UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. William R. Gideon, Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, Inc.
3581 West Entrance Road Hartsville, SC 29550 August 22, 2014
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2-ACCEPTANCE REVIEW CONCERNING LICENSE AMENDMENT REQUEST TO MODIFY TECHNICAL SPECIFICATION 5.5.9, STEAM GENERATOR PROGRAM (TAC NO. MF4372)
Dear Mr. Gideon:
By letter dated June 20, 2014 (Agencywide Documents Access and Management System Accession No. ML14188B015), Duke Energy Progress, Inc., submitted a license amendment request for H. B. Robinson Steam Electric Plant, Unit 2. The proposed amendment request would revise the Technical Specification for the Steam Generator Program accident-induced leakage performance criterion for any design-basis accident other than a steam generator tube rupture. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any
further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-2760.
Docket No. 50-261 cc: Distribution via Listserv Sincerely,
/RAJ Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML14223A628 Sincerely, IRA!
Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE NRR/DORULPLII-2/PM NRR/DORULPLII-2/LA NRR/DORULPLII-2/BC NRR/DORULPLII-2/PM NAME MBarillas BCiayton LRegner MBarillas DATE 8/20/14 8/18/14 8/21/14 8/22/14