ML14191B063
| ML14191B063 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/12/1989 |
| From: | Herdt A NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B064 | List: |
| References | |
| NUDOCS 8901270219 | |
| Download: ML14191B063 (3) | |
See also: IR 05000261/1988031
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901270219
DOC.DATE: 89/01/12
NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
ERDT,A.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-31 on 881212-16.No violations
or deviations noted.
R
DISTRIBUTION CODE: IE01D
COPIES RECEIVED:LTR J ENCL
SIZE: _______
I
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
D
NOTES:
S
RECIPIENT
COPIES
-
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
/
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
.1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
S
NUDOCS-ABSTRACT
1
1
OI-EBERMAN,J
1
1
OGC/HDS1
1
1
RE
i9
02
1
1
RGN2
FILE
01
1-
1
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
RESL MARTIN,D
1
1
S
A
D
D
NOrE TO ALL "RIDS" RECIPIENTS:
S
PLEASE HELP US TO REIDUCE
!
CONIACT THE DOCUMET CDNTROL DESK,
ROOM P1-37 (EXT. 20079)
O ELCXM
YOUR RMWM
FRM DISTRIBUION
LISTS FOR DOCUMS YOU DON'T NEE!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
24
ENCL
24
JAN 121989
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-31
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
D. C. Ward on December 12-16,
1988.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
8901270219 890112
ADOCK 05000261
_________________________
o
Carolina Power and Light Company
2
JAN 12 18
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
JR. E. Morgan, Plant General Manager
State of South Carolina
,bcc w/encl:
/NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
A. Krasopolis, RI
J. Ulie, RIII.
JJ. Singh, RIV
.C. Ramsey, RV
.D. Kubicki,
RII
RI
RHI
RH
DWard:tj
JHarris
TConlon
PFridrickson.
01/' /89
01/ft /89
01/ t/89
01/
J89