ML14191A359
| ML14191A359 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/14/1988 |
| From: | Lo R Office of Nuclear Reactor Regulation |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191A360 | List: |
| References | |
| TAC-59135, NUDOCS 8810180454 | |
| Download: ML14191A359 (2) | |
Text
Docket No. 50-261 October 14, 1988 DISTRIBUTION Docket File E. Jordan NRC PDR (MNBB 3302)
Mr. E. E. Utley Local PDR B. Grimes Senior Executive Vice President PD21 r/f (9A2)
Power Supply and Engineering & Construction S. Varga (14E4)
S. Newberry Carolina Power & Light Company G. Lainas (7E12)
Post Office Box 1551 E. Adensam D. Lynch Raleigh, North Carolina 27602 P. Anderson (7E12)
R. Lo R. Stevens
Dear Mr. Utley:
OGC (7E12)
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - ATWS RULE (10 CFR 50.62) (TAC NO. 59135)
The staff completed its review of your proposed implementation of the Anticipated Transient Without Scram (ATWS) requirements of 10 CFR 50.62 paragraph (c)(1).
The staff has concluded that the proposed ATWS mitigating system actuation circuitry (AMSAC) designs are acceptable and in compliance with the ATWS Rule requirements. The staff's conclusion is subject to the successful completion of certain human-factors engineering reviews, as noted in the staff's Safety Evaluation Report that is enclosed. In addition, the staff is reviewing the use of the Technical Specifications for the ATWS requirements. Pending the staff's resolution of the Technical Specifications issue, you should continue with scheduled installation and planned operation of the AMSAC designs utilizing administratively controlled procedures.
Sincerely, Ronnie H. Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/II
Enclosure:
Safety Evaluation cc:
See next page OFC
- LA:PD R:PM:PD21:DR R:D:
1:
PR DRII:DRP. :
NAME :P.
n :.
LO:jfw
- E.
nsam G.
nas DATE */
!/88
/3/88
/
/88
/
/88 OFFICIAL RECORD COPY I 8131s454 881014 PDR ADOCK 0500 1261 P
Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:
Mr. R. E. Jones, General Counsel Mr. Dwayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch P. 0. Box 1551 Division of Facility Services Raleigh, North Carolina 27602 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina Mr. C. R. Dietz P.O. Box 629 Manager, Robinson Nuclear Project Raleigh, North Carolina 27602 Department H. B. Robinson Steam Electric Plant Mr. D. E. Hollar P. 0. Box 790 Associate General Counsel Hartsville, South Carolina 29550 Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550 Mr. Avery Upchurch, Chairman Triangle J Council of Governments 100 Park Drive Post Office Box 12276 Research Triangle Park, NC 27709