&XcelEnergyo DEC 0 5 2014 L-PI-14-119 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Fifth Ten-Year Interval Inservice Testing Program Pursuant to the guidance of the American Society of Mechanical Engineers OM Code, 2004 Edition, 2006 Addenda, Code for Operation and Maintenance of Nuclear Power Plants, Section ISTA-3200(a), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby submits for NRC information the Fifth Ten-Year Interval Inservice Testing (IST) Program for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The PINGP fifth ten-year IST interval begins December 21, 2014.
The Fifth Ten-Year IST Program is Enclosure 1 to this letter. The supporting piping and instrumentation diagrams for Units 1 and 2 are provided as Enclosures 2 and 3 to this letter, respectively.
By letter dated April 9, 2014 (ML14099A283), NSPM submitted 10 CFR 50.55a requests associated with the fifth ten-year IST interval. Future 10 CFR 50.55a requests will be submitted as the need occurs.
If there are any questions or if additional information is needed, please contact Mr. Dale Vincent, P.E., at 651-267-1736.
1717 Wakonade Drive East e Welch, Minnesota 55089-9642 Telephone: 651.388.1121 0o4-77T
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Kevin Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (3) cc:
Administrator, Region III, USNRC Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC