MONTHYEARML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15106A6322015-04-17017 April 2015 Tennessee Valley Authority FHRR Audit Plan-4-22-2015 ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14205A7002014-08-0404 August 2014 Plan for Onsite Audit Regarding Tennessee Valley Authority Licensing Preservation Program ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 ML14066A4392014-03-10010 March 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to 10 CFR 50.54(hh)(2) ML14058A1052014-03-0606 March 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Relating to Order EA-12-049 (Mitigating Strategies) 2017-07-06
[Table view] Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August4,2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
WATIS BAR NUCLEAR PLANT, UNIT 2- PLAN FOR THE ONSITE AUDIT REGARDING TENNESSEE VALLEY AUTHORITY'S LICENSING PRESERVATION PROGRAM
Dear Mr. Shea:
As part of the Watts Bar Nuclear Plant (WBN), Unit 2 operating licensing review reactivation, and consistent with the Commission's staff requirements dated July 25, 2007 (Agencywide Documents Accession Management System (ADAMS) Accession No. ML072060688; SECY-07-0096), the U.S. Nuclear Regulatory Commission (NRC) staff required the Tennessee Valley Authority (TVA) to develop and implement a licensing basis preservation program to confirm the validity of previously completed NRC safety evaluations to the final WBN Unit 2 design, or to identify topics that require supplemental review.
In Supplement 22 of NUREG-0847, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant (WBN), Unit 2," the NRC staff documented the results of their review of TVA's Program for Maintenance and Preservation of the Licensing Basis for Units 1 and 2 (Section 25.9). After reviewing TVA's program for licensing preservation, the staff concluded that the program, if properly implemented, provides reasonable assurance that any effects on previously reviewed and resolved safety evaluation report topics will be evaluated for WBN Unit 2. An open item was created to track an NRC audit of TVA's Licensing Preservation Program; Open Item 12 in Appendix HH of Safety Evaluation Report, Supplement. The staff plans to conduct an onsite audit, which will address Open Item 12 in Appendix HH, in accordance with the enclosed audit plan from August 12-14, 2014.
J.Shea If you have any questions, please contact me at 301-415-2048 or by e-mail at Justin.Poole@nrc.gov.
Sincerely,
~ CJ* ~ -j-oY Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-391
Enclosure:
Audit plan cc w/encl: Distribution via Listserv
Audit Plan Watts Bar Nuclear Plant, Unit 2 BACKGROUND AND AUDIT BASIS As part of the Watts Bar Nuclear Plant (WBN), Unit 2 operating licensing review reactivation, and consistent with the Commission's staff requirements dated July 25, 2007 (Agencywide Documents Accession Management System (ADAMS) Accession No. ML072060688; SECY-07-0096), the U.S. Nuclear Regulatory Commission (NRC) staff required the Tennessee Valley Authority (TVA) to develop and implement a licensing basis preservation program to confirm the validity of previously completed NRC safety evaluations to the final WBN Unit 2 design, or to identify topics that require supplemental review.
In 2008, the TVA submitted its licensing basis preservation program, New Generation Development and Construction (NGDC) Procedure PP-20, "Unit 2 Licensing Basis Preservation Program," which describes the methods or processes for determining potential changes that could affect Unit 2 licensing basis during the ongoing design and construction activities (ADAMS No. ML083460177). In April2009 the NRC staff reviewed TVA's submittal and asked for more information and details about the licensing basis preservation program. In 2009, TVA provided Revision 002 of "Engineering Document Construction Release" (EDCR), which addressed how each Unit 2 design change would be evaluated for licensing-basis impact. Specifically, Attachment J of the EDCR, "Licensing Basis Preservation Review Form," has screening questions to identify potential impact. TVA identified the reviews to be performed for each EDCR issue to ensure that the Unit 2 licensing basis is implemented in the same manner as the corresponding Unit 1 licensing basis to obtain the same conclusion, to the maximum extent practical, as identified in NGDC PP-20. TVA stated that the process in Appendix J addresses the corrective action program plans, special programs, generic communications, exemptions, reliefs, and other actio~s identified in NGDC PP-20.
In Supplement 22 of NUREG-0847, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant (WBN), Unit 2," the NRC staff documented the results of their review of TVA's Program for Maintenance and Preservation of the Licensing Basis for Units 1 and 2 (Section 25.9). After reviewing NGDC PP-20 and EDCR Appendix J the staff concluded that the program, if properly implemented, provides reasonable assurance that any effects on previously reviewed and resolved safety evaluation report topics will be evaluated for WBN Unit 2. NRC audits of TVA's implementation of NGDC PP-20 and EDCR Appendix J is documented as Open Item 12 (Appendix HH of Safety Evaluation Report, Supplement (SSER)).
