ML14191B090
| ML14191B090 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/21/1989 |
| From: | Reyes L NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8903100461 | |
| Download: ML14191B090 (2) | |
See also: IR 05000261/1988030
Text
ACCELERATED
DSTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903100461
DOC.DATE: 89/02/21
NOTARIZED: NO
DOCKET #
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
EYES,L.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Ack receipt of 890108 response to violations noted in Insp
Rept 50-261/88-30.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
LO,R
1
INTERNAL: AEOD
1
AEOD/DEIIB
1
DEDRO
1
NRR SHANKMAN,S
1
NRR/DEST DIR
1
NRR/DLPQ/PEB 11
1
NRR/DLPQ/QAB 10
1
NRR/DOEA DIR 11
1
NRR/DREP/EPB 10
1
NRR/DREP/RPB 10
2
NRR/DRIS DIR 9A
1
NRR/PMAS/ILRB12
1
NUDOCS-ABSTRACT
1
Z7
ERMAN ,J
1
OGC/HDS1
1
G
EGF7T1
02
1
RGN2
FILE
01
1
W
ERNAL: LPDR
1
NRC PDR
1
1
IR
t
S
A
NorE TO ALL "RIDS" RECIPIENTS:
C
PLEASE MP US TO
ED= WSTE!
00N=TCT THE DOCUMENT CONTRL DESK,
ROCK P1-37 (EXr. 20079) 'tO ELIMI
YOUR WM F 0
DISTIBTION
LISTS FOR DOCUMNENS Y00 DIT NEEDI
O
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
3
FEB 2 198
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-30
Thank you for your response of January 8, 1989, to our request for informa
tion,
issued on December 8, 1988,
concerning actions being taken at your
H. B. Robinson facility in order to improve the Operation Department's review
for applicable Technical Specification action statements upon determination of
inoperable equipment. We have evaluated your response and found it acceptable.
We will examine the implementation of your corrective actions during future
inspections.
We appreciate your cooperation in this matter.
Sincerely,
Original Signed by
Luis A. Reyes
Luis A. Reyes, Director
Division of Reactor Projects
cc:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
8903100461 890221
ADOCK 0500261
0
PNU
RH
RII
RII
RII
RCarroll:ser
HDance
DVerrelli
BHehl
02/JD/89
02/-o/89
02/i /89
02/
/89