MONTHYEARL-PI-14-037, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits2014-06-0909 June 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits Project stage: Request ML14302A8192014-10-28028 October 2014 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information Revision to TS 3.8.1 Surveillance Requirements Project stage: RAI L-PI-14-118, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits2014-12-17017 December 2014 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits Project stage: Supplement ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating Project stage: Approval 2014-12-17
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21302A1252021-10-29029 October 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action RTS Power Range Amendment ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0152021-09-0202 September 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Change in the Maximum Surveillance Intervals from 24 Months to 30 Months ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21133A2502021-05-13013 May 2021 NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition ML20254A1162020-09-0909 September 2020 Draft License Transmittal E-Mail ML20223A0632020-08-10010 August 2020 Email Shpo Comment Letter: Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20163A4282020-06-10010 June 2020 Email from MPCA Comment Letter - Prairie Island ISFSI ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20112F4582020-04-21021 April 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Low Temperature Overpressure Protection ML20083F4202020-03-20020 March 2020 NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20052C7582020-02-21021 February 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Westinghouse NSAL-09-05 and NSAL-09-05 ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20022A1762020-01-22022 January 2020 NRR E-mail Capture - Prairie Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements ML20021A1832020-01-21021 January 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML19316A0172019-11-0101 November 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Integrated Leak Rate Test Extension Request ML19253B9642019-09-10010 September 2019 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Relief Request Adoption of Code Case N-786-3 ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19193A0142019-07-0909 July 2019 NRR E-mail Capture - Acceptance of Prairie Island Nuclear Generating Plant, Units 1 and 2 Relief Request Nos. 1-RR-5-10 and 2-RR-5-10 Related to Reactor Vessel Inspection Intervals) ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML19057A4212019-02-26026 February 2019 NRR E-mail Capture - Acceptance of Prairie Island Reactor Vessel Capsule Removal Schedule Request ML19008A3562019-01-0707 January 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant - Audit Plan Related to the License Amendment Request to Implement 10 CFR 50.69 ML18351A0142018-12-14014 December 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Classification of Certain Fuel Handling Equipment ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18233A3692018-08-21021 August 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Adoption of 10 CFR 50.69 ML18201A4132018-07-20020 July 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-439 ML18159A3052018-06-0808 June 2018 NRR E-mail Capture - Monticello - Acceptance of Requested Relief Request RR-012: Lnservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval ML18113A2252018-04-23023 April 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-425 2023-09-05
[Table view] |
Text
NRR-PMDAPEm Resource From: Beltz, Terry Sent: Tuesday, October 28, 2014 11:00 AM To: Vincent, Dale M.
Cc: Anderson, Jon S.; Edmonds, Shavon; Pelton, David; Wall, Scott
Subject:
Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information re: Revision to TS 3.8.1 Surveillance Requirements (TAC Nos. MF4259 and MF4260)
Attachments: Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information Regarding Revision to TS 3.8.1 SRs (TAC Nos. MF4259 and MF4260).docx
Dear Mr. Vincent:
By letter dated June 9, 2014 (Agencywide Documents Access and Management System Accession No. ML14160A593), Northern States Power Company (NSPM), a Minnesota corporation, submitted a license amendment request for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The proposed license amendment would revise the steady-state voltage and frequency in certain Surveillance Requirements in Technical Specification 3.8.1.
The NRC staff in the Electrical Engineering Branch of the Office of Nuclear Reactor Regulation has reviewed the information provided by NSPM and determined that additional information is needed to complete its review.
On October 23, 2014, NSPM was provided draft requests for additional information (RAIs) for its review. In an October 28, 2014, phone call, you indicated that NSPM has reviewed the draft RAIs, and that the draft RAIs may be submitted as final RAIs. The final set of RAIs are provided as an attachment to this e-mail. Also during the phone call, you indicated that NSPM would provide its response to the attached RAIs by December 17, 2014.
If you have any additional questions, please dont hesitate to contact either Scott Wall at (301) 415-2855 or me.
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 Phone: (301) 415-3049 Terry.Beltz@nrc.gov Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.
1
Hearing Identifier: NRR_PMDA Email Number: 1667 Mail Envelope Properties (7E9EA9BB82325E46B07B0F04F99B40D80118C9594609)
Subject:
Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information re: Revision to TS 3.8.1 Surveillance Requirements (TAC Nos. MF4259 and MF4260)
Sent Date: 10/28/2014 10:59:34 AM Received Date: 10/28/2014 10:59:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
"Anderson, Jon S." <Jon.Anderson@xenuclear.com>
Tracking Status: None "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov>
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>
Tracking Status: None "Wall, Scott" <Scott.Wall@nrc.gov>
Tracking Status: None "Vincent, Dale M." <Dale.Vincent@xenuclear.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2035 10/28/2014 10:59:00 AM Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information Regarding Revision to TS 3.8.1 SRs (TAC Nos. MF4259 and MF4260).docx 30281 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUESTS FOR ADDITIONAL INFORMATION NORTHERN STATES POWER COMPANY- MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.8.1 SURVEILLANCE REQUIREMENTS DOCKET NOS. 50-282 AND 50-306 (TAC NOS. MF4259 AND MF4260)
By letter dated June 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14160A593), Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, submitted a request to the U.S.
