3F0315-01, Response to Request for Additional Information to Physical Security Plan, Security Training and Qualification Plan and Safeguards Contingency Plan, Revision 1

From kanterella
(Redirected from ML15076A031)
Jump to navigation Jump to search

Response to Request for Additional Information to Physical Security Plan, Security Training and Qualification Plan and Safeguards Contingency Plan, Revision 1
ML15076A031
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/12/2015
From: Hobbs T
Duke Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0315-01
Download: ML15076A031 (2)


Text

~rm

~DUKE ER(

FLORIDA March 1 3F0315-I OU.S.

Nuc Attn: Do Washing 0

Subject:

Referenc

Dear Sir:

3y, Crysta Crysta 15760V Cra Operating SAFEGUARDS INFORMATION 10 CFR

?, 2015 01

lear Regulatory Commission cument Control Desk ton, DC 20555-0001 Ii River Nuclear Plant N Power Line Street

~staI River, FL 34428 Dock~et 50-302 License No. DPR-72 50.54(p)

Physical feguards Jnit 3 -

an, and k067)

Plant 3 -

Changes

es

Crystal River Unit 3 - Response to Request for Additional Information to Security Plan, Security Training and Qualification Plan, and Sal Contingency Plan, Revision 1

1. CR-3 to NRC letter dated September 16, 2014, "Crystal River Physical Security Plan, Security Training and Qualification PI Safeguards Contingency Plan, Revision 1" (Accession No. ML14262,
2. NRC to CR-3 letter dated February 2, 2015, "Crystal River Nuclear F Request for Additional Information Regarding the 10 CFR 50.54(p) to the Security Plans" (Accession No. ML15026A416) r 0

0 In accordance with 10 CFR 50.54(p), Duke Energy Florida, Inc. (DEF) hereby submits the response to the Request for Additional Information (RAI) for the Crystal River Unit 3 (CR-3)

Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1.

In Reference 1, CR-3 submitted the Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1. In Reference 2, the NRC staff forwarded RAIs to CR-3 as it was determined that additional information was necessary in order to complete its review of the referenced September 16, 2014 submittal.

This letter includes three enclosures and twenty-five attachments which contain Safeguards Information as defined in 10 CFR 73.2. Enclosure 1 contains the Response to Request for Additional Information. Enclosure 2 contains a Summary Description of Changes. Enclosure 3 contains a copy of the DEF Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2.

No new regulatory commitments have been made in this letter.

SAFEGUARDS INFORMATION NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS ]

INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION, THIS COVER LETTER IS DECONTROLLED.

'p

§~oi I

.0 A

U. S. Nuclear Regulatory Commission Page 2 of 2 1

3F0315-01 0

SAFEGUARDS INFORMATION If you have any questions regarding this submittal, please contact Mr. Phil Rose, 'Lead I

Engineer, Nuclear Regulatory Affairs, at (352) 563-4883.

1 ninr lr*_l T erry Hobbv, General Manager, Decommissioning Crystal River Unit 3 TH/par 01

Enclosures:

OF

1. Response to Request for Additional Information [SAFEGUARDS INFORMATION]
2. Summary Description of Changes (on CD-ROM) [SAFEGUARDS INFORMATION]

0

3. Duke Energy Florida, Inc., Physical Security Plan, Security Training and Qualification Ad Plan, and Safeguards Contingency Plan, Revision 2 (on CD-ROM) [SAFEGUARDS INFORMATION]

Attachment:

Request for Additional Information Attachments (1 - 13 and 23 - 25 on CD-ROM /

14-22 hardcopy) [SAFEGUARDS INFORMATION]

xc:

Regional Administrator, Region I (with Enclosures and Attachments)

NRR Project Manager (Cover Letter only) 0 1