
No Facility JPM #:
AO-010 K/A Rating(s):
System: 028 K/A: A4.03 Rating: 3.1/3.3 Task Standard:
Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant X Perform Simulate X
References:
EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, Placing RB Hydrogen Analyzers in Service Validation Time: 12 minutes Time Critical:Yes Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time Examiner: I NAME SIGNATURE DATE COMMENTS
AO-7101 Page3of 12 SIMULATOR OPERATOR INSTRUCTIONS None
AO-710 I Page 4 of 12 Tools/Equipment/Procedures Needed Enclosure 5.2, Placing RB Hydrogen Analyzers in Service Enclosure of EP/1/A11800!OO1 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS A LOCA has occurred on Unit 1.
Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.
The 1A and lB RB Hydrogen Analyzer Trains are aligned in the standby mode.
INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 Placing RB Hydrogen Analyzers in Service.
AO-710 Page 5 of 12 START TIME:
NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.
STEP 1: Step 1 At 1A H2 ANALYZER (RP), perform the following:
- Ensure POWER ON light is on.
- Position H2 DUAL RANGE SW to H2 0 -10% Range.
- Position FUNCTION SELECTOR switch to SAMPLE.
- Depress the OFF button for the following:
1 PR-83 (BYP TO POST AC 1 SV220) UNSAT 1 PR-86 (BYP TO POST AC 1 SV221)
STANDARD: Red Power On light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train A).
Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the 0-10% scale.
Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the SAMPLE position.
Cue: Indication is as you see it At the remote panel, the OFF button is pushed for the following valves:
Train A
- PR-83 (Bypass to Post Accident Sample Panel)
- PR-86 (Bypass from Post Accident Sample Panel)
Cue: OFF button is depressed and indications are as you see them COMMENTS:
AO-710 i Page 6 of 12 NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col Q73 West.
STEP 2: Step 2 At 1 B H2 ANALYZER (RP), perform the following:
- Ensure POWER ON light is on.
- Position H2 DUAL RANGE SW to H2 0 -10% Range.
- Position FUNCTION SELECTOR switch to SAMPLE.
- Depress the OFF button for the following:
1 PR-89 (BYP TO POST AC 1 SV220) UNSAT 1 PR-92 (BYP TO POST AC 1 SV221)
STANDARD: Red Power On light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train B).
Cue: indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the 0-10% scale.
Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the SAMPLE position.
Cue: Indication is as you see it At the remote panel, the OFF button is pushed for the following valves:
Train A
- PR-89 (Bypass to Post Accident Sample Panel)
- PR-92 (Bypass from Post Accident Sample Panel)
Cue: OFF button is depressed and indications are as you see them COMMENTS:
AO-710 i Page 7 of 12 STEP 3: Step 3 Notify Control Room to perform thefollowing: CRITICAL STEP
- Open 1 PR-87 and 1 PR-90 STANDARD: Unit lControl Room personnel are notified to open 1PR-81, 1PR-84, 1 PR-87, and 1 PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.
Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON and green lights are off COMMENTS:
U N SAT
AO-710 i Page 8 of 12 CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.
It should return down scale to the correct reading in 3 minutes.
STEP 4: Step 4 At 1A H2 ANALYZER (RP), perform the following:
- Position OFF I STANDBY / ANALYZE switch to ANALYZE.
- Depress REMOTE SELECTOR pushbutton to ensure control is SAT from the Remote Panel.
STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:
UNSAT
- PR-71 (Top of Containment Sample) for Train A Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
- OFF/STANDBY/ANALYZE switch is positioned to the ANALYZE Mode.
Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
- REMOTE SELECTOR Pushbutton is depressed.
Cue: Pushbutton is depressed.
Cue: Inform candidate that using time compression approximately three minutes have elapsed Cue: If asked inform the candidate that the Hydrogen Concentration Meter indicating 0% hydrogen concentration Cue: If asked inform the candidate that the High alarm is extinguished and the Common alarm is still illuminated.
COMMENTS:
AO-710 I Page 9 of 12 CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.
