Forwards Insp Rept 50-261/87-32 on 870929-1002.No Violations Noted
ML14191A875
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/30/1987
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A876 List:
References
NUDOCS 8711090152
Download: ML14191A875 (3)


See also: IR 05000261/1987032

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION .NBR:8711090152

DOC.DATE: 87/10/30 NOTARIZED: NO

DOCKET #

)W

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

CLINE,W.E.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/87-32 on 870929-1002.No violations

noted.

DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR

ENCL

SIZE:

+

TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 LA

1

0

PD2-1 PD

1

1

ECCLESTONK

1

1

INTERNAL: AEOD/DOA

1

0

NRR/DRIS/SGB

1

1

_/-DR& S<SIB

1

1

NRR/PMAS/ILRB

1

0

E02

1

1

RGN2

FILE 01

1

1

EXTERNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

TOTAL NUMBER OF COPIES REQUIRED: LTTR

12

ENCL

9

SAFEGUARDS INFORMATION

OCT 30 W7

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/87-32

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. D. Ennis on September 29 -

October 2, 1987.

The inspection included a

review of activities authorized for your Robinson facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

no violations or deviations were

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

871 1090152 671030

William E. Cline, Chief

PDR

ADOCK 05000261

Nuclear Materials Safety and

PDR

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure;

(See page 2)

ENCLOSURE CONTAINS

SAFEGUARDS INFORMTION

PON SEPARATION THIS

SAFEGUARDS

....

'SDECONTROLLED.

SAFEIAPDS INFORMAoN

o

SAFEGUARDS INFORMATION

Carolina Power and Light Company

2

3 (987

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/encl:

G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

NRR/DRIS/SB

bcc w/Inspection Summary:

Document Control Desk (RIDS IE04), 016

State of South Carolina

.I

II

R

I?

JD nis:

RMc uire

WE

ine

P E redrickson

10/9,/87

10

/87

10 ' /87

EAqfO87

RE CONTAINJS

SAFF~tjSAFEGUApjbS

INFrORRATIon

UON SEPARATION THIS

SAFF

A

JA DS I

oMA

PAGE 19 DEcoN~aLE