Nuclear Regulatory Commission (NRC) to amend the Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP), Operating Licenses DPR-42 and DPR-60. The license amendment request proposes to revise steady state voltage and frequency limits for Technical Specification (TS) Surveillance Requirements (SRs) 3.8.1.2, 3.8.1.6, and 3.8.1.9. The changes would modify the SRs by providing surveillance enhancements to improve operation and testing of the emergency diesel generators (EDGs), and provide a more restrictive voltage and frequency band for operation when not connected in parallel with electrical power.
The NRC staff in the Electrical Engineering Branch of the Office of Nuclear Reactor Regulation has reviewed the license amendment request (LAR) and developed the following questions regarding the proposed changes to TS 3.8.1, AC Sources - Operating, SR related to EDG load, voltage, and frequency testing.
- 1. The LAR stated that EDG loading calculations during a loss of offsite power with a safety injection (Sl) event at PINGP were reviewed. The results of these calculations demonstrate that PINGP EDGs are sized adequately to support safeguards loads when considering a frequency increase of 0.5 Hz (60.5 Hz) from the nominal 60 Hz. The EDG steady state loading for an Sl event concurrent with a loss of offsite power (LOOP) indicates that D2 (Unit 1 Train B) has the least margin at a time interval of 5 minutes to 30 minutes with a total loading of 2333.72 kilowatts (kW) compared to the D2 continuous operation rating of 2750 kW.
- a. Please confirm that the small break LOCA, large break LOCA, and main steam line break events have also been considered as part of the analysis of the EDG loading calculations mentioned above.
- b. Engineering calculation ENG-EE-021 previously submitted in support of License Amendment Nos. 189 and 178 regarding a TS change to the EDG SR 3.8.1.9, dated October 21, 2008 (ADAMS Accession Number ML082490441), evaluated the worst-1
case loading on the EDGs. This calculation indicated a higher loading than the 2333.72 kW discussed in this recent LAR.
Please confirm the maximum postulated loading on the EDGs when operating at worst-case voltage and frequency.
- 2. The LAR states that PINGP performed a degraded voltage case study that generated numerous plant configurations per the calculation. The degraded voltage relay (DVR) setpoints and analyses are referenced in the LAR as the bounding analyses to demonstrate operability of equipment and protective relay settings. The DVR setpoint analysis considers the safety buses powered from the offsite electrical power source which generally has a higher capacity to provide the reactive power needs of plant loads compared to the onsite electrical power systems which are exciter capability limited.
- a. Please state the minimum starting voltage for large pump motors and the voltage drop at the remote safety buses associated with starting large pump motors that are a part of the EDG minimum voltage case study.
- b. Please confirm that the motor acceleration time and trip relay set-points are bounded by the DVR analyses when the EDGs are supplying safety loads at the minimum voltage and frequency.
- c. Please confirm that the voltage and frequency requirements, delineated in Regulatory Guide 1.9, Revision 4, Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants, during load sequencing transients are maintained with the proposed steady state EDG frequency and voltage limits.
- d. Please confirm that the degraded voltage relays do not actuate during EDG load sequencing and have to be reset in the event of a loss off offsite power when the EDG is required to supply plant loads.
- 3. The LAR states that DVRs monitor safeguards 4 kV bus voltage and are used in the EDG load shedding and load restoration scheme. The reset values for these DVR relays are 0.6 percent (%) above the dropout values. The actual plant setting for the DVR dropout is 95.4% of 4160 volts alternating c urrent (VAC). Therefore, actual plant setting for the DVR reset would occur at 96.0%. However, the DVR dropout range identified in the setpoint calculation and S e c t i o n 8 . 3 . 3 o f t h e PINGP Updated Final Safety Analysis Report is 95.5 +/- 0.7% (94.8% to 96.2%). With an upper limit of 96.2% as the DVR dropout value, the DVR reset value would be 96.8% (4027 VAC). Once the DVR is reset, a degraded voltage condition is not present. The proposed TS minimum voltage value of 4084 VAC will allow continued sequencing of safeguards loads onto the EDGs by providing adequate voltage to clear a degraded voltage condition.
Please verify that the DVRs do not have to be reset during a LOOP event when the EDG is operating at the minimum voltage of 4084 VAC and is required to supply plant loads.
2