ML14191B042
| ML14191B042 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/22/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B043 | List: |
| References | |
| NUDOCS 8901090274 | |
| Download: ML14191B042 (3) | |
See also: IR 05000261/1988014
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYS'TEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8901090274
DOC.DATE: 88/12/22 NOTARIZED: NO
DOCKET #
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
HERDT,A.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
R
SUBJECT: Forwards Insp Rept 50-261/88-14 on 881128-1202.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
_
SIZE:
D
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation
esponse
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
/
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
D
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN_,J
1
1
OGC/HDS1
1
1
EGFILE
1
1
RGN2
FILE 01
1
1
W
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
RESL MARTIND
1
1
R
S
D
NOTE TO0 ALL "RIDS" RECIPIERTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMET
ONTROL DESK,
ROOM Pl-37 (EXT.
20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMERS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
24
ENCL
24
Docket No. 50-261
License No. DPR-23
-Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gent emen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-14
This refers to the Nuclear Regulatory Commission
(NRC)
inspection conducted
by N. Economos on November 28 -
December 2, 1988.
The inspection included a
review of activities authorized for your Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
O
these areas, the inspection consisted of selective examinations of procedures
and representative records,
intervieWs with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identi
fied.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Alan R Herdt, Chief
Engine ring Branch
Division of Reactor Safety
Enclosure:
NRC Inpection Report
cc w/encl:
(See page 2)
A
i
DEC 2 21988
Carolina Power and Light Company
2
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
-R.
E. Morgan, Plant General Manager
State of South Carolina
cc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RI
Econ mos:ser
/JBlake
PFredrickson
12// /88
12/
i/88
1/
8