ML14191A875
| ML14191A875 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/30/1987 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191A876 | List: |
| References | |
| NUDOCS 8711090152 | |
| Download: ML14191A875 (3) | |
See also: IR 05000261/1987032
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION .NBR:8711090152
DOC.DATE: 87/10/30 NOTARIZED: NO
DOCKET #
)W
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
CLINE,W.E.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/87-32 on 870929-1002.No violations
noted.
DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR
ENCL
SIZE:
+
TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 LA
1
0
PD2-1 PD
1
1
ECCLESTONK
1
1
INTERNAL: AEOD/DOA
1
0
NRR/DRIS/SGB
1
1
_/-DR& S<SIB
1
1
NRR/PMAS/ILRB
1
0
E02
1
1
RGN2
FILE 01
1
1
EXTERNAL: LPDR
1
1
NRC PDR
1
1
1
1
TOTAL NUMBER OF COPIES REQUIRED: LTTR
12
ENCL
9
SAFEGUARDS INFORMATION
OCT 30 W7
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/87-32
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. D. Ennis on September 29 -
October 2, 1987.
The inspection included a
review of activities authorized for your Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosure
to this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
871 1090152 671030
William E. Cline, Chief
ADOCK 05000261
Nuclear Materials Safety and
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure;
(See page 2)
ENCLOSURE CONTAINS
SAFEGUARDS INFORMTION
PON SEPARATION THIS
SAFEGUARDS
....
'SDECONTROLLED.
SAFEIAPDS INFORMAoN
o
SAFEGUARDS INFORMATION
Carolina Power and Light Company
2
3 (987
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/encl:
G. P. Beatty, Jr., Vice President
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encl:
NRR/DRIS/SB
bcc w/Inspection Summary:
Document Control Desk (RIDS IE04), 016
State of South Carolina
.I
II
R
I?
JD nis:
RMc uire
ine
P E redrickson
10/9,/87
10
/87
10 ' /87
EAqfO87
RE CONTAINJS
SAFF~tjSAFEGUApjbS
INFrORRATIon
UON SEPARATION THIS
SAFF
A
JA DS I
oMA
PAGE 19 DEcoN~aLE