MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
~ Entergy tergy Entergy Entergy Nuclear Palisades 27780 Nuclear Operations, Palisades Nuclear 27780 Blue Blue Star Operations, Inc Nuclear Plant Plant Star Memorial Covert, MI 49043-9530 ecv;t Inc.*
Memorial Highway 4:o3953o Tel 269 764 2000 Highway Jeffery Jeffery A. Hardy Hardy Regulatory Assurance Regulatory Assurance Manager Manager PNP 2014-081 PNP 201 4-081 14, 2014 August 14,2014 U. S. Nuclear Regulatory Commission ATTN: Document AnN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569)
Palisades Nuclear Plant Docket 50-255 License No. DPR-20
REFERENCES:
- 1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, "Revised Revised Program Plan for Aging Management of Reactor Vessel Internals," Internals, September 13, 2012 (ADAMS Accession Number ML ML12257A352) 12257A352)
- 2. NRC e-mail, Palisades "Palisades - Request for Additional Information - ME9569-ME9569 -
Revised Program Plan for Aging Management of Reactor Vessel Internals, March 04,2013 Internals," 04, 2013 (ADAMS Accession Number ML ML13063A318) 13063A318)
- 3. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022,
Response
"Response to Request for Additional Information - Revised Program Plan for Aging Management of Reactor Vessel Internals,"Internals, April 04, 2013 (ADAMS Accession Number ML1 3094A41 4)
ML13094A414)
- 4. NRC e-mail, Palisades "Palisades - Request for Additional Information Information - Reactor Vessel Internals Internals - ME9569
- ME9569 - Email Resend, Resend," December 12, 12, 2013 (ADAMS Accession Number ML13346A644)
ML13346A644)
- 5. Entergy Nuclear Operations, Operations, Inc.
Inc. letter to NRC, NRC, Summary "Summary of JanuaryJanuary 2, 2014 2014 Teleconference with Nuclear with Nuclear Regulatory Staff Staff onon Palisades Palisades- -
Req uest for Additional Information - Reactor Vessel Internals Request Internals - ME9569 ME9569
Response
Response Schedule, Schedule," January January 07, 07, 2014 (ADAMS (ADAMS Accession Number Number ML1 4007A1 51)
ML14007A151)
- 6. Entergy
- 6. Nuclear Operations, Entergy Nuclear Inc. letter Operations, Inc. to NRC, letter to NRC, PNP PNP 2014-001, 2014-001,
Response
"Response to to Second Second Request Request forfor Additional Additional Information Reactor Vessel Information - Reactor
- Vessel Internals Internals - ME9569, ME9569," April 03, 2014 April 03, 2014 (ADAMS (ADAMS Accession Accession NumberNumber ML1 4097A376)
ML 14097 A376)
- 7. NRC
- 7. NRC e-mail, e-mail, Request "Request for for Additional Additional Information Information - Palisades
- Palisades - Aging Aging Management Program for Management Program for ReactorReactor Vessel Vessel Internals Internals - ME9569,
- ME9569," JuneJune 09, 09, 2014 (ADAMS 2014 (ADAMS Accession Accession Number Number ML14160B264)
ML14160B264)
PNP 2014-081 PNP 2014-081 Page 22 of Page of 22 Entergy Nuclear
- 8. Entergy Nuclear Operations, Operations, Inc.
Inc. letter letter to NRC, PNP to NRC, PNP 2014-067, 2014-067, Response to Third Request Information - Reactor "Response to Third Request for Additional Information Reactor Vessel Vessel Internals (ME9569),"
Internals (ME9569), July 01, 2014 2014 (ADAMS Accession Number Number 41 83A01 4)
ML114183A014)
ML
- 9. NRC
- 9. NRC e-mail, "Request Request for Additional Information:
Information: Palisades Palisades Aging Management Program Management Program for Reactor Reactor Vessel Internals (ME9569),"
(ME9569),
August 01, 2014 Madam:
Dear Sir or Madam:
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.
In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.
In Reference 4, the NRC issued a second RAI with a 30-day required response. In Reference 5, ENO documented a teleconference during which the NRC accepted a request to extend the second RAI response from 30 days to 120 days. ENO responded to the second RAI in Reference 6.
In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.
In Reference 9, the NRC issued a fourth RAI with a 30-day required response.
The response to the fourth RAI RAt is provided in the attachment.
This submittal submittal contains no proprietary information.
This submittal contains no no new or revised commitments.
Sincerely, jah/jse jah/jse
Attachment:
Attachment:
Response
Response to to Fourth Fourth Request Request for for Additional Additional Information Information for for Reactor Reactor Vessel Vessel Internals Internals (ME9569) cc:
cc: Administrator, Administrator, Region Region III, III, USNRC USNRC Project Project Manager, Manager, Palisades, Palisades, USNRC USNRC Resident Inspector, Palisades, Resident Inspector, Palisades, USN RC USNRC
ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)
By letter dated September 13, 2012, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.
- 1. NRC Information Request - RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a "Core Core Weld, at PNP and is subject to EVT-1 visual examination as a Support Barrel Lower Girth Weld,"
Primary inspection category component.
"Primary" ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of Core Support Barrel Lower Girth Weld" the lower core support structure is considered a "Core Weld at Primary inspection category PNP, and is subject to EVT-1 visual examination as a "Primary" component.
As discussed in the RAI, Figure 14, "Palisades Palisades Reactor Vessel Internals Inspection Plan,"
Plan, of Reference 11 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:
EVT-1 Primary: EVT -1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]
period (ten year intervals)
Coverage: 100%)
100% of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a Core "Core Support Barrel Lower Girth Weld Weld" and is subject to EVT-1 visual examination as a Primary "Primary" inspection category component.
- 2. NRC NRC Information Information Request - RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in in that both both the Core "Core Support Support Barrel Lower Flange Weld, Weld,"
and "Core Support and Core Support Barrel Lower Core Barrel Flange, should have Flange," should been identified have been as not identified as not applicable applicable to PNP.
Page Page 11 of 22
ENO Response Pressurized Water Reactor (PWR)
ENO understands that there is an error in MRP-227-A, "Pressurized Internals Inspection and Evaluation Guidelines" Guidelines (Reference 2), Tables 4-2, "CE CE plants components, and 4-5, "CE Primary components," CE plants Expansion components."
components. In these two tables, Core Support Barrel Assembly, Lower flange weld" the "Core weld and the "Core Core Support Barrel flange should have been identified as not applicable to PNP.
Assembly, Lower core barrel flange" This error has been documented in the PNP corrective action program.
References
- 1. Revised Program Plan for Aging Management of Reactor Vessel Palisades Nuclear Plant, "Revised Internals, dated September 13, 2012 (ADAMS Accession No. ML Internals," ML12257A352) 12257A352)
- 2. Electrical Power Research Institute, "Materials Materials Reliability Program: Pressurized Water (MRP-227-A), 1022863, dated Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A),"
December 2011.
Page 22 of 22