Forwards Insp Rept 50-261/88-08 on 880516-20 & Notice of Violation.Encl Notice Inadvertently Omitted from Insp Rept 50-261/87-06 Sent on 871113.No New Violations Noted
ML14191A970
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/12/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14191A971 List:
References
NUDOCS 8808260427
Download: ML14191A970 (2)


See also: IR 05000261/1988008

Text

August 12, 1988

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

MTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/88-08)

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

M. J. DeGraff on May 16 - 20,

1988.

The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

.

identified in

the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and eepresentative records, interviews with personnel,

and observation of

activities in progress.

No new violations or deviations were identified during this inspection.

The

two violations described in the enclosed Notice of Violation were identified

during the SSFI inspection conducted March 9 - April

15,

1987,

and were

inadvertently omitted from the Notice of Violation sent to you by our letter

dated November 13,

1987.

Based on the information provided during the

Enforcement Conference on June 26,

1987, your July 10,

1987, response to NRC

Inspection Report No.

50-261/87-06 and our review of your corrective actions

during this inspection, no response to the enclosed Notice of Violation is

required.

The enclosed Inspection Report documents oral commitments (see paragraph 3)

made by a licensee representative and discussed in the exit interview.

If

your understanding of these commitments differs from the report statements,

please inform this office promptly.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

.

will be placed in

the NRC Public Document Room.

SS08260427 880-812

PDR

ADOCK 05000261

0

PDC

P-D

Carolina Power and Light Company

2

August 12, 1988

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by M. B. Shymlock for)

Caudle A. Julian, Chief

Operations Branch .

Division of Reactor Safety

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

b-.

R. Dietz, Manager, Robinson

Nuclear Project Department

. E. Morgan, Plant General Manager

bc; w/encls:

C ,Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of South Carolina

RII

RH

RH

RII

raff:ser

Mgh lock

kredr

kson

5/88

0688

88

  1. ///88

GJenk ns

Cduli

o/1 ;J,8

8/1- /88