ML14191B075
| ML14191B075 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/06/1989 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B076 | List: |
| References | |
| NUDOCS 8902150253 | |
| Download: ML14191B075 (3) | |
See also: IR 05000261/1988038
Text
ACCELERATED
DISTRIBUTION
DEMONSTRA ION
SYSWTEM1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8902150253
DOC.DATE: 89/02/06 NOTARIZED: NO
DOCKET #
CIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
R
SUBJECT: Forwards Insp Rept 50-261/88-38 on 881211-890110.No
violations or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR / ENCL
_
SIZE:,--,
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation esponseD
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
A
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
D
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
D
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
S
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRBl2
1
1
NUDOCS-ABSTRACT
1
1
OELIEBERMAN,J
1
1
OGC/HDS1
.1
'1
.02
1
1
RGN2
FILE
01
1
1
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
D
A
D
D
NOTE TO ALL "RIDS" RECIPIE1TS:
S
PLEASE HELP US TO REDUCE WASTE!
CNTACT THE DOCUMENT CDITROL DESK,
ROOM Pl-37 (EXT.
20079) TO ELDNTE YOUR NE FROM DISTRIBUTION
LISTS FOR DOCUIMNS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply-and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-38
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on December 11, 1988 - January 10, 1989. The inspection included
a review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Your attention is invited to the unresolved item identified in the inspection
report concerning hydrogen intrusion into your plant air systems. This matter
will be pursued during future inspections and has been included on the agenda
for the Enforcement Conference to be held in Region II on February 9, 1989.
In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
(See page 2)
Carolina Power and Light Company
2
2pi
Enclosure:
Inspection Report No. 50-261/88-38
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RII
RCarroll:sda
HDance
02/
/89
02/ /89