January 7, 1992 DISTRIBUTION See attached page Docket No. 50-261 LICENSEE: CAROLINA POWER & LIGHT COMPANY FACILITY: H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2

SUBJECT:

NOVEMBER 22, 1991, LICENSING ACTIVITIES STATUS MEETING On November 22, 1991, the staff met with Carolina Power & Light Company (CP&L) to review the status of ongoing and upcoming licensing activities regarding the H. B. Robinson Steam Electric Plant (HBR), Unit No. 2. The list of attendees is provided in. Enclosure 2 is the licensee's 18-month regulatory schedule for HBR. During discussion of the items on this schedule, the licensee emphasized particular concern over the items related to Refueling Outage 14 that is scheduled to begin on March 28, 1992.

The licensee's planning for the outage was also discussed. Poor planning for the previous outage resulted in significant delays.

The licensee indicated that four months before the upcoming outage the planning has already progressed further than it had at the beginning of the last outage. The focus of the licensee's planning effort has been on minimizing shutdown risk. With that in mind, no mid-loop work is scheduled with fuel in the core.

The Structural and Geosciences Branch has proposed a structure audit at Robinson during the outage. The licensee indicated that the containment integrated leak rate test will be conducted between March 30 and April 11, 1992. After that, the containment will be available to the audit team until approximately May 17, 1992. The proposed time for the audit team on site is the week of April 13, 1992.

Sincerely, Orignal signed by:

Daniel H. Dorman, Project Manager Project Directorate II-1 Division of Reactor Projects I/II 4

Office of Nuclear Reactor Regulation

Enclosures:

As stated cc:

See next page LA:

1 RPE

PM:PD21:DRPE
D:

21*DRPE PA n

DDorman:d
EA e sam 1/

/92

1/ 3 /92
1/3 /92 92011,30204 920107 PDR ADO Ct o:.K 05000261 p

PDR

Mr. L. W. Eury H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:

Mr. H. Ray Starling Mr. Dayne H. Brown, Director Manager - Legal Department Department of Environmental, Carolina Power & Light Company Health and Natural Resources P. 0. Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 P. 0. Box 27687 Raleigh, North Carolina 27611-7687 Mr. H. A. Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff -

NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Vice President H. B. Robinson Steam Electric Plant Robinson Nuclear Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Heyward G. Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. Ray H. Chambers, Jr.

Columbia, South Carolina 29201 General Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, South Carolina 29550

LIST OF ATTENDEES Date:November 22. 1991 Time:9:30 am Location:OWFN 10-B-13

Purpose:

Robinson Licensing Status Name Affiliation Title S. D. Floyd CP&L Mgr -

Nuclear Licensing R. W. Prunty CP&L Mgr -

RNP Nuc Licensing Talmadge Clements CP&L Mgr -

Transient Analyses J. D. Kloosterman CP&L Mgr -

Reg Compliance Jan Kozyra CP&L Project Engineer E. G. Adensam NRR Project Director D. H. Dorman NRR Project Manager

ATTACHMENT 2.

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 1 1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANI FEBIMARIAPRIMAYIJUNIJULIAUGISEPIOCTINOVIDECIJANIFEB AR 1A/4 THIRD TEN YEAR ISX/IST RELIEF*REQUESTS NRC APPROVAL mouummeaummes 2/19 RD IB/3 REDUCTION OF REQUIRED S/D MARGIN TO 6%

CP&L SUBMITTAL ome 10/31 ISSUE TSC u..u.....m........

3/28 RD f/4 RELIEF REQUESTS (CODE CASE N-498 AND IWC-5222(A) HYDRO TEST)

CP&L SUBMITTAL masns.

11/15 NRC APPROVAL moms 12/16 RD D/18 PROPOSED ALTER. TO 10CFR50.55A (SG WELD)

CP&L SUBMITTAL wumme.