In 2009, NRC inspectors identified areas where past Title 10, Code of Federal Regulations, Section 50.59 evaluations and screenings based their conclusions upon the unfinished state of Unit 2's facilities. The inspection report (IR) 05000390/2009002 and 05000391/2009002 confirmed that there are fractional percentages of previous screenings and evaluations that will need to be revisited under the construction interface procedures tied to licensing basis preservation and initiated tracking Problem Evaluation Report (PER) 162088 to ensure that there is a clear reference to this activity within their corrective action program (ADAMS ML091140240).
Enclosure
By letter dated June 17, 2011, TVA transmitted an enclosure documenting a self-assessment of its Licensing Basis Preservation Program (ADAMS ML11186A552). The June 17, 2011, letter documented TVA's commitment to perform a periodic review of licensing written correction action plans (CAP) and perform a focused self-assessment to ensure that the CAP specified in PER 239111 is implemented effectively.
AUDIT SCOPE As discussed, onsite audits will be performed per Office Instruction LIC-111, "Regulatory Audits," to support the NRC staff's safety review of TVA's Licensing Preservation Program as described in Open Item 12 documented in SSER Appendix HH. The purpose of the audit is to obtain and review information regarding how TVA implements its Licensing Preservation Program (NGDC PP-20), including how it has utilized the process from EDCR Appendix J.
The onsite audit will have three components: (1) a review of a list of EDCR Attachment J evaluation forms; (2) selection of a sample of Attachment J evaluation forms covering a variety of technical areas and (3) a detailed review of those evaluation forms where section 4, 5, 6 are answered affirmatively.
INFORMATION NEEDS
- Current version of NGDC PP-20, "Licensing Basis Preservation Program."
- Documents related to the current version of EDCR including Appendix J Evaluation Forms.
o If available, a list of EDCR Attachment J evaluation forms including a descriptive title for each item on the list o If available, items screening in for section 4, 5, or 6 in Attachment J.
- Documentation of TVA's regulatory commitments related to the Licensing Basis self-assessments (tracked via PER 239111 ).
- Construction interface procedures tied to licensing basis preservation and tracked via PER 162088.
- Documents related to TVA Quality Assurance Program Nuclear Quality Assurance Plan (NQAP) Appendix F, Watts Bar Unit 2 Construction Completion Project.
NRC AUDIT TEAM Title Team Member Team Lead Justin Poole Project Manager Jeanne Dion Project Manager Anthony Minarik LOGISTICS The audit will be conducted onsite at Watts Bar August 12-14, 2014. Entrance and exit briefings will be held with the licensee at the beginning and end of the audit, respectively, as well as daily briefings of team activities. Additional details will be addressed over the phone. A more detailed schedule is provided on the following page.
A private conference room is requested for NRC audit team use with access to audit documentation upon arrival and as needed.
DELIVERABLES An audit report/summary will be issued to the licensee within 45 days from the end of the audit.
Proposed Schedule Onsite Day 1, Tuesday August 12, 2014 8:00 am Check in at site; Badging 9:00 am Entrance meeting 9:30am NRC Audit Team Activities commence 12:00 pm Lunch 1:00pm Audit Team meeting 4:30pm Team lead daily debrief with licensee Onsite Day 2, Wednesday, August 13, 2014 8:00 am Check in at site; meet with Senior Resident/Resident 9:00 am Plant tour 12:00 pm Lunch 1:00pm Continue NRC Audit Team Activities 3:30pm Audit Team meeting 4:30 pm NRC/Licensee exit meeting Onsite Day 3, Thursday, August 14, 2014 8:00 am Check in at site; meet with Senior Resident/Resident 9:00am Continue NRC Audit Team Activities 12:00 pm Lunch 1:00pm NRC/Licensee exit meeting 2:00pm Tentative Schedule Meetings with TVA licensing 4:30 pm Exit Site
J.Shea If you have any questions, please contact me at 301-415-2048 or by e-mail at Justin. Poole@ nrc. gov.
Sincerely, IRA by SLingam for/
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-391
Enclosure:
Audit plan cc w/encl: Distribution via Listserv DISTRIBUTION:
LPWB RIF RidsNrrDorllpWb Resource RidsNrrPMWattsBar1 Resource RidsN rrLABCiayton Resource RidsAcrsAcnw_MaiiCTR Resource RidsNrrPMWattsBar2 Resource RidsRgn2MaiiCenter Resource ADAMS Accession No. ML14205A700 OFFICE NRR/DORUPMit NRR/DORULPWB/PM NRR/DORULPWB/LA NRR/DORULPWB/BC NAME JDion JPoole BCiayton JQuichocho DATE 7/30/14 7/30/14 8/1/14 8/4/14 OFFICE NRR/DORULPWB/PM NAME JPoole (Slingam for)
DATE 8/4/14 OFFICIAL AGENCY RECORD