ML14198A125

From kanterella
Jump to navigation Jump to search
Notice of Availability of the Draft Plant-Specific Supplement 53 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Sequoyah Nuclear Plant, Units 1 and 2
ML14198A125
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/01/2014
From: Brian Wittick
License Renewal Projects Branch 1
To: Mueller H
Environmental Protection Agency
Drucker D, 415-6223
References
Download: ML14198A125 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 1, 2014 Mr. Heinz Mueller U.S. Environmental Protection Agency Region 4 NEPA Program Office 61 Forsyth Street, SW Atlanta, GA 30303

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT PLANT-SPECIFIC SUPPLEMENT 53 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Mueller:

Enclosed are two printed copies and two CDs of the draft Supplement 53 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, regarding the license renewal of Sequoyah Nuclear Plant (SQN), Units 1 and 2.

The draft Supplement 53 to NUREG-1437 was submitted to the Environmental Protection Agency (EPA) via e-NEPA on August 8, 2014. In addition, a copy of this document is being mailed or e-mailed to interested Federal and State agencies, industry organizations, interest groups, and members of the public. A copy of this document has also been placed in the U.S.

Nuclear Regulatory Commissions (NRC) Public Document Room, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, and in the NRC Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRC's website at http://www.nrc.gov/readingrm/adams.html. The accession number for draft Supplement 53 to NUREG-1437 is ML14211A454. Please note that the public comment period for this document ends on September 29, 2014.

H. Mueller If further information is required, please contact Mr. David Drucker, Senior Project Manager, for the environmental review of the SQN license renewal application, by telephone at 301-415-6223 or by e-mail at david.drucker@nrc.gov.

Sincerely,

/RA/

Brian D. Wittick, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosure:

Draft Supplement 53 cc w/encl: Listserv

ML14198A125 *concurred via email OFFICE LA:DLR* PM:RPB2:DLR BC:RPB2:DLR NAME IKing DDrucker BWittick DATE 7/22/14 7/31/14 8/1/14

Letter to H. Mueller from B. Wittick dated August 1, 2014

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT PLANT-SPECIFIC SUPPLEMENT 53 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:

HARDCOPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRapb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDirRpob Resource


DDrucker BWittick BMizuno, OGC BHarris, OGC