11/15 NRC APPROVAL seme..

mmune 3/28 RD 1E/4 FIRE PROT (CABLING/

UNDER FALSE FLOOR -

CR)

CP&L SUBMITTAL monsoo. 12/3 ISSUE TSC usumemmemassess 5/3 1F/4 RCS HEATUP & COOLDOWN CURVES TSC CP&L SUBMITTAL usem 31 '

1/O ISSUE TSC 6/2 Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE;

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 2

1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANIFEBIMARIAPRIMAYIJUNIJULIAUGISEPIOCTINOVIDECIJANI FEBIMARI 3/4 DEGRADED GRID RELAY & SEQUENCIR RELAYS CP&L SUBMITTAL

.u..m..m..s 1/6 ISSUE TSC mannusumuseum 6/6

/4 DG TESTING -

TSC CP&L SUBMITTAL mmes 1/31 ISSUE TSC m..summeme.ummes 6/30 1/4 FIRE PROT TSC--GL 86-10; IR 91-13 CP&L SUBMITTAL

........... 2/19 ISSUE TSC

.sss.ummannum 7/19 1J/8 AFW PUMP TEST FREQUENCY TSC CP&L SUBMITTAL mammo. 3/15 ISSUE TSC sumem umees 8/15 1K/4 PORV RELIABILITY TSC (GL 90-06)

CP&L SUBMITTAL

  • ..u...

7/3 ISSUE TSC unsum mmu mmes 12/3 Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE;

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 3

1991 1992 11993 ITIPRI ISSUE IOCTINOVIDECIJANIFEBIMARIAPRIMAYIJUNIJULIAUGISEPIOCTINOVIDECIJANIFEBIMARI 2A/8 3.25 LIMIT -

SURV INTERVAL (GL 89-14)

ISSUE TSC nes *umm* umes sum*e 2/23 2B/4 SERV WATER SUPPLY & HVH-4 PIPING PENETRATIONS NRC APPROVAL 3/28 RD 2C/4 SUPP SE OF RESP TO STATION BLACKOUT RULE CP&L SUBMITTAL man 10/21 NRC APPROVAL 4/22 2D/13 ACCUMULATORS TSC (3.3.1.2)

CP&L SUBMITTAL mumum X12f a

ISSUE TSC m......mmu...mm.....

4/29 2E/4 NUCLEAR ASSESSMENT DEPT FUNCTIONAL CHGS TSC CP&L SUBMITTAL mmueum 1lif1 V'-

P ISSUE TSC

  • mmummememuseum 4/3 2F/4 ADD OF MOTOR OP TO RHR PUMP & SUCT VALVES CP&L SUBMITTAL mammVAVSft(

ISSUE TSC mmmmmmmnummemuuuu 6/6 2G/13 EMER DIESEL LOAD STUDY CP&L SUBMITTAL mm.m.

13 t-i Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE; *******

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 4

1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANIFEBIMARIAPRIMAY IJUNIJULIAUGISEPIOCTINOVIDECIJANIFEBIMAR 2H/4 EMERGENCY LIGHTING EXEMPTION REQUEST iA CP&L SUBMITTAL ME..

o NRC APPROVAL masuana mesaosm 7/7 21/28 INCREASED BURNUP CP&L SUBMITTAL

............ au 2/28 ISSUE TSC

  • ................... 7/28 2J/8 ISFSI LICENSE APPLICATION CP&L SUBMITTAL mu.ema 3/24 ISSUE 8/24 2K/4 CABLE AMPACITY REPORT CP&L SUBMITTAL mo.

6/30 2L/26 REMOVAL OF CYCLE SPECIFIC TS (GL 88-16)

ISSUE man.

12/30 2M/4 FIRE PROT TSC--REV APP R EXEMPT (BATTERY B RELOC)

CP&L SUBMITTAL ISSUE TSC Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE;

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 5 1991 1992 11993 AT/PRI ISSUE OCT INOV DEC IJAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR 3A/4 REV RESPONSE TO IEB 80-06 CP&L SUBMITTAL mae 11/27 3B/4 REV RESP TO BULL 88-10 (NON-CONF MCCB)

CP&L SUBMITTAL mume u

12/2 3C/4 PTS RULE 10 CFR 50.61 CP&L SUBMITTAL km 12/16 3D/4 BULL 88-11 PRESS SURGE LINE THERMAL STRAT CP&L SUBMITTAL m..

1/30 3E/4 GL 91-11: RESOL OF GIs 48 & 49 CP&L SUBMITTAL mmmeum.

