ML14191A927

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/88-09 on 880502-06.No Violations or Deviations Noted
ML14191A927
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/24/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14191A928 List:
References
NUDOCS 8806060272
Download: ML14191A927 (2)


See also: IR 05000261/1988009

Text

S2 4 ~

Docket No. 50-261

License No. DPR-23

Ca

ina Power and Light Company

N:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/88-09

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

R. R. Marston on May 2-6, 1988. The inspection included a review of activities

authorized for your H. B. Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

O

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report

cc w/encl:

(See page 2)

8'80606.272 8G:0524

PER

ADOCK 05000261

G'

DCD

Carolina Power and Light Company

2

cc w/encl:

leP. Beatty, Jr., Vice President

R binson Nuclear Project Department

. E. Morgan, Plant General Manager

b w/encl:

C Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of South Carolina

II

RH

RI4

rston Jae

PF

dr ckson

/1/88

5/11/88

5/,,/88