ML14188B578
| ML14188B578 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/02/1988 |
| From: | Decker T NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8812190195 | |
| Download: ML14188B578 (2) | |
Text
ACCELERATED D]STRJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8812190195 DOC.DATE: 88/12/02 NOTARIZED: NO DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION DECKER,T.R.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT:
Advises that 881018 Rev 20 to radiological emergency plan meets requirements of 10CFR50.47(b) & App E & acceptable.
I DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR t ENCL O SIZE:
.TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:
S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1
LO,R 1
INTERNAL: ARM/DAF/LFMB 1
(
NRR/DREP/EPB 10 1
I, PMAS/ILRBl2 1
3 NUDOCS-ABSTRACT 1
REG LE 02 1
RGN2 FILE 01 1
27DRSS/EPRPB 1
1 S
EXTERNAL: LPDR 1
NRC PDR 1
NSIC 1
1 D
NO'TE TO ALL "RIDS" RECIPIERTS:
S PLEASE HELP US To REDU WASTE!
(DNTACT THE DOCUMENT (DNTROL DESK, ROCM P1-37 (EXT. 20079) TO ELIMINATE YOUR m
F O DISTRIBUTION LISTS FOR DOCMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL
,-T
Carolina Power and Light Company DEC 021988 ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
H. B. ROBINSON EMERGENCY PLAN REVIEW, REVISION 20, DOCKET NO. 50-261 We have completed our review of Revision 20 to your H. B. Robinson Radiological Emergency Plan dated October 18, 1988. Based on our review, we have concluded that the changes meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).
Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.
Should you have any questions regarding this letter., please contact Mr. William H. Rankin of our staff at 404-331-5586.
Sincerely, Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc: -C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc: NRC Resident Inspector DRS Technical Assistant Document Control Desk W. D. Travers, NRR RII R I I RI I ABoland "WRankin PFredrickson 1V1/
/88 11-p/1,/88 JUL88 SSD12190-A195 8'81202 FDR ADOCK 05000:261 Q
PD: