ML14191A942
| ML14191A942 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/11/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191A943 | List: |
| References | |
| NUDOCS 8807210304 | |
| Download: ML14191A942 (3) | |
See also: IR 05000261/1988015
Text
GGELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
A9SSION NBR:8807210304
DOC.DATE: 88/07/11 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
CLINE,W.E.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-15 on 880613-17.No violations
noted.
DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR
ENCL
SIZE:2p,
TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 LA
1
0
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD/DOA
1
0
NRR/DRIS/SGB 9D
1
1
NRR/DRIS/SIB 9A
1
1
N -aPgAS/ILRB12
1
0
NUDOCS-ABSTRACT
1
1
REG FILE
02
1
1
RGN2
FILE
01
1
1
EX
NL: LPDR
1
1
NRC PDR
1
1
1
1
- E
TOTAL NUMBER OF COPIES REQUIRED: LTTR
13
ENCL
10
SAFEGUARDSlNFOR
.ION
- 0JUL11.s
Docket No. 50-261
License No. OPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/88-15)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. W. Stansberry on June 13-17, 1988. The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within.
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel.,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards. activitiesiand
security measures are exempt from public disclosure. Therefore,.the enclosure
to this letter with the exception of the report cover page, which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
William E. Cline, Chief
Nuclear Materials Safety and
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
8807210304 880711
OSU
ADOCK 05000261
ONTAINS
Q
GU7mo
oxo:g
UU
I
PASATION THIS
SAFEGUA RDSsNsecomouse
U RO S I Nm
s
() 1)
AAA--7-
/
!F
GUA
DS INFO:GAA10
Carol ina Power and Light Company
2 A T ION
JUL 1 1 1988
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/encT:
G. P. Beatty, Jr., Vice President
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encl:
NRR/DRIS/SB
bcc w/Inspection Summary:
Document Control Desk (RIDS IE04), 016
NRC Resident Inspector
State of South Carolina
RII
RIF
.
tOsTRE
fill
.I
Ns
WMtncy:tm
Guire
PF
rickson
U
P
A
O
1y7m
07/( /88
07/&1/88
07/(0/88
SAFEGUARDS INFORMATION