ML14191B093
| ML14191B093 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/03/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B094 | List: |
| References | |
| NUDOCS 8903240076 | |
| Download: ML14191B093 (3) | |
See also: IR 05000261/1989006
Text
ACCELERATED
DITPBUT-ION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903240076
DOC.DATE: 89/03/03
NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
'O
UTH.NAME
AUTHOR AFFILIATION
LLINS,D.M.
Region 2, Ofc of the Director
ECIP.NAME
'
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-06 on 890206-09.No violations
noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR t ENCL +/- SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
c
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN,J
1
1
OGC/HDSL
1
1
B EGI02
1
1
RGN2
FL
01
1
1
.
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
IR
D
S
A
D
D
N= O 0 AL.L "RIDS" RECIPm1lIS:
PIEASE HELP US TO REDUCE MSTE! CONACT THE DOCUMENT CONIROL DESK,
FROM Pl-37 (EXT. 20079) TO ELIMINTE YOUR NAME FIDI DISTRIBUTION
LISTS FOR DOCUKENT YOU D'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
IIIot
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/89-06
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. T. Lauer on February 6-9,
1989.
The inspection included a review of .
activities authorized for your Robinson facility.
At the conclusion of the
inspection, .the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Douglas M. Collins, Chief
8903240076 890023
Emergency Preparedness and Radiological
P
PNU
Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
Carolina Power and Light Company
2
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RH
MLauer:tj
JPotter
03/
/89
03/ /89