It should return down scale to the correct reading in 3 minutes.
STEP 5: Step 5 At 1 B H2 ANALYZER (RP), perform the following:
- Position OFF / STANDBY / ANALYZE switch to ANALYZE.
- Depress REMOTE SELECTOR pushbutton to ensure control is SAT from the Remote Panel.
STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:
UNSAT
- PR-76 (Top of Containment Sample) for Train B Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
- OFF/STANDBY/ANALYZE switch is positioned to the ANALYZE Mode.
Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
- REMOTE SELECTOR Pushbutton is depressed.
Cue: Pushbutton is depressed.
Cue: Inform candidate that using time compression approximately three minutes have elapsed Cue: If asked inform the candidate that the Hydrogen Concentration Meter indicating 0% hydrogen concentration Cue: If asked inform the candidate that the High alarm is extinguished and the Common alarm is still illuminated.
COMMENTS:
AO-710 i Page 10 of 12 STEP 6: Step 6 CRITICAL STEP IAAT either RB Hydrogen Analyzer Train indicates <2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train.
1A RB Hydrogen Analyzer Train SAT 1 B RB Hydrogen Analyzer Train STANDARD: ALARM RESET Pushbutton is depressed for both trains.
UNSAT Cue: If the candidate asks, indicate that the Hydrogen reading is =0 percent on both trains.
Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.
COMMENTS:
STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1 B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1 A and 1 B Hydrogen Analyzer Train are in service.
SAT STANDARD: Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service.
Cue: Control room acknowledges Hydrogen Analyzers is in service. UNSAT COMMENTS:
STEP 6: Step 8 EXIT this enclosure.
STANDARD: Procedure is exited.
SAT COMMENTS:
U N SAT ENDTASK STOP TIME:
AO-710 I Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Opens the block valves to the 1 A and 1 B H2 analyzer.
4 Starts the Analyzer pump and the sampling process for the 1A H2 Analyzer 5 Starts the Analyzer pump and the sampling process for the 1 B H2 Analyzer 6 Required to enable Control Room to detect increase H2 concentration
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS A LOCA has occurred on Unit 1.
Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.
The 1A and lB RB Hydrogen Analyzer Trains are aligned in the standby mode.
INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 Placing RB Hydrogen Analyzers in Service.
CRO-805 I Page 1 of 13 REGION N INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE C RO8O5 OATC Actions for Control Room Evacuation CAN DI DATE EXAMINER
CRO-805 j Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Remove Control Power Fuses and Open Breakers as directed by AP/3/AI1 700/050(Challenging Plant Fire) Enclosure 5.5.(OATC Actions for Control Room Evacuation)
Alternate Path:
No Facility JPM #:
AO-805 K/A Rating(s):
System: BW/A06 K/A: AA1.1O Rating: 37*/39 Task Standard:
Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant _X Perform Simulate X
References:
AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(OATC Actions for Control Room Evacuation)
Validation Time: 25 minutes Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time Examiner:
NAME SIGNATURE DATE COMMENTS
CRO-8O5 j Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS None
CRO-805 j Page 4 of 13 Tools/Equipment/Procedures Needed AP/3/A11700/050(Challenging Plant Fire) Enclosure 5.5.(OATC Actions for Control Room Evacuation)
Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS
- A plant fire is in progress that requires evacuation of Unit 3 Control Room
- AP/3/A!1700/050(Challenging Plant Fire) is in progress
- Steps 1 through 9 of AP!3/A!1 700/050(Challenging Plant Fire) Enclosure 5.5.(OATC Actions for Control Room Evacuation) have been completed INITIATING CUES The Control Room SRO directs you to complete AP/3/A11700/050(Challenging Plant Fire) .5. (OATC Actions for Control Room Evacuation)
CRO-805 j Page 5 of 13 START TIME:
EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM.
STEP 1: Step 10 CRITICAL STEP Remove aB control power fuses from 3B HPI Pump at 3TE-9 (T-3/L45).
