ML14357A211
Text
ENCLOSURE2 Prairie Island Nuclear Generating Plant Unit 1 Piping and Instrumentation Diagrams NE-39790-3, REV.78 NF-39245-1, REV. 82 Transitional File Submittal EC 21790 for XH-1-7, REV. 90 Transitional File Submittal EC Transitional File Submittal EC XH-1-7, REV. 90 24180 for NF-39216-1, REV.
17584 (Affected Area shown 87 D-4) for NF-39245-2, REV. 8 NF-39216-1, REV. 87 Transitional File Submittal EC XH-1-29, REV. 78 17584 (Affected Area shown F-6) for NF-39245-2, REV. 80 NF-39216-2, REV. 80 NF-39245-2, REV. 80 XH-1-31, REV. 82 NF-39216-3, REV. 80 NF-39248, REV. 82 Transitional File Submittal EC 21790 for XH-1-38, REV. 80 NF-39216-4, REV. 78 NF-39251, REV. 78 XH-1-38, REV. 80 NF-39217-1, REV. 82 NF-39252, REV. 82 XH-1-39, REV. 80 Transitional File Submittal EC Transitional File Submittal EC Transitional File Submittal EC 12200 for NF-39218, REV.
24824 for NF-39255-1, REV.
24804 for XH-1-44, REV. 77 80 82 NF-39218, REV. 80 NF-39255-1, REV. 82 Transitional File Submittal EC 23491 for XH-1-44, REV. 77 NF-39222, REV. 83 NF-39602-1, REV. 81 XH-1-44, REV. 77 NF-39237, REV. 80 NF-39603-3, REV. 82 XH-1-45, REV. 80 NF-39238, REV. 80 NF-39774-1, REV. 80 Transitional File Submittal EC 21790 for XH-1-123, REV. 81 Transitional File Submittal EC NF-86172-1, REV. 78 XH-1-123, REV. 81 22499 for NF-39244, REV.
93 NF-39244, REV. 93 NF-86172-3, REV. 76 Transitional File Submittal EC NF-88740, REV. 80 17584 for NF-39245-1, REV.
82 43 pages follow
00-33-3 i
,1111A1 JCC-175-ý SK 03 -017
- 0013 -~
[K TO SV-37154 (NF-39245-2)
(F-6) i TO SV-37153 (NF-39245-2)
(F-6)
F-J.
.;'cC T-175-l1
'THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL DRAWING:
PARTIAL OF NF-39245-1
- 1.
THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP DRAWING NF-39245-1 REV. 80.
(AFFECTED AREA SHOWN F-5)
AM&
AUTOMATED ENGINEERING SERVICES CORP.
40 SHUMAN BLVD. SUITE 340. NAPERVILE. IL 60563
TRANSITIONAL FILE SUBMITTAL EC 12200 TOD-13ý-2 0
NF-39233 C-9 11/4-MS -
-MS-35 NF-39605-1 F-2 1-1
TRANSITIONAL FILE SUBMITTAL EC 17584
-N TO U-i cc PHWS NF-39245-1 A-lII TO U-2 P-CC PMPS W-3q246-1 A-11 THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL ORAINGA
- 1. THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP ORAVING NF-3q245-2 REV. 76.
AUTOMATED ENGINEERING SVCES CORP.
m
. SiN% 3fO. f*W+/-
I & mw
TRANSITIONAL FILE SUBMITTAL EC 17584 11 1 A 1
Vrnl L--
C-3-28
,j
-CC-9
- FROM U-I CCHX NF-3q245-1 SH-3 PARTIAL OF NF-39245-2 THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL DRAWINOi
- 1. THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP DRAWING NF-39245-2 REV. 7q,
(AFFECTED AREA SHOWN F-6) oI NEY1 Gý1 oacwroni~ Iam Amn to well, lum rOR cc lym It "AUTOMATED ENGINEERING SERVICES CORP.
40 SHUMM
- BLVD, SURf 40, M4KUALE, I. O0W65 m '*
I*
fIW~IIW'l*IP.LA f
'w"AlWff.myIIWT4 1 -,t wama
-U
The following 39 Drawings specifically reference If, 1.
