ML14191A998
| ML14191A998 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/20/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191A999 | List: |
| References | |
| NUDOCS 8809300169 | |
| Download: ML14191A998 (3) | |
See also: IR 05000261/1988022
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
WCCESSION NBR:8809300169
DOC.DATE: 88/09/20 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
COLLINS,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-22 on 880802-0902.No violations
or deviations noted.
R
DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR
ENCL
SIZE:
6
TITLE: Emergency Preparedness-Appraisal/Confiriatory Action Ltr/Exercise Rep
NOTES:
D
RECIPIENT
COPIES
RECIPIENT
COPIES
S
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
/
INTERNAL: ARM/DAF/LFMB
1
0
NRR/DREP/EPB 10
1
1
A
jZS/
B12
1
1
NUDOCS-ABSTRACT
1
1
02
1
1
RGN2
FILE
01
1
1
D
RGN2/DRSS/EPRPB
1
1
EXTERNAL: LPDR
1
1
NRC PDR
1
1
D
1
1
s
R
I
D
S
A,
D
D
S
TOTAL NUMBER OF COPIES REQUIRED: LTTR
12
ENCL
11
SEP 2 0 1988
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-22
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
E. D. Testa on August 29-September 2, 1988. The inspection included a review
of activities authorized for your H. B. Robinson facility.
At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Orgh 2pged Ly
D. M. Collins
Douglas M. Collins, Chief
-
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
8809300)16'9 8809Q,20
ADO'C:K 050C))261
PDC:
Duke Power Company
2
Enclosure:
Inspection Report
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
W. D. Travers, NRR
J. Heard, FEMA RIV
RH
RII
RI
ET t
TDecker
P edrickson
9/ /88
9/> /88
9/J88