STANDARD: Candidate locates the 4160V breaker cabinet for the 3B HPI Pump and indicates that the upper compartment door would be opened _SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
STEP 2: Step 11 CRITICAL STEP Remove aM control power fuses from 3C HPI Pump at 3TD-9 (T-31L44).
STANDARD: Candidate locates the 41 60V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
CRO-805 j Page 6 of 13 STEP 3: Step 12 CRITICAL STEP Remove aB control power fuses from 3B RBS Pump at 3TD-1 1 (T-3/L44).
STANDARD: Candidate locates the 41 60V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them COMMENTS:
STEP 4: Step 13 CRITICAL STEP Remove aN control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).
STANDARD: Candidate locates the 41 60V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
GRO-805 j Page 7 of 13 STEP 5: Step 10 CRITICAL STEP Remove all control power fuses from 3A RBS Pump at 3TC-1 0 (T-31L43).
STANDARD: Candidate locates the 41 60V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
CRO-805 j Page 8 of 13 STEP 6: Step 15 *CRITICAL STEP Open the following breakers (U3 Equip Rm):
o 3XS5-F3B (3HP-940 Bkr) (LDST to RBES Train B)
STANDARD: Candidate locates the following breakers, acquires the appropriate UNSAT electrical safety PPE, and positions the handles to the OFF position:
Safety PPE requirements are in the Safe Work Practices Manual chapter 10 and the PPE itself is in various lockers located in the vicinity of the electrical equipment.
For 3LP-20 & 3LP-21 Flash suit and hood rated for at least 43 caUcm2 with hearing protection.
For 3HP-939 & 3HP-940 FR clothing rated for at leastl2 cal.cm2 w/ green Arc-X face shield or equivalent.
- *3XS5F3B (3HP-940 Bkr) (LDST to RBES Train B)
- *3X54F3B (3HP-939 Bkr) (LDST to RBES Train A)
Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM.
COMMENTS:
CRO-805 j Page 9 of 13 STEP 7: Step 16 CRITICAL STEP Remove all control power fuses from 3A2 RC PUMP breaker at 3TB-8 (U#3 6900v Switchgear House)
SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
STEP 8: Step 17 CRITICAL STEP Remove all control power fuses from 3B2 RC PUMP breaker at 3TB-9 (U#3 6900v Switchgear House)
SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3B2 RC Pump and indicates that the upper compartment door would be opened UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
CRO-805 j Page 10 of 13 STEP 9: Step 18 CRITICAL STEP Remove all control power fuses from 3A1 AC PUMP breaker at 3TA-3 (U#3 6900v Switchgear House)
SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A1 RC Pump and indicates that the upper compartment door would be opened UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
STEP 14: Step 19 CRITICAL STEP Remove all control power fuses from 3B1 RC PUMP breaker at 3TA-4 (U#3 6900v Switchgear House)
SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3B1 RC Pump and indicates that the upper compartment door would be opened UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment Examiner Cue: Fuses are where you placed them.
COMMENTS:
CRO-805 j Page 11 of 13 STEP 15: Step 20 Notify SRO in the SSF that Unit 3 End. 5.5 (OATC Actions for Control Room Evacuation) actions are completed. SAT STANDARD: Candidate indicates that he would make the notification indicated above. UNSAT Examiner Cue: Notification has been made COMMENTS:
STEP 15: Step 20 Report to the SM for further direction.
SAT STANDARD: Candidate indicates that he would report to the SM.
