MONTHYEARML13302C2072013-11-0606 November 2013 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval ML14205A2752014-07-22022 July 2014 NRR E-mail Capture - Acceptance of Application - License Amendment Request for Revision to the Emergency Action Levels Used at South Texas Project, Units 1 and 2 Project stage: Acceptance Review ML14260A4372014-08-14014 August 2014 License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report Project stage: Request ML14260A4392014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2 Project stage: Request ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System Project stage: Request ML14269A1662014-09-25025 September 2014 NRR E-mail Capture - Acceptance of Application - LAR for Rev to (TS) 6.9.1.6, Core Operating Limit Report (Colr), at South Texas Project, Units 1 and 2 (TAC Nos. MF4639 and 4640) Project stage: Acceptance Review ML14290A2002014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1060, Revision 1 Project stage: Withholding Request Acceptance ML14290A2212014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1059, Revision 1 Project stage: Withholding Request Acceptance ML14336A0032014-12-0101 December 2014 NRR E-mail Capture - Request for Additional Information (RAI) - License Amendment Request for Revision to Technical Specification 6.9.1.6 (TACs MF4639 and MF4640) Project stage: RAI ML14352A1802014-12-18018 December 2014 NRR E-mail Capture - Request for Additional Information (RAI) - Revised Emergency Action Levels for South Texas Project, Units 1 and 2 (TACs MD4195 and MF4196) Project stage: RAI NOC-AE-140032, Response to Request for Additional Information Regarding License Amendment Request - Proposed Revision to Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report (COLR)2014-12-18018 December 2014 Response to Request for Additional Information Regarding License Amendment Request - Proposed Revision to Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report (COLR) Project stage: Response to RAI ML15057A2712015-02-26026 February 2015 Commission Memorandum and Order CLI-15-04 Project stage: Request ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits Project stage: Approval ML15098A6082015-03-31031 March 2015 NRR E-mail Capture - Requests: EAL Question and Proprietary Verification Project stage: Other ML15100A0072015-04-15015 April 2015 Request for Additional Information, License Amendment Request to Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 Project stage: RAI ML15190A2182015-07-0101 July 2015 Response to Request for Additional Information and Supplement to South Texas Project (Stp), Units 1 and 2 License Amendment Request for Emergency Action Level Scheme Change Project stage: Supplement NOC-AE-15003265, Response to Request for Additional Information and Supplement to South Texas Project (Stp), Units 1 and 2 License Amendment Request for Emergency Action Level Scheme Change2015-07-0101 July 2015 Response to Request for Additional Information and Supplement to South Texas Project (Stp), Units 1 and 2 License Amendment Request for Emergency Action Level Scheme Change Project stage: Supplement ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 Project stage: Approval ML15254A2412015-09-11011 September 2015 Correction to Enclosures 1 and 2 Related to Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 Project stage: Approval 2014-09-25
[Table View] |
Text
1 NRR-PMDA-ECapture Resource From:
Singal, Balwant Sent:
Thursday, September 25, 2014 12:51 PM To:
'Lsterling@stpegs.com' Cc:
Gonzales, Rafael
Subject:
Acceptance of Application - LAR for Rev to (TS) 6.9.1.6, "Core Operating Limit Report (COLR)," at South Texas Project, Units 1 and 2 (TAC Nos. MF4639 and 4640) (TAC Nos.
MF4195 and MF4196)
ByletterdatedAugust14,2014,STPNuclearOperatingCompany(STPNOC)submittedalicenseamendmentrequestfor revisiontoTS6.9.1.6,CoreOperatingLimitReport,forSouthTexasProject,Units1and2.Thepurposeofthisemail istoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptancereviewofthisamendment request.Theacceptancereviewwasperformedtodetermineifthereissufficienttechnicalinformationinscopeand depthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereviewisalsointendedto identifywhethertheapplicationhasanyreadilyapparentinformationinsufficienciesinitscharacterizationofthe regulatoryrequirementsorthelicensingbasisoftheplant.
ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicensemust fullydescribethechangesrequested,andfollowingasfarasapplicable,theformprescribedfororiginalapplications.
Section50.34of10CFRaddressesthecontentoftechnicalinformationrequired.Thissectionstipulatesthatthe submittaladdressthedesignandoperatingcharacteristics,unusualornoveldesignfeatures,andprincipalsafety considerations.
TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenablethestafftoproceedwithitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Ifadditionalinformationisneededforthestafftocompleteitstechnicalreview,youwill beadvisedbyseparatecorrespondence.
Ifyouhaveanyquestions,pleasecontactmeat(301)4153016.
BalwantK.Singal SeniorProjectManager(ComanchePeak,STP,DiabloCanyon,andPaloVerde)
NuclearRegulatoryCommission DivisionofOperatingReactorLicensing Balwant.Singal@nrc.gov Tel:(301)4153016 Fax:(301)4151222