Docket No. 50-261 DISTRIBUTION:
Docket No. 50-261 J. Partlow NRC PDR GRequa Mr. E. E. Utley, Executive Vice President Local PDR CParrish Power Supply and Engineering & Construction PAD #2 R/F ACRS (10)
Carolina Power and Light Company HThompson Tech. Branch Post Office Box 1551 OELD Gray File Raleigh, North Carolina 27602 EJordan LRubenstein BGrimes
Dear Mr. Utley:
SUBJECT:
Revised LOCA Analysis for H. B. Robinson Steam Electric Plant Unit No. 2 Exxon Nuclear Company notified the NRC, Region V, of an error in the LOCA/ECCS analyses for D. C. Cook Unit 1 and H. B. Robinson Unit 2 by letter dated September 30, 1985. The error was an input to the TOODEE2 code which resulted in an underprediction of the peak cladding temperature for a LOCA.
Revised LOCA/ECCS analyses were provided to the NRC for H. B. Robinson Unit 2 with the TOODEE2 input error corrected by letter dated October 8, 1985. As a result of these analyses, revised Fq values, and a revised K(z) curve, was developed for H. B. Robinson Unit 2.
We have completed our review of your analyses and have concluded that operation of H. B. Robinson Unit 2 within the revised values of Fq and the K(z) curve satisfies the criteria of 10 CFR 50.46.
A copy of our Safety Evaluation is enclosed.
Sincerely, Glode Requa, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc:
See next page OFC
- LA:PAD #3 :PM:PAD #2 : D D #2 ::
NAME :C. Parrish
- G. R g :
nstein DATE :12/A/85
- 12// 85
- 12//K/85 OFFICIAL-RECORD COPY 8512260241 851223 PDR ADOCK 05000261 P
PDR.