UNSAT Examiner Cue: The task is complete COMMENTS:
END TASK
CRO-805 j Page 12 of 13 CRITICAL STEP EXPLANATIONS STEP # Explanation All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS A pant fire is in progress that requires evacuation of Unit 3 Control Room
- API3IAI1700/050(Challenging Plant Fire) is in progress
- Steps 1 through 9 of AP/3/AI1 700/050(Challenging Plant Fire) Enclosure 5.5.(OATC Actions for Control Room Evacuation) have been completed INITIATING CUES The Control Room SRO directs you to complete AP/3/A11700/050(Challenging Plant Fire) .5.(OATC Actions for Control Room Evacuation)
AO-427 k Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE AO-427 Reset an Emergency Feedwater Pump Turbine CAN DI DATE EXAMINER
AO-427 k Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Reset the TDEFWP Alternate Path:
NO Facility JPM #:
AO-027 K/A Rating(s):
System: 061 K/A: A2.04 Rating: 3.4/3.8 Task Standard:
Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant X Perform Simulate X
References:
Rule 3 (Loss of Main or Emergency FDW)
EOP Enclosure 5.26 (Manual Start of TDEFDWP)
Validation Time: 8 mm. Time Critical: No Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
NAME SIGNATURE DATE Comments
AO-427 k Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE
AO-427 k Page 4 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)
READ TO OPERATOR DIRECTIONS TO CANDIDATE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.
A loss of all 4160V power has occurred.
Unit 2 TDEFDW Pump is tripped.
Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EDP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFDW Pump.
AO-427 k Page 5 of 10 START TIME:
STEP 1: Step 1 (Procedure is pre-staged at the TDEFDW Pump. Provide the candidate a copy once the pre-staged copy is located) SAT Verify TDEFDWP trip device tripped.
STANDARD: Candidate determines from the Initial Conditions that Unit 2 TDEFDW UNSAT Pump is tripped.
Cue: If the candidate asks for local indications for Unit 2 TDEFDW Pump being tripped, inform him/her that the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position.
COMMENTS:
STEP 2: Step 2 Notify CR0 to place TDEFDW Pump switch in PULL TO LOCK.
SAT STANDARD: Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TDEFDW Pump in PULL TO LOCK.
Cue: Indicate to candidate that Unit 2 TDEFDW Pump is in PULL TO LOCK. UNSAT COMMENTS:
STEP 3: Step 3 CRITICAL STEP Push reset lever toward turbine shaft until engaged:
STANDARD: Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. SAT Cue: Indicate to candidate that the reset lever is engaged.
COMMENTS: UNSAT STEP 4: Step 4 CRITICAL STEP Rotate spindle fully clockwise.
SAT STANDARD: Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop.
Cue: Indicate to candidate that the spindle is in its full clockwise position. UNSAT COMMENTS:
AO-427 k Page 6 of 10 STEP 5: Step 5 CRITICAL STEP Rotate spindle fully counter-clockwise.
SAT STANDARD: Candidate observes spring plate in its full up position.
Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.
U N SAT COMMENTS:
STEP 6: Step 6 Rotate spindle 1/4 turn clockwise.
SAT STANDARD: Candidate rotates spindle 14 turn clockwise.
Cue: Indicate to candidate that the spindle is 1/4 turn from full counterclockwise position. UNSAT COMMENTS:
STEP 7: Step 7 Notify CR0 to place TDEFDW Pump switch in RUN: SAT STANDARD: Candidate notifies Unit 2 CR0 by phone/radio to place Unit 2 TD EFDW pump switch in RUN:
UNSAT Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.
COMMENTS:
STEP 8: Step 8 SAT Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD: Candidate locates 2MS-93 and determines the valve is Open.
UNSAT Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible.
COMMENTS:
AO-427 k Page 7 of 10 STEP 9: Step 8 RNO GOTOStepli SAT STANDARD: Candidate goes to step 11.
UN SAT COMMENTS:
STEP 10: Step 11 Verify TDEFDW Pump running SAT STANDARD: Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.
UNSAT Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.
COMMENTS:
STEP 10: Step 12 EXIT this enclosure SAT STANDARD: Candidate exits the enclosure Cue: Indicate to candidate that this task is complete. UNSAT COMMENTS:
END TASK TIME STOP:
AO-427 k Page 8 of 10 INFORMATION ONLY To Beanngs Turtthe2.dsf From 01 rtr 6119/01 Tank
AO-427 k Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 This step is required to reset 2MS-94 4 This step is required to reset 2MS-94 5 This step is required to reset 2MS-94
k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.
A loss of all 4160V power has occurred.
Unit 2 TD EFDW Pump is tripped.
Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.