ML14191A888

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/87-36 on 871116-20.No Violations Noted
ML14191A888
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/07/1987
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A889 List:
References
NUDOCS 8712110309
Download: ML14191A888 (3)


See also: IR 05000261/1987036

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8712110309

DOC.DATE: 87/12/07 NOTARIZED: NO

DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

CLINE,W.E.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEYE.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/87-36 on 871116-20.No violations

noted.

DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR

ENCL

SIZE: #

TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 LA

1

0

PD2-1 PD

1

1

ECCLESTONK

.1

1

INTERNAL: AEOD/DOA

1

0

NRR/DLPG/PEB

1

1

NRR/DRIS/SGB

1

1

NRR/DRIS/SIB

1

1

NRR/PMAS/ILRB

1

0

REG

P

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

TOTAL NUMBER OF COPIES REQUIRED: LTTR

13

ENCL

10

SAFEGUARDS INFORMATION

DEC0 7 1987

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/87-36

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. Tillman on November 16-20,

1987.

The inspection included a review of

activities authorized for your H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8712110309 871207

William E. Cline, Chief

PDR ADOCK 05000261

Nuclear Materials Safety and

PDR

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: (See page 2)

SAFEGUARDS INFORMATION

GA

S

u

q

ION

PAGE ISDE

INTS

0 '-mi ong

INFORMATION

Carolina Power and Light Company

2

DEC0 7 1987

Enclosure:

NRC Inspection Report

cc w/encl:

G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

NRC Resident Inspector

DRS Technical Assistant

NRR/DRIS/SB

bcc w/Inspection Summary:

Document Control Desk (RIDS IEO4), 016

State of North Carolina

NC ostTRE COANS

.

RIII

R

SAFZcuAbS

ATi 1 lman:tj

re

PFr

n

AGC XS DEcoNg

1S/EG/87

12,A

D

/87

1I/O/87

SAFEGUARDS INFORMATION