Prairie Island Nuclear Generating Plant Unit Piping and Instrumentation Diagrams DOI to D39
ENCLOSURE2 Prairie Island Nuclear Generating Plant Unit 1 Piping and Instrumentation Diagrams NE-39790-3, REV.78 NF-39245-1, REV. 82 Transitional File Submittal EC 21790 for XH-1-7, REV. 90 Transitional File Submittal EC Transitional File Submittal EC XH-1-7, REV. 90 24180 for NF-39216-1, REV.
17584 (Affected Area shown 87 D-4) for NF-39245-2, REV. 8 NF-39216-1, REV. 87 Transitional File Submittal EC XH-1-29, REV. 78 17584 (Affected Area shown F-6) for NF-39245-2, REV. 80 NF-39216-2, REV. 80 NF-39245-2, REV. 80 XH-1-31, REV. 82 NF-39216-3, REV. 80 NF-39248, REV. 82 Transitional File Submittal EC 21790 for XH-1-38, REV. 80 NF-39216-4, REV. 78 NF-39251, REV. 78 XH-1-38, REV. 80 NF-39217-1, REV. 82 NF-39252, REV. 82 XH-1-39, REV. 80 Transitional File Submittal EC Transitional File Submittal EC Transitional File Submittal EC 12200 for NF-39218, REV.
24824 for NF-39255-1, REV.
24804 for XH-1-44, REV. 77 80 82 NF-39218, REV. 80 NF-39255-1, REV. 82 Transitional File Submittal EC 23491 for XH-1-44, REV. 77 NF-39222, REV. 83 NF-39602-1, REV. 81 XH-1-44, REV. 77 NF-39237, REV. 80 NF-39603-3, REV. 82 XH-1-45, REV. 80 NF-39238, REV. 80 NF-39774-1, REV. 80 Transitional File Submittal EC 21790 for XH-1-123, REV. 81 Transitional File Submittal EC NF-86172-1, REV. 78 XH-1-123, REV. 81 22499 for NF-39244, REV.
93 NF-39244, REV. 93 NF-86172-3, REV. 76 Transitional File Submittal EC NF-88740, REV. 80 17584 for NF-39245-1, REV.
82 43 pages follow
00-33-3 i
,1111A1 JCC-175-ý SK 03 -017
- 0013 -~
[K TO SV-37154 (NF-39245-2)
(F-6) i TO SV-37153 (NF-39245-2)
(F-6)
F-J.
.;'cC T-175-l1
'THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL DRAWING:
PARTIAL OF NF-39245-1
- 1.
THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP DRAWING NF-39245-1 REV. 80.
(AFFECTED AREA SHOWN F-5)
AM&
AUTOMATED ENGINEERING SERVICES CORP.
40 SHUMAN BLVD. SUITE 340. NAPERVILE. IL 60563
TRANSITIONAL FILE SUBMITTAL EC 12200 TOD-13ý-2 0
NF-39233 C-9 11/4-MS -
-MS-35 NF-39605-1 F-2 1-1
TRANSITIONAL FILE SUBMITTAL EC 17584
-N TO U-i cc PHWS NF-39245-1 A-lII TO U-2 P-CC PMPS W-3q246-1 A-11 THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL ORAINGA
- 1. THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP ORAVING NF-3q245-2 REV. 76.
AUTOMATED ENGINEERING SVCES CORP.
m
. SiN% 3fO. f*W+/-
I & mw
TRANSITIONAL FILE SUBMITTAL EC 17584 11 1 A 1
Vrnl L--
C-3-28
,j
-CC-9
- FROM U-I CCHX NF-3q245-1 SH-3 PARTIAL OF NF-39245-2 THE FOLLOWING NOTES ARE FOR INFORMATION ONLY NOT TO BE INCORPORATED IN THE FINAL DRAWINOi
- 1. THIS ENGINEERING CHANGE SKETCH CREATED FROM PINGP DRAWING NF-39245-2 REV. 7q,
(AFFECTED AREA SHOWN F-6) oI NEY1 Gý1 oacwroni~ Iam Amn to well, lum rOR cc lym It "AUTOMATED ENGINEERING SERVICES CORP.
40 SHUMM
- BLVD, SURf 40, M4KUALE, I. O0W65 m '*
I*
fIW~IIW'l*IP.LA f
'w"AlWff.myIIWT4 1 -,t wama
-U
The following 39 Drawings specifically reference If, 1.
Prairie Island Nuclear Generating Plant Unit Piping and Instrumentation Diagrams DOI to D39