ML14190A666

From kanterella
Jump to navigation Jump to search
Forwards Hb Robinson 2 Updated FSAR as of 820122,reflecting Changes Made Since Original FSAR Submittal on 681126
ML14190A666
Person / Time
Site: Robinson 
Issue date: 07/19/1982
From: Utley E
Carolina Power & Light Co
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML14190A667 List:
References
NUDOCS 8207210377
Download: ML14190A666 (3)


Text

REGULATORY NFORMATION DISTRIBUTION SYA M (RIDS)

ACCESSION NBR:8207210377 DOC.OATE: 82/07/19 NOTARIZED: YES DOCKET #

FACIL:50-261 H. 6. Robinson Plant, Unit 2, Carolina Power and Ligh 05000261 AUTHNAME AUTHOR AFFILIATION UTLEY,E,E,

>Carolina Powen & Light Co, RECIPNAME RECIPIENT AFFILIATION

DENTONHR, Office of Nuc1,lear Reactor Regulation, Director

SUBJECT:

Forwards MB Robinson 2 updated FSAR as of 820122,reflectinq changes made since original FSAR submittal on 681126.

y DISTRIBUTION CODE: A053S COPIES RECEIVED:LTR J ENCL _

SIZE:

t TITLE: Updated FSAR(50,71)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTIR ENCL ID CODE/NAME LTTR ENCL

ROSSW, 01 1

1 INTERNAL: IE 05 1

1 REG FILE 02 1

1 RGN2 06 2

2 EXTERNAL: ACRS 09 1

1 FEMA 10 1

1 LPDR 04 1

1 NRC'PDR 03 1

1 NSIC 1

1 NTIS 1

1 TOTAL NUMBER OF COPIES REUUIRED: LTTR 11 ENCL 11

Carolina Power & Light Company JUL 19 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 SUBMITTAL OF UPDATED FINAL SAFETY ANALYSIS REPORT

Dear Mr. Denton:

In accordance with the requirements of 10CFR50.71(e) as published in the Federal Register on May 9, 1980, Carolina Power & Light Company (CP&L) hereby submits one (1) original and twelve (12) copies of the updated Final Safety Analysis Report (FSAR) for the H. B. Robinson Steam Electric Plant (HBR) Unit No. 2. The original FSAR for HBR was submitted on November 26, 1968 and was amended a number of times prior to the issuance of the Operating License. This Updated FSAR is organized in accordance with the guidelines of Regulatory Guide 1.70, Revision 3 and includes:

1.

Changes made in the facility or procedures as described in the original FSAR.

2.

Safety evaluations performed by CP&L in support of requested license amendments.

3.

Safety evaluations performed by CP&L in support of conclusions that changes did not involve an unreviewed safety.question.

4.

Analyses of new safety issues performed by or on behalf of CP&L at the request of the Commission.

5.

Administrative improvements including the simplification of plant flow diagrams have been included in order to facilitate the understanding of system descriptions.

8207210377 820719 PDR ADOCK 05000261 SPDR0 411 Fayetteville Street *P.

O. Box 1551 *Raleiah.

N. C. 27602

Harold R. Denton

-2 The Updated FSAR accurately presents changes made since the original FSAR submittal necessary to reflect information and analysis submitted to the NRC or prepared pursuant to NRC requirements. The Updated FSAR is current through January 22, 1982.

The drawings and figures in the FSAR are based on the plant drawings as of January 22, 1982. Recently, due to plant walkdowns, some changes in those drawings have been identified. These changes will be reflected in the first annual update of the FSAR.

Yours very truly, Z.E.ey Executive Vice President Power Supply and Engineering & Construction ONH/lr (250C6T3b)

Attachment cc:

Mr. G. Requa (NRC)

Mr. J. P. O'Reilly (NRC-II)

Mr. S. Weise (NRC-HBR)

E. E. Utley, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.

al)

My commission expires: My Commission Expires 9-23-85 r

AN?

%j AR 8 L

/

/ 01~.