ML14191B087
| ML14191B087 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/24/1989 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B088 | List: |
| References | |
| NUDOCS 8903100429 | |
| Download: ML14191B087 (3) | |
See also: IR 05000261/1989004
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION .NBR:8903100429
DOC.DATE: 89/02/24 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
CKERT.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-04 on 890130-0203.No violations
noted.
1
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE: _
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
.1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1'
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
.1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
,-GE-ERMAN,
J
1
1
OGC/HDS1
1
1
_REG-ELLE
02
1
1
RGN2
FILE
01
1
1
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
I
D
S
A
D
D
NM OI' ALL "RIDS" RECPIENIS:
S
PLEASE EP US TO REDCE
STE!
CNTACT THE DOCUN1T aTRL DESK,
ROCM P1-37 (EXT. 20079) T0 ELIMIN
YOUR NNE FyC DIRIBDTICE
LISTS POR DOCUMENTS YOU DC'T NEI
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/89-04
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
C. A. Hughey on January 30 -
February 3, 1989.
The inspection included a
review of activities authorized for your H. B. Robinson. facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Thomas R. Decker, Acting Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
8903100429 890224
PDR ADOCK 05000261
G
PNU
rEa
Carolina Power and Light Company
2
Enclosure:
NRC Inspection Report
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RH
II,
RII
CHughey. JKhle
PFre4-k-en
6
2/47/89
2//89
2/ /89