NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 1, Figures
(Redirected from ML14287A293)
Jump to navigation
Jump to search
Similar Documents at Indian Point | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22257A1272022-09-14014 September 2022
[Table view]Biennial Defueled Safety Analysis Report Update, and Regulatory Commitment Change Summary - September 2020 to September 2022 ML20259A2022020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 1, Introduction and Summary ML20259A2072020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 6, Safety Analysis ML20259A2152020-09-14014 September 2020 Defueled Safety Analysis Report, Table of Contents ML20259A2122020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, License Renewal ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2032020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 2, Site and Environment ML20259A2012020-09-14014 September 2020 Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes ML20259A2142020-09-14014 September 2020 Defueled Safety Analysis Report, Instructions and Key to Unit 2 DSAR Revision 0 ML20259A2062020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 5, Conduct of Facility Activities ML20259A2102020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures ML20259A2132020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2052020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 4, Waste Disposal and Radiation Protection System ML20259A2042020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 3, Facility Design and Operation ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-18-069, Submittal of Revision 27 to Updated Final Safety Analysis Report2018-09-17017 September 2018 Submittal of Revision 27 to Updated Final Safety Analysis Report ML17354A0152017-11-28028 November 2017 Enclosure 2 - NET-28091-003-01NP, Rev. 0, Criticality Safety Analysis for the Indian Point Unit 2 Spent Fuel Pool with No Absorber Panel Credit IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A ML16280A2082016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Drawing No. 9321-F-2736-130 to Drawing No. 138248-9 ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A2072016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Figures 9.2-1 to 9.9-1 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-672016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-67 ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-752016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-92016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-9 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-72016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-7 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-52016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-5 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2202016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.2-0 to 14.2-18 ML16280A2242016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents ML16280A2232016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key ML16280A1962016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems ML16280A2222016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 15, Appendix a, License Renewal ML16280A1532016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 ML16280A2142016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A2122016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System ML16280A1592016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary ML16280A2172016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2062016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems ML16280A1872016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures 2022-09-14 |