H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH-CAROLINA. 29550 NO V 2 9 1983 Robinson File No: 11720 Serial: RSEP/83-1363 Mr. James P. O'Reilly, Regional Administrator United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 3100
- Atlanta, Georgia 30303 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.
2 DOCKET NO. 50-261.
OLICENSE NO.
DPR-23 RMERGENCY PREPAREDNESS
Dear Mr. O'Reilly:
In accordance with 10CFR50.54(q),
Carolina Power and Liht Company hereby transmits three copies of recent revisions to the H. B. Robinson Steam Electric Plant Emergency Plan and Procedures.
Due to several recent administrative changes some additional clarifications for this submittal are necessary.
On August 22, 1983, as part of the Plant Operating.Manual rewrite effort the Emergency Plan was revised from "Volume 13" to "Volume 1, Part II, Rev. 0".
No changes other than renumbering the procedures were made; and therefore, we did not provide this revision to your office. However, included in this submittal as Enclosure B, is a cross reference index between the old Plant'Emergency Procedure numbers and the new Plant Emergency Procedure numbers.
In addition to the above administrative change, we also revised our method for providing Emergency Plan and Procedure Revisions to NRC.
These revisions are now issued directly from the Plant at which the change was made, instead of our Corporate Office.
This will provide a more direct path from the procedure revision to the NRC. However, during the process of revising this process, the revisions identified on the enclosed list were inadvertently not provided within 30 days.
These revisions are included in this submittal.
8401050052 8312271 PDR ADOCK 05000261 N
5 EMRGCF PDRP
Letter to Mr. James P. O'Reilly Serial:
RSEP/83-1363 Page 2 If you have any questions on this subject, please contact our staff.
Very truly yours, R. E. Mo gan General Manager H. B. Robinson SEG Plant RDC:MMS/th Enclosures cc:
S. Weise (NRC-HBR) (cover letter only)
Document Control Desk (2)
USNRC Washington, D. C. 20555
Enclosure A to Serial: RSEP/83-1363 Page 1 Revisions not submitted within 30 days PEP-301 Rev. 1 9-07-83 PEP-170 Rev. 1 9-09-83 PEP-303 Rev. 1 09-09-83 PEP-102 Rev. 1 09-12-83 PEP-103 Rev. 1 09-12-83 PEP-104 Rev. 1 09-12-83 PEP-105 Rev. 1 09-12-83 PEP-201 Rev. 1 09-12-83 PEP-2004 Rev. 1 09-12-83 PEP-362 Rev. 3 08-19-83 PEP-344 Rev. 0 08-03-83 PEP-345 Rev. 5 08-05-83 Sect. 6.0 Rev. 16 08-11-83 (Plan)
PEP-1.0 Rev. 9 08-12-83 PEP-3.5.1 Rev. 5 08-12-83 PEP-206 Rev. 1 10-06-83 PLP-007 Rev. 1 10-19-83