ML14191A856

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/87-27 on 870810-14.No Violations Noted
ML14191A856
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/01/1987
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A857 List:
References
NUDOCS 8709080268
Download: ML14191A856 (3)


See also: IR 05000261/1987027

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8709080268

DOC.DATE: 87/09/01

NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

  • INEW.E.

Region 2, Office of Director

ECIP.NAME

RECIPIENT AFFILIATION

LEY,E.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/87-27 on 870810-14.No violations

noted..

DISTRIBUTION CODE: IEO4D

COPIES RECEIVED:LTR

ENCL /

SIZE:

G

TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 LA

1

0

PD2-1 PD

1

1

ECCLESTON,K

1

1

INTERNAL: AEOD/DOA

1

0

NRR/DRIS/SGB

1

1

N.,/RDRIS/SIB

1

1

NRR/PMAS/ILRB

1

0

REG FIL

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

TOTAL NUMBER OF COPIES REQUIRED: LTTR

12

ENCL

9

SAFEGUARDS i

- 1fi

I JON~

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/87-27

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Gibson on August 10-14,

1987.

The inspection included a review of

activities authorized for your H. B..

Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

no violations or deviations were

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

ENCLOSURZ CONTAINS

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLE.

B7OO32~B

7F~lSAFEGUARDS

INFORMATION

~(2J(

8709080268 870901

SA E U

R S/"'11U"R ITO

PDR

ADOCK 05OO0261

0

PDR

C SAFEGUARDS INFORMATION

Carolina Power and Light Company

2

SEP 0 1 1987

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/encl:

G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

NRR/DRIS/SB

bcc w/Inspection Summary:

Document Control Desk (RIDS IE04), 016

NRC Resident Inspector

State of Nouth Carolina

vir

ENCLOSURE CONTAINS

GFGibsonj

DRMcGuire

PFrederickson

SAFEGUARDS INFORMATION

08/71'/87

08/27/87

08/! /8

'UPON SEPARATION THIS

PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION