ML14191B090

From kanterella
Jump to navigation Jump to search
Ack Receipt of 890108 Response to 881208 Request for Info Re Insp Rept 50-261/88-30.Response Acceptable for Actions to Improve Operation Dept Review for Applicable Tech Spec Action Statements W/Determination of Inoperable Equipment
ML14191B090
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/21/1989
From: Reyes L
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8903100461
Download: ML14191B090 (2)


See also: IR 05000261/1988030

Text

ACCELERATED

DSTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903100461

DOC.DATE: 89/02/21

NOTARIZED: NO

DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

UTH.NAME

AUTHOR AFFILIATION

EYES,L.A.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Ack receipt of 890108 response to violations noted in Insp

Rept 50-261/88-30.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR

ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

LO,R

1

INTERNAL: AEOD

1

AEOD/DEIIB

1

DEDRO

1

NRR SHANKMAN,S

1

NRR/DEST DIR

1

NRR/DLPQ/PEB 11

1

NRR/DLPQ/QAB 10

1

NRR/DOEA DIR 11

1

NRR/DREP/EPB 10

1

NRR/DREP/RPB 10

2

NRR/DRIS DIR 9A

1

NRR/PMAS/ILRB12

1

NUDOCS-ABSTRACT

1

OE

Z7

ERMAN ,J

1

OGC/HDS1

1

G

EGF7T1

02

1

RGN2

FILE

01

1

W

ERNAL: LPDR

1

NRC PDR

1

NSIC

1

IR

t

S

A

NorE TO ALL "RIDS" RECIPIENTS:

C

PLEASE MP US TO

ED= WSTE!

00N=TCT THE DOCUMENT CONTRL DESK,

ROCK P1-37 (EXr. 20079) 'tO ELIMI

YOUR WM F 0

DISTIBTION

LISTS FOR DOCUMNENS Y00 DIT NEEDI

O

TOTAL NUMBER OF COPIES REQUIRED: LTTR

23

ENCL

3

FEB 2 198

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/88-30

Thank you for your response of January 8, 1989, to our request for informa

tion,

issued on December 8, 1988,

concerning actions being taken at your

H. B. Robinson facility in order to improve the Operation Department's review

for applicable Technical Specification action statements upon determination of

inoperable equipment. We have evaluated your response and found it acceptable.

We will examine the implementation of your corrective actions during future

inspections.

We appreciate your cooperation in this matter.

Sincerely,

Original Signed by

Luis A. Reyes

Luis A. Reyes, Director

Division of Reactor Projects

cc:

C. R. Dietz, Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

State of South Carolina

bcc:

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

8903100461 890221

PDR

ADOCK 0500261

0

PNU

RH

RII

RII

RII

RCarroll:ser

HDance

DVerrelli

BHehl

02/JD/89

02/-o/89

02/i /89

02/

/89