ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901030034
DOC.DATE: 88/12/20
NOTARIZED: NO
DOCKET #
Adk'ACIL:50-261-H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
qWJULIAN,C.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-33 on 881114-18.No violations
noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR / ENCL /
SIZE: ;+L3
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
/
PD2-1 PD
1
1
LO,R
1
1
A
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
D
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
D
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
S
OE LIBERMAN,J
1
1
OGC/HDS1
1
1
02
1
1
RGN2
FILE
01
1
1
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
RESL MARTIN,D
1
1
R
S
D
D
NorE 'IO ALL "RIDS" RECIPIENTS:
S
PLEASE HEILP US 'O REDUB WSTE!
CONTACT THE DDCUMENT CONIROL DESK,
ROOM P1-37 (EXT. 20079)
MI ELIMINAT
YOUR NAM FRCHDSTIUTO
LISTS FIOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
December 20, 1988
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering.
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION.REPORT NO. 50-261/88-33
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
K. Jury on November 14-18, 1988. The inspection included a review of activities
authorized for your H. B. Robinson facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8901030034 881220
(Original signed by C. A..Julian)
PDR ADOCK 05000261
Caudle A. Julian, Chief
0
~~PNUCadeAJuinChf
Operations Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/encl:
C. R.
Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc:
(See page 2)
Carolina Power and Light Company
December 20. 1988
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RII
RII
RII
RH
RH
RI
KJury:sn
ELea
TCoo er
mith
GB 1 sle PFredrickson
CAJu ian
121e188
12/.5'/88
12/1/88 12//3/88 12/LU/88 12/;p/88
12/ac/88