ML14192A671
| ML14192A671 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, Robinson, 05000000 |
| Issue date: | 07/03/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8508080346 | |
| Download: ML14192A671 (2) | |
Text
JUL 031985 Carolina Power and Light Company ATTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT:
DOCKET NOS. 50-325, 50-324 AND 50-261 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the Brunswick and Robinson facilities for radio chemical analyses. These samples are to be analyzed for tritium, strontium-89, strontium-90, and iron-55 in accordance with your approved procedures for analysis of liquid waste'samples. If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples.
The spiked samples, with instructions, will be sent-under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory within approximately thirty days.
We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples.
Results should be sent to:
U. S.
Nuclear Regulatory Commission, Region II, Attn:
Independent Measurements and Environmental Protection Section Chief. Our evaluation of your results will be discussed with your staff and documented in our next inspection report for this area.
Spiked samples will be sent to you on an annual basis as part of our routine inspection program.
If you have any questions regarding this program, please contact the Independent Measurements and Environmental Protection Section Chief by telephone at 404-221-2600.
Sincerely, Roger D. Walker, Director Division of Reactor Projects cc:
(See page 2) 8508080346 850703 PDR ADOCK 05000261 p
Carolina Power and Light Company
- 2.
cc:
. W. Howe, Vice President Brunswick Nuclear Project R. Dietz, Plant General Manager v(. E. Robertson, Chemistry Supervisor, Enviromental and Radiation Control
. A. Eaddy, Chemistry and Environmental Supervisor
. E. Morgan, Plant General Manager E. Smith, Manager Chemistry and Health Physics
. P. Beatty, Jr., Manager Robinson Nuclear Project Department bccWRC Resident Inspector Document Control Desk State of North Carolina RII R I RII R
SAdamovitz (rt DMontgomery DCollins PFredrickson 6.///85
/
/85
// /85
-7/-3/85