ML14188B330
| ML14188B330 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/04/1987 |
| From: | Grace J NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8706110081 | |
| Download: ML14188B330 (3) | |
Text
REGULATORY INA"MATION DISTRIBUTION SYST (RIDS)
ACCESSION NBR:8706110061 DOC.DATE: 87/06/04 NOTARIZED: NO DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION GRACEJ.N.
Region 2, Office of Director RECIP.NAME RECIPIENT AFFILIATION UTLEYE.E.
Carolina Power & Light Co.
SUBJECT:
Discusses util 670601 evaluation re justification for continued operation.NRC concurs u/evaluation.
DISTRIBUTION CODE: IEO1D COPIES RECEIVED:LTR A ENCL _SIZE:_
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-1 LA I
PD2-1 PD 1
ECCLESTON,K 2
INTERNAL: AEOD 1
DEDRO 1
ENF LIEBERMAN 1
.RR ROE M.L 1
NRR/DOEA DIR 1
NRR/DREP/EPB 1
NRR/DREP/RPB 2
NRR/DRIS DIR 1
1 NRR:P-MA-ILRB 1
OGC/HDS1 1
1 0=GFzILE-7i 1
1 RON2 FILE 01 1
EXTERNAL: LPDR I
NRC PDR 1
NSIC I
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL June 4, 1987 Docket No. 50-261 License No. DPR-23 Carolina Power and Light Company ATTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
JUSTIFICATION FOR CONTINUED OPERATION -
CONTAINMENT CABLE, ROBINSON UNIT 2, DOCKET NO. 50-261 We are in receipt of your Justification for Continued Operation (JCO) dated June 1, 1987, on your Robinson facility.
In light of this issue being of significant interest to us, we have reviewed the JCO for adequacy and concur in your evaluation.
Specifically, for restart and short-term operation, it is our understanding that your efforts to date have given you sufficient assurance that the suspect cable in-service inside containment is, in fact, cable purchased from Continental Wire and Cable Company.for that use and that this type cable has been previously qualified.
In order to justify continued operation, it is our understanding that within three months after return to power operation (2% power), you intend to complete the qualification verification of this cable by implementing and evaluating a program of additional data retrieval and similarity analysis. In addition, if evaluation of the results of this program does not positively establish qualification of the cable, it is our understanding that within six months after return to power operation, an environmental qualification testing program will have been completed to demonstrate qualification of this cable by test.
- However, if the additional data retrieval and similarity analysis give us cause to seriously question whether the cable can indeed be qualified, the question of continued operation will have to be revisited.
If your understanding of this matter is different from that stated above, please inform this office promptly.
Sincerely, 8706110081 870604 Original Signed by PDR ADOCK 05000261 Albert F. Gibson
/for P
PDR J. Nelson Grace Regional Administrator cc:
G. P. Beatty, Jr., Vice President Robinson Nuclear Project Department R. E. Morgan, Plant General Manager bcc: (See page 2)
Carolina Power and Light Company 2
June 4, 1987 bcc: NRC Resident Inspector Document Control Desk State of South Carolina RHI RH 7 R
RII PFredrickson DVerelli n
LReyes MErnst n6/21/7 06/4-/87 06/4./87 06/3 /87 06/ /87