1/31 3F/4 ANNUAL FSAR AMENDMENT (#10)

CP&L SUBMITTAL mu.... 2/1 3G/4 DCRDR SER -

CHGS IN SCHED/METHOD OF RESOL -

HEDS CP&L SUBMITTAL mams 3/31 3H/4 ACCESS AUTHORIZATION -

10CFR 73.56 CP&L SUBMITTAL

.mmum.

mem... 4/27 Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE; *******

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 6

1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANIFEBIMARIAPRIMAYIJUNIJULIAUGISEPIOCTINOVIDECIJANIFEIMAR 31/4 GL 88-20 IPE FOR SEV ACCIDENT CP&L SUBMITTAL

.mumm....uu 8/3 3J/4 GL 88-14 INSTRUMENT AIR SUPPLY SYST.

CP&L SUBMITTAL mm..

8/3 3K/4 RESOLUTION OF USI A-46 SEISMIC QUALIFICATION CP&L SUBMITTAL 3L/4 1992 EMERG PREP ANNUAL EMERG EX (GOALS & OBJ)

CP&L SUBMITTAL Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD REQUIRED DATE; *

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 7 1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJAN FEBIMARIAPRIMAYIJUNIJULIAUGI SEPIOCTINOVIDECIJANIFEBIMAR 5/04 TSC TO CORRECT IMPROPER REF TS TABLE 3.5-4 CP&L SUBMITTAL 5/08 APPLICAB OF TOLERENCE TO TS, SECT 3 SURV CP&L SUBMITTAL ISSUE TSC 5/13 REVISE DEF OF CONTROL ROD INOPERABILITY & ADD LCO CP&L SUBMITTAL ISSUE TSC 5/13 EVALUATE ELIM OF ACCELERATED TESTING OF ECCS & CS CP&L SUBMITTAL 5/13 CCW HYDRO TEST TSC CP&L SUBMITTAL ISSUE TSC 5/13 TSC TO PERMIT USE OF ALARMING DOSIMETERS CP&L SUBMITTAL ISSUE TSC 5/26 CV AIRLOCK -

ALLOWANCE CP&L SUBMITTAL Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD REQUIRED DATE; *

= SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 8

1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANIFEBIMARIAPRIMAYIJUNIJULIAUGI SEPIOCTINOVIDECIJANIFEBIMARI 5/29 CCW VENT VALVE BASIS CHANGE CP&L SUBMITTAL 5/29 AFW FLOW INDICATION TSC CP&L SUBMITTAL ISSUE TSC 5/49 RHR LEAK TEST TS 4.4.3.C (TSC)

CP&L SUBMITTAL ISSUE TSC 5/51 CHECK VALVE TEST CP&L SUBMITTAL ISSUE TSC 5/51 CLARIFY HVE 1A & lB OP REQUIREMENT CP&L SUBMITTAL ISSUE 5/51 GL 89-01 MOVE RETS FROM TS TO ODCM CP&L SUBMITTAL ISSUE TSC

/51 SI ACCUMULATOR LEVEL ADDITIONAL MARGIN CP&L SUBMITTAL ISSUE Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE; ****** = SCHEDULED OUTAGE

NOVEMBER 1991 HBR 18-MONTH REGULATORY SCHEDULE PAGE 9 1991 1992 11993 CAT/PRI ISSUE IOCTINOVIDECIJANIFEBINARIAPRIMAYIJUNIJULIAUGISEPIOCTINOVIDBCIJANIFEBIB R 5/51 CLARIFICATION OF BATTERY SURV INTERVAL CP&L SUBMITTAL ISSUE 5/51 CVCS/BORON DILUTION TSC CP&L SUBMITTAL ISSUE TSC 5/51 SW TECH SPECS LCO CP&L SUBMITTAL ISSUE TSC Dates prior to 11/06/91 are actuals; Dates after 11/06/91 are forecast; RD = REQUIRED DATE; *

= SCHEDULED OUTAGE

DISTRIBUTION Docket File NRC & Local PDRs PD21 Reading File TMurley/FMiraglia 12-G-18 JPartlow 12-H-18 SVarga GLainas EAdensam DDorman PAnderson OGC EJordan MNBB-3701 ACRS (10)

JWeschselberger 17-G-21 LReyes RII cc:

Licensee & Service List