Forwards Structural Engineering Branch & Chemical Engineering Branch Requests for Addl Info Re Evaluation of Impact Resulting from Changes to Spent Fuel Pool & Increased Amount of Stored Fuel.Response Is Requested within 30 Days
ML14192A172
Person / Time
Site: Robinson 
Issue date: 04/03/1981
From: Varga S
Office of Nuclear Reactor Regulation
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8104200540
Download: ML14192A172 (6)


Text

< USa D

UTION:

C PDR L PDR 1TERA NSIC Docket No. 50-261 ORB#l Rdg DEisenhut OELD IE-3 ACRS-10 Mr. J. A. Jones ARg1 Senior Executive Vice President SParsh

-drolina Power and Light Company Gray File 336 Fayetteville Street Raldigh, Nork-k Carolina 27602

Dear Mr. Jones:

By letter dated December 1, 1980, you submitted a request for a spent fuel pool expansion for the B. B. Robinson Steam Electric Plant, Unit No. 2. We find that we 'need additional information to continue our review.

The information we need is detailed in enclosures 1 and 2. These questions will allow us to evaluate the impact resulting from the changes to the spent fuel pool and from the increased amount 16f stored fuel. This is the second of a series of requests on thisiP matter. It is requested that you respond within 30 days of the date of this letter.

Sincerely, Original signed bya.

S. A. Varga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosures:

As state cc: w/enclosures See next page 8I4200 19O OFFICE)

OR1 SURNAMEO. 9 ghboi SV DATE 4/981: ds 81 NRC FORM318(10/80NRCM0240 OFFICIAL RECORD COPY

-USGPO 1980--329-824

jt' REG,,

0o UNITED STATES 0

~NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 3, 1981 Docket No. 50-261 Mr. J. A. Jones Senior Executive Vice President Carolina Power and Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 Dear Mr. Jones By letter dated December 1, 1980, you submitted a request for a spent fuel pool expansion for the H. B. Robinson Steam Electric Plant, Unit No. 2. We find that we need additional information to continue our review.

The information-we need is detailed in enclosures 1 and 2. These questions will allow us to evaluate the impact resulting from the changes to the spent fuel pool and from the increased amount of stored fuel.

This is the second of a series of requests on this matter. It is requested that you respond within 30 days of the date of this letter.

Sin cerely, /

-Steen A'VarjaChieA Operating Reactors Bk hch #1 Division of Licensing

Enclosures:

As state cc: w/enclosures See next page

!,r. J. A. Jones Carolina Power and Light Company cc:

G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridoe 1800 M Street, N.W.

Washington, D. C. 20036 Hartsville Memorial Library Home and Fifth Avenues Martsville, Sou.th Carolina 29550 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 266-1A Hartsville, South Carolina. 29550

  • Michael C. Farrar, Chairman Atomic Safety and Licensing Appeal Board Panel U. S.. Nuclear Regulatory Commission Washington, D. C.

20555 Richard S. Salzman Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Comission ashington, D. C. 20555 Dr. W. Reed Johnson Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.

20555

O STRUCTURAL ENGINEERING BRANCH REQUEST FOR ADDITIONAL INFORMATION H. B. ROBINSON UNIT 2 FUEL STORAGE MODIFICATION

1. Provide a description of all items which may be moved over the spent fuel assemblies. State which of these heavy objects is the critical one during operation and during installation.
2. Indicate whether fabrication and quality control of the spent fuel racks are in conformance with Subsection NF of the ASME Code. If not, identify and justify the deviations.
3. Provide the load combinations and the acceptance strains and/or the stress criteria used in the design of the fuel pool liner.

Indicate how the leaktight integrity of the fuel pool liner will be maintained under heavy drop accident.

4. Provide the norlinear finite element model used in the time history analysis. Describe in detail how the nonlinearities due to gaps, friction losses and boundary conditions are accounted for in the model and analysis. Discuss, also, the analysis and provide justifications.
5. Discuss the method used to account for the effect of sloshing water on the fuel pool walls and fuel racks.

Page 2 of Enclosure

6. Provide the method of analysis used to obtain the equivalent static load due to the cask drop on the slab.
7. Provide the numerical values for the "load correction factors" and describe how these factors are accounted for in the analysis of the rack assembly.
8. Discuss in detail the analysis used to account for the fuel handling crane uplift accident and provide the criteria used to assure the criticality in the racks is not violated.
9. Provide the criteria used in the design of the two added steel columns.
10. Provide and justify the time history and the floor response spectra used in the seismic analysis of the fuel rack assembly.
11.

Indicate if this proposed modification conforms with the NRC position on fuel pool modification entitled "OT Position for Revlew and Acceptance of Spent Fuel Storage and Handling Applicatins", issued on April 14, 1978 and later amended on January 18, 1979. If not, identify and justify the deviations.

9 LOSURE 2 ADDITIONAL INFORMATION RLQUIRED BY CHEMICAL ENGINEERING BRANCH ON THE PROPOSED H. B. ROBINSON SPENT FUEL STORAGE EXPANSION (TAC 42415) 281-1 The December 1, 1980 amendment request does not indicate any, (9.3.2) proposed modification of the spent fuel pit cooling loop (SFPCL) in conjunction with the proposed modifications for high-density spent fuel storace. Describe what changes, if any, will be made to the SFPCL to maintain the level of pool water purity with respect to visual clarityand activated corrosion and fission product buildup the same as for the orig.inal.spent fuel storage capacity. Assume that the number of defective fuel assemblies increase in proportion to the increased spent fuel storage capacity.

If no changes to the SFPCL are to be made, indicate how the same level of pool water purity will be maintained.

281-1 Describe the samples and instrument readings and their frequency (9.3.2) of measurement that will be performed to monitor the water purity and need for demineralizer resin replacement. State the chemical and radiochemical limits to be used in monitoring.the spent fuel pool water and initiating corrective action. Provide the basis for establishing these limits. Your response should consider variables such as:

conductivity, gross and iodine activity, demineralizer differential pressure, pH and crud level.