ML14192A359

From kanterella
Jump to navigation Jump to search
Confirms 820426 Telcon Between B Furr & Fj Long Re Results of Inservice Insp.Evaluation of Insp of Second Coolant Pump Will Be Basis for Decision Re Third Pump
ML14192A359
Person / Time
Site: Robinson 
Issue date: 04/26/1982
From: O'Reilly J
NRC/IE, NRC/RGN-II
To: Jackie Jones
Carolina Power & Light Co
References
NUDOCS 8205040395
Download: ML14192A359 (2)


Text

APR 2 6 1982 Carolina Power and Light Company ATTN:

Mr. J. A. Jones, Senior Executive Vice President and Chief Operating Officer 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:

Subject:

Confirmation of Action -

Robinson 2 Docket No. 50-261 This is to confirm the telephone discussion between Mr. B. Furr, Vice President of Nuclear Operations and Mr. F. J. Long of this office on April 26, 1982. That discussion related to the circumstances surrounding the cracking of reactor coolant pump bolts and other results of the in-service inspection conducted at your H. B. Robinson 2 facility. Based on the discussion, it is our understanding that you will perform an inspection of a second coolant pump and based on your evaluation of the results, a decision will be made regarding the third pump. It is also our understanding that you will obtain the concurrence of this office prior to resuming reactor operation at the H. B. Robinson facility.

Please inform this office immediately, if your understanding of this matter is different from that stated above.

Sincerely, James P. O'Reilly Regional Administrator cc:

R. B. Starkey, Jr., Plant Manager B. Furr, Vice President Nuclear Operations bcc:

NRC Resident Inspector E. Jordan, IE Division of Engineering and Quality Assurance J. Lieberman, IE Director of Enforcement Staff G. Requa, NRR, Licensing Project Manager R. C. Lewis F. J. Long C. Julian 8205640395 820426 PDR ADOCK 05000261 G P D

R---

APR 2 6 1982 Carolina Power & Light Company 2

RII RI RII Of Ckli ian:dt F ong R

s H5 4/26/82 40/82 40/82