ML14304A680
| ML14304A680 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/21/2014 |
| From: | Christopher Lally Operations Branch I |
| To: | Calvert Cliffs |
| Shared Package | |
| ML14079A469 | List: |
| References | |
| Download: ML14304A680 (3) | |
Text
Calvert Cliffs OP test comments Plant 1-Editorial, page 1-you are performing the duties of an extra licensed operator Editorial, multiple locations-candidate's Editorial-last page terminating cue-The student is expected to __ this JPM?
Editorial-examinee's cue sheet. Remove second copy of 'are there any questions...'
Plant 2-Not alternate path. Change category to normal JPM or replace.
Plant 3-Cue already states that jockey pump is in auto, shouldn't have to cue applicant Change cue to state that steps through 6.4.8.2.b are complete or add 0-HS-6227 in PTL JPM can conclude when step 6.4.8.5 is complete depending on evaluator discretion RO Admin 1-Add reference to Xenon in stem conditions, info currently unavailable Add cue for boron correction factor RO Admin 2-Procedure to be used for this JPM and associated documentation appears potentially open to interpretation. Not a good discriminatory tool. Replace JPM RO Admin 3-RO justification in place, no comments
RO Admin 4-Move applicant directions to initiating cue section vice initial conditions SRO Admin 1-No comments SRO Admin 2-No comments SRO Admin 3-No comments SRO Admin 4-No comments SRO Admin 5-No comments Sim 1-Back up in procedure so more verifiable actions can be witnessed prior to moving to alternate path; remove given value for charging header flow, let applicant determine and analyze Sim 2-Add in cue to hand hard card to applicant once procedure is located.
Sim 3-No comments
Sim 4-Required materials says AOP-2A, which is incorrect for this JPM, insert correct procedure Sim 5-Add alarm window description in cue If valve is controlled administratively, add cue to hand applicant the valve control log when requested Sim 6-Initial conditions stating reason for trip and associated alarms are window dressing and can be removed Add cue for TBO report of no dropped flags on 14 4kV bus if requested Sim 7-No comments Sim 8-Add information that steps 6.1.J and 6.1.K were previously completed and do not need to be re-performed Fix auto-numbering on examinee's cue sheet Scenario 1-Event 1 is also a reactivity manipulation for the RO Event 3 is not the major, more of a setup item. 6 is the major Event 5 is a component failure, not reactivity Event 1, add RO actions to insert control rods to maintain/reduce power; add applicable TS entries entered by SRO