Forwards Insp Rept 50-261/88-38 on 881211-890110.No Violations or Deviations Noted.Unresolved Item Re Hydrogen Intrusion Into Plant Air Sys Identified
ML14191B075
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/06/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191B076 List:
References
NUDOCS 8902150253
Download: ML14191B075 (3)


See also: IR 05000261/1988038

Text

ACCELERATED

DISTRIBUTION

DEMONSTRA ION

SYSWTEM1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8902150253

DOC.DATE: 89/02/06 NOTARIZED: NO

DOCKET #

CIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

R

SUBJECT: Forwards Insp Rept 50-261/88-38 on 881211-890110.No

violations or deviations noted.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR / ENCL

_

SIZE:,--,

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation esponseD

NOTES:

S

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

LO,R

1

1

A

INTERNAL: AEOD

1

1

AEOD/DEIIB

1

1

D

DEDRO

1

1

NRR SHANKMAN,S

1

1

NRR/DEST DIR

1

1

NRR/DLPQ/PEB 11

1

1

D

NRR/DLPQ/QAB 10

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

S

NRR/DRIS DIR 9A

1

1

NRR/PMAS/ILRBl2

1

1

NUDOCS-ABSTRACT

1

1

OELIEBERMAN,J

1

1

OGC/HDS1

.1

'1

.02

1

1

RGN2

FILE

01

1

1

RNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

D

A

D

D

NOTE TO ALL "RIDS" RECIPIE1TS:

S

PLEASE HELP US TO REDUCE WASTE!

CNTACT THE DOCUMENT CDITROL DESK,

ROOM Pl-37 (EXT.

20079) TO ELDNTE YOUR NE FROM DISTRIBUTION

LISTS FOR DOCUIMNS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

23

ENCL

23

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply-and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/88-38

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. W. Garner on December 11, 1988 - January 10, 1989. The inspection included

a review of activities authorized for your H. B. Robinson facility.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

Your attention is invited to the unresolved item identified in the inspection

report concerning hydrogen intrusion into your plant air systems. This matter

will be pursued during future inspections and has been included on the agenda

for the Enforcement Conference to be held in Region II on February 9, 1989.

In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

(See page 2)

Carolina Power and Light Company

2

2pi

Enclosure:

Inspection Report No. 50-261/88-38

cc w/encl:

C. R. Dietz, Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

State of South Carolina

bcc w/encl:

NRC Resident Inspector

DRS Technical Assistant