ML14352A013

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Clarification Request from Technical Staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)
ML14352A013
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/17/2014
From: Hansher B
Omaha Public Power District
To: Andrea George
Plant Licensing Branch IV
References
TAC MF5143
Download: ML14352A013 (6)


Text

NRR-PMDAPEm Resource From: HANSHER, BILL R [bhansher@oppd.com]

Sent: Wednesday, December 17, 2014 7:51 AM To: George, Andrea; EDWARDS, MICHAEL L Cc: Lyon, Fred; MCMANIS, JOE L

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143) 1.

The relay 86B1X/SIAS is General Electric model HEA [12HEA61C242]

The relay 86A1X/SIAS is General Electric model HEA [12HEA61C242]

Response to Questions 2: [supporting evidence reference OP-ST-ESF-0002 word search]

The relay 86B1X/SIAS is not tested in OP-ST-ESF-0002.

The relay 86A1X/SIAS is not tested in OP-ST-ESF-0002.

The load shed relays used in OP-ST-ESF-0002 are Equipment Number Model number 94-A1/LS 12HFA151A2H 94-A2/LS 12HFA151A2H 94-A3/LS 12HFA151A2H 94-A4/LS 12HFA151A2H 94-A5/LS 12HFA151A2H 94-1/AI-100 CR120AD04041AA 94-2/AI-100 CR120AD04041AA 94-3/AI-100 CR120AD04041AA 94-4/AI-100 CR120AD04041AA 94-5/AI-100 12HFA51A42H 94-6/AI-100 12HFA51A42H 94-7/AI-100 12HFA51A42H 94-8/AI-100 12HFA51A42H 94-B1/LS 12HFA151A2H 94-B2/LS 12HFA151A2H 94-B3/LS 12HFA151A2H 94-B4/LS 12HFA151A2H 94-B5/LS 12HFA151A2H 1

From: George, Andrea [1]

Sent: Tuesday, December 16, 2014 8:23 AM To: EDWARDS, MICHAEL L Cc: Lyon, Fred; HANSHER, BILL R

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Good morning, Ill have to defer to Fred, as I dont have the current status of the subject amendment review. He should be back in the office tomorrow.

Thanks, Andrea From: EDWARDS, MICHAEL L [2]

Sent: Tuesday, December 16, 2014 8:51 AM To: George, Andrea Cc: Lyon, Fred; HANSHER, BILL R

Subject:

FW: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Good morning Annie, I got an out of office email from Fred in reply to my email below.

A couple weeks ago or so, Fred had indicated his goal was to have the amendment issued before Christmas week. Is that still a possibility?

Michael Edwards Nuclear Licensing Engineer Regulatory Assurance Department Omaha Public Power District 9610 Power Lane, Blair NE 68008 402-533-6929 medwards@oppd.com From: EDWARDS, MICHAEL L Sent: Tuesday, December 16, 2014 7:48 AM To: 'Lyon, Fred' Cc: HANSHER, BILL R

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Good morning Fred, Is everything on track for the amendment? Any more questions for us?

Awhile back, I believe you indicated your goal was to have the amendment issued before Christmas week. Is that still a possibility?

2

Michael Edwards Nuclear Licensing Engineer Regulatory Assurance Department Omaha Public Power District 9610 Power Lane, Blair NE 68008 402-533-6929 medwards@oppd.com From: Lyon, Fred [3]

Sent: Monday, December 15, 2014 10:35 AM To: EDWARDS, MICHAEL L Cc: HANSHER, BILL R

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Good. Thanks, Mike. I think she was just looking for the specific date to reference. Fred From: EDWARDS, MICHAEL L [4]

Sent: Monday, December 15, 2014 11:34 AM To: Lyon, Fred Cc: HANSHER, BILL R

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Fred, We also made this statement on page 5 of the Enclosure to the attached letter.

OP-ST-ESF-0002 [Diesel Generators 1 and 2 Auto Operations] verifies that the breakers for LPSI pumps SI-1A and SI-1B cycle open. This procedure was performed in June 2013 after the performance of OP-ST-ESF-0019.

Michael Edwards Nuclear Licensing Engineer Regulatory Assurance Department Omaha Public Power District 9610 Power Lane, Blair NE 68008 402-533-6929 medwards@oppd.com From: Lyon, Fred [5]

Sent: Monday, December 15, 2014 10:19 AM To: EDWARDS, MICHAEL L Cc: HANSHER, BILL R

Subject:

FW: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Mike, what is the date OP-ST-ESF-0002 was last completed? Thanks, Fred 3

From: EDWARDS, MICHAEL L [6]

Sent: Friday, December 12, 2014 11:57 AM To: George, Andrea Cc: NGUYEN, TRUNG T; MCMANIS, JOE L; HANSHER, BILL R; WALKER, MEGAN A

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Hello Annie, Here are the answers to your questions:

Technical Specification 3.7(1)c.i (diesel auto start) is covered in OP-ST-ESF-0002 Diesel Generator Number 1 and Number 2 Auto Operation.

Technical Specification 3.7(1)c.iii (verification of emergency loads) is covered in SE-ST-DG-0001 Verification of Diesel Generator Loads, which was completed in October 2013. It is within its test interval and does not expire before the April 2015 refueling outage.

Michael Edwards Nuclear Licensing Engineer Regulatory Assurance Department Omaha Public Power District 9610 Power Lane, Blair NE 68008 402-533-6929 medwards@oppd.com From: George, Andrea [7]

Sent: Friday, December 12, 2014 6:20 AM To: EDWARDS, MICHAEL L

Subject:

Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Mike, Im the backup PM for Fred. Please see a clarification question below.

Since the footnote is added to SR 3.7(1)c, are SR3.7(1) c.i (diesel auto-start) and SR 3.7(1)c.iii (verification of emergency loads) covered in OP-ST-ESF-0002?

If not, what surveillances tests (STs) meet SR3.7(1) c.i and SR 3.7(1)c.iii? Are those STs within tests intervals?

Thanks, Andrea George Project Manager Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission 301-415-1081 4

This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient. Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, or acceptance. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.

5

Hearing Identifier: NRR_PMDA Email Number: 1775 Mail Envelope Properties (C16FEABDA21F494292E249EE7BA0EF84ACE1B997)

Subject:

RE: Clarification request from technical staff on FCS Supplement to License Amendment Request; One-Time Extension of Technical Specification Surveillance Requirements (MF5143)

Sent Date: 12/17/2014 7:50:51 AM Received Date: 12/17/2014 7:53:12 AM From: HANSHER, BILL R Created By: bhansher@oppd.com Recipients:

"Lyon, Fred" <Fred.Lyon@nrc.gov>

Tracking Status: None "MCMANIS, JOE L" <jmcmanis@oppd.com>

Tracking Status: None "George, Andrea" <Andrea.George@nrc.gov>

Tracking Status: None "EDWARDS, MICHAEL L" <medwards@oppd.com>

Tracking Status: None Post Office: SEPEX731.oppd.oppd-ds.com Files Size Date & Time MESSAGE 7073 12/17/2014 7:53:12 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: