MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0302022-08-0202 August 2022 Administrative Files ML22221A0432022-08-0202 August 2022 Quality Checklists RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21252A0452021-09-15015 September 2021 Requalification Program Inspection ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21105A4352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21074A3242021-03-15015 March 2021 LLC - Licensed Operator Positive Fitness-For-Duty Test ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1222020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0432022-08-0202 August 2022 Quality Checklists ML22221A0302022-08-0202 August 2022 Administrative Files RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000317/2017301 and 05000318/2017301 ML17072A3982017-02-0909 February 2017 Op Test Retake - Post Exam Comments and Technical References, and Resolution (Folder 1) ML17069A4072017-02-0909 February 2017 Op Test Retake -Final Operating Test Sections a & B) (Folder 3) 2023-06-16
[Table view] |
Text
Calvert Cliffs OP test comments Plant 1-Editorial, page 1-you are performing the duties of an extra licensed operator Editorial, multiple locations-candidate's Editorial-last page terminating cue-The student is expected to _ _this JPM?
Editorial-examinee's cue sheet. Remove second copy of 'are there any questions .. .'
Plant 2-Not alternate path. Change category to normal JPM or replace.
Plant 3-Cue already states that jockey pump is in auto, shouldn't have to cue applicant Change cue to state that steps through 6.4.8.2.b are complete or add 0-HS-6227 in PTL JPM can conclude when step 6.4.8.5 is complete depending on evaluator discretion RO Admin 1-Add reference to Xenon in stem conditions, info currently unavailable Add cue for boron correction factor RO Admin 2-Procedure to be used for this JPM and associated documentation appears potentially open to interpretation. Not a good discriminatory tool. Replace JPM RO Admin 3-RO justification in place, no comments
RO Admin 4-Move applicant directions to initiating cue section vice initial conditions SRO Admin 1-No comments SRO Admin 2-No comments SRO Admin 3-No comments SRO Admin 4-No comments SRO Admin 5-No comments Sim 1-Back up in procedure so more verifiable actions can be witnessed prior to moving to alternate path; remove given value for charging header flow, let applicant determine and analyze Sim 2-Add in cue to hand hard card to applicant once procedure is located.
Sim 3-No comments
Sim 4-Required materials says AOP-2A, which is incorrect for this JPM, insert correct procedure Sim 5-Add alarm window description in cue If valve is controlled administratively, add cue to hand applicant the valve control log when requested Sim 6-Initial conditions stating reason for trip and associated alarms are window dressing and can be removed Add cue for TBO report of no dropped flags on 14 4kV bus if requested Sim 7-No comments Sim 8-Add information that steps 6.1.J and 6.1.K were previously completed and do not need to be re-performed Fix auto-numbering on examinee's cue sheet Scenario 1-Event 1 is also a reactivity manipulation for the RO Event 3 is not the major, more of a setup item. 6 is the major Event 5 is a component failure, not reactivity Event 1, add RO actions to insert control rods to maintain/reduce power; add applicable TS entries entered by SRO