ML14191B017
| ML14191B017 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/20/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B018 | List: |
| References | |
| NUDOCS 8811030417 | |
| Download: ML14191B017 (1) | |
See also: IR 05000261/1988023
Text
OCT 2 0 1988
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/23
The cover page of the subject inspection report was inadvertently not signed by
-the approving Section Chief.. Please replace the cover page in.your copy of the
report with the attached page.
We regret any inconvenience this may have caused..
Sincerely,
ORIGINAL SIGNED BY
DAVID M. VERRELLI
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Cover Page
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS, Technical Assistant
Document Control Desk
RII
RH
BCa rol
PFre rickson
10/t,)/88
10/7 /88
88110:30417 SS1020
i
PDR ADOCK 05000261
F