Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML15014A0782015-01-14014 January 2015 E-mail from J. Whited to D. Filchner Request for Information Insufficiencies SSES Cyber Security Amendment (TAC Nos. MF5358 and MF53590) Project stage: RAI ML15020A7392015-02-0303 February 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Changes to the Cyber Security Plan Implementation Schedule Project stage: Acceptance Review ML15050A2192015-02-19019 February 2015 Acceptance of Requested Licensing Action Changes to the Cyber Security Plan Implementation Schedule Project stage: Acceptance Review 2015-02-19
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML19234A1222019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for TSTF-535 ML19039A0892019-02-0808 February 2019 Acceptance of Requested Licensing Action License Amendment Request to Revise Emergency Service Water Piping Technical Specifications During Replacement ML19003A4752019-01-0303 January 2019 Acceptance Review Susquehanna Units 1 and 2 License Amendment Request for TSTF-501 ML17089A3132017-04-0505 April 2017 Acceptance of Requested Licensing Action License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (CAC Nos. MF9131 & MF9132) ML16263A3442016-09-23023 September 2016 Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: License Amendment Request to Address Secondary Containment Access Openings (CAC Nos. MF8214 and MF8215) ML16109A3362016-04-26026 April 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 to Allow Replacement of Unit 1 480 Volt Engineered Safeguard System Load Center Transformers ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15183A3452015-07-0202 July 2015 E-mail from Jwhited to Jjennings SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15050A2192015-02-19019 February 2015 Acceptance of Requested Licensing Action Changes to the Cyber Security Plan Implementation Schedule ML14350B3542014-12-16016 December 2014 E-mail from J. Whited to D. Filchner: Susquehanna Steam Electric Station Acceptance of License Amendment Request Implementation of TSTF-425 ML14330A2392014-11-26026 November 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Units 1 and 2 Acceptance of Requested Licensing Action Relief Request 4RR-01 ML14216A5562014-08-0404 August 2014 Acceptance of Requested Licensing Action Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML13127A2702013-05-0707 May 2013 Acceptance of Requested Licensing Action Relief Request 3RR-20 ML13018A4402013-01-18018 January 2013 Email Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re_ Low Pressure Safety Limit and Reference Changes (TAC Nos. MF0410 and MF0411) ML12291A4992012-10-19019 October 2012 Acceptance of Requested Licensing Action Change to Technical Specification Surveillance Requirement 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State. ML1112401992011-05-0404 May 2011 ME6036 & ME6037, Acceptance Review CLIIP LAR to Adopt TSTF- 514. Rev 3 ML1018807512010-07-0707 July 2010 Acceptance of Requested Licensing Action Susquehanna Units 1 and 2 Relief Request RR-02 (TAC No. ME4068 & ME4069) ML1007501422010-03-16016 March 2010 TAC ME3320, Acceptance Review Relief Request RR-07 on Test Frequency for Ms SRVs ML0935800172009-12-24024 December 2009 ME2629 & ME2888, Acceptance Review of Relief Requests RR-07 & RR-08 Extension of Testing Interval for Ms SRVs 2023-12-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2015 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1AND2-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CHANGES TO THE CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE (TAC NO. MF5357 AND MF5358)
Dear Mr. Rausch:
By letter dated December 2, 2014, 1 PPL Susquehanna, LLC (the licensee), requested a license amendment regarding the implementation schedule for the Susquehanna Steam Electric Station, Units 1 and 2 (SSES) Cyber Security Plan. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request (LAR). The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
By letter dated February 3, 2015, 2 the NRC staff identified several informational needs that were necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. By letter dated February 12, 2015, 3 you provided a supplement to your submittal.
The NRC staff has found the supplement responsive to the staff's cited information needs, and concludes that the application and supplemental information provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
1 Agencywide Documents Access and Management System Accession No. ML14336A239.
2 ADAMS Accession No. ML15020A739.
3 ADAMS Accession No. ML15044A053.
T. Rausch If you have any questions, please contact me at (301) 415-4090.
Sincerely,
~~~,14 Jeffrey A Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc: Distribution via Listserv
ML15050A219 OFFICE DORL/LPLl2/PM DORL/LPLl2/LA DORL/LPLl-2/BC DORL/LPLl-2/PM A Baxter DBroaddus NAME JWhited (w/ comments) (Jlamb for) JWhited DATE 02/19/15 02/18/15 02/19/15 02/19/15