MONTHYEARML14338A6742014-12-0808 December 2014 Acceptance Review License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis (Tac No. MF5163) Project stage: Acceptance Review ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G Project stage: RAI ML15201A7662015-07-15015 July 2015 Appg - Request for an e-copy of NUREG/CR-5265 Project stage: Request ML15106A6822015-11-23023 November 2015 Issuance of Amendment License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis Project stage: Approval 2015-01-15
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24169A4342024-06-18018 June 2024 Acceptance of Requested Licensing Action Amendment Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Palisades Main Steam Line Break Analysis ML24141A1192024-05-23023 May 2024 Acceptance of Requested Licensing Action Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations ML24060A2212024-03-18018 March 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) – Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML17226A3202017-08-21021 August 2017 Acceptance of Requested Licensing Action, Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition ML17184A0932017-07-13013 July 2017 Acceptance Review Letter, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures in an Emergency or During Severe Weather ML17100A7842017-04-11011 April 2017 Acceptance Review Letter, Request for Approval of Certified Fuel Handler Training and Retraining Program ML16253A2212016-09-13013 September 2016 Results of Acceptance Review for License Amendment Request Regarding Control Rod Drive Exercise Surveillance ML14338A6742014-12-0808 December 2014 Acceptance Review License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis (Tac No. MF5163) ML13329A5022013-11-20020 November 2013 LIC-109 Acceptance of Palisades Nuclear Plant'S 10 CFR 50 Appendix G Equivalent Margins Analysis - MF2962 ML1208905462012-03-29029 March 2012 LIC-109 Acceptance Review - Palisades - LAR - Replacement of Spent Fuel Pool Region I Storage Racks - ME8074 ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1112506382011-05-0303 May 2011 LIC-109 Acceptance Review - ME5997 - Palisades - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1023204192010-08-26026 August 2010 Acceptance Review for Implementation of EAL Schemes ML1005701902010-02-25025 February 2010 LIC-109 Acceptance Review - Palisades Request for Exemption from Physical Security Requirements - 10 CFR Part 73 - ME3080 ML0931703722009-11-13013 November 2009 Acceptance Review of Entergy'S Request to Extend Orders (TAC ME1515 - ME2522) ML0930602832009-09-18018 September 2009 Email from Mahesh Chawla Regarding Acceptance Review of License Amendment Request for One-Time Extension to the Integrated Leak Rate Test Interval ML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2024-06-18
[Table view] |
Text
.._~p.R REGu, _ UNITED STATES
.:::." --vr
,."<' ,_ o.,... NUCLEAR REGULATORY COMMISSION
~ C'l WASHINGTON, D.C. 20555-0001
<( 0
~
~ ~ December 8, 2014
"/. ~
~') ,._o Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT- ACCEPTANCE REVIEW RE: LICENSE AMENDMENT REQUEST FOR APPROVAL OF PALISADES NUCLEAR PLANT 10 CFR 50 APPENDIX G EQUIVALENT MARGINS ANALYSIS (TAC NO. MF5163)
Dear Sir or Madam:
By letter dated November 12, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14316A370), Entergy Nuclear Operations, Inc. (the licensee),
submitted a license amendment request for Palisades Nuclear Plant. The proposed amendment would approve the licensee's equivalent margin analysis, performed in accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 50, Appendix G, which demonstrates that materials predicted to possess Charpy upper shelf energy values less than 50 ft-lb will provide margins of safety against fracture, equivalent to those required by Appendix G of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code.
The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with 10 CFR 50.90, an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original application.
Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The above acceptance review was provided via an email dated December 1, 2014. If you have any questions, please contact me at (301) 415-1530.
Sincerely,
~j() . \l~-. 'r, -
,/V0c~-